Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Bag Mitali

Lok SabhaAITCSC seatArambag · West Bengal

MP score71/10078th of 542 in the 18th Lok Sabha
11th of 42 from West Bengal

Allocated limit

₹14.74 Cr

Median ₹14.70 Cr

Fund utilisation

96%

₹14.19 Cr recommended · 252 works
Above median (76%)

Paid to vendors

₹6.04 Cr

41% of allocation
Above median (37%)

Works completed

95

38% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP252 works

    ₹14.19 Cr · 96% of the ₹14.74 Cr allocated

  2. Sanctioned by the district192 works

    76% sanctioned · took 3.1 months on average (due within 45 days)

  3. Completed95 works

    ₹4.95 Cr final cost · 10.5 months from recommendation on average

60 works are still awaiting sanction, 30 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 252 works worth ₹14.19 Cr, a fund utilisation of 96%, higher than 85% of 18th Lok Sabha MPs.
  • The district has sanctioned 192 of them, taking 3.1 months on average.
  • ₹6.04 Cr has been paid to vendors, 41% of the allocation.
  • 95 works are complete, typically 10.5 months after recommendation. 95 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 29 vendors. The largest received 19%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 71/100: finishing works counts most

  1. Works completed 30%38Completed ÷ recommended works.
  2. Spending efficiency 20%82Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%41Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SN ENTERPRISE, 19% of payments across 29 vendors.

District sanction speed

87/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%87Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

252 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of ground floor additional class room AT WARD NO-04 UNDAR ARAMBAGH MUNICIPALITY.

    Education & librariesConstruction of rooms and halls in school and colleges· Hooghly· #294314

    ₹14.0 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • CONSTRUCTION OF JATRINIBAS SHED AT HARIHAR MARKET NEAR RAMU MALLICK CYCLE SHOP WITHIN HAZIPUR GP UNDER GOGHAT-II DEV. BLOCK.

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Hooghly· #309775

    ₹16.0 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • CONSTRUCTION OF CONCRETE FLOOR AT DEBKHANDA PRIMARY SCHOOL NEAR DURGA MANDIR WITHIN HAZIPUR GP UNDER GOGHAT-II DEV. BLOCK.

    Education & librariesConstruction of rooms and halls in school and colleges· Hooghly· #309801

    ₹3.5 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • CONSTRUCTION OF JALASATRA (STAND ALONE) ARJUNGORIA NEAR SHITALA MANDIR UNDER HAZIPUR GRAM PANCHAYAT WITHIN HAZIPUR DEV.BLOCK

    Drinking waterInstalling community drinking water plants· Hooghly· #309802

    ₹14.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • CONSTRUCTION OF JALASATRA (STAND ALONE) MADHUBATI NEAR SHIB MANDIR UNDER KAMARPUKUR GRAM PANCHAYAT WITHIN GOGHAT-II DEV.BLOCK.

    Drinking waterInstalling community drinking water plants· Hooghly· #309803

    ₹14.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at Arjungoria Near Play Ground Pachim Utter Corner within Hazipur G.P under Goghat-II Block

    Electricity & lightingLighting of public spaces· Hooghly· #313317

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at ASTARA NEAR CHORAK TOLA SAMSHAN WITHIN ASHTARA DATTAPUR G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313318

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at CHANDAR PARA NEAR BAROYARI TOLA WITHIN ASHTARADATTAPUR G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313319

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at MOZPUR NEAR MOZPUR ANGANWADI SCHOOL WITHIN ASHTARA-DATTAPUR G.P under TARAKESWAR Block.

    Electricity & lightingLighting of public spaces· Hooghly· #313320

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at ALIGORI NEAR BAROYARI TOLA WITHIN BALIGORI-I G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313433

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at BALLABHIPUR NEAR BALLABHIPUR SHASAN WITHIN BALIGORI-II G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313435

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at HAULI NEAR SHASAN KALI MANDIR WITHIN BHANJIPUR G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313437

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at BINOGRAM NEAR JALESWAR SHIV MANDIR WITHIN CHAMPADANGA G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313464

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at MIDDAYPARA NEAR MOSJID TOLA WITHIN CHAMPADANGA G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313467

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026
  • Installation of Electrical High Mast Light at CHAMPADANGA HIGH SCHOOL WITHIN CHAMPADANGA G.P under TARAKESWAR Block

    Electricity & lightingLighting of public spaces· Hooghly· #313468

    ₹4.9 L Awaiting sanction · 17 daysRec. 15 Oct 2026

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.