Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Shri Narendra Modi

Lok SabhaBJPVaranasi · Uttar Pradesh

MP score89/1001st of 542 in the 18th Lok Sabha
1st of 80 from Uttar Pradesh
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 296 works completed, score 100.

Allocated limit

₹16.21 Cr

Median ₹14.70 Cr

Fund utilisation

62%

₹10.10 Cr recommended · 216 works
Below median (76%)

Paid to vendors

₹9.69 Cr

60% of allocation
Above median (37%)

Works completed

207

96% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP216 works

    ₹10.10 Cr · 62% of the ₹16.21 Cr allocated

  2. Sanctioned by the district216 works

    100% sanctioned · took 4 days on average (due within 45 days)

  3. Completed207 works

    ₹9.69 Cr final cost · 8.2 months from recommendation on average

In plain words

What the numbers say

  • Recommended 216 works worth ₹10.10 Cr, a fund utilisation of 62%, higher than 26% of 18th Lok Sabha MPs.
  • The district has sanctioned 216 of them, taking 4 days on average.
  • ₹9.69 Cr has been paid to vendors, 60% of the allocation.
  • 207 works are complete, typically 8.2 months after recommendation. 207 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 96 vendors. The largest received 7.2%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 89/100: finishing works counts most

  1. Works completed 30%96Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%62Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%60Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: NEETU CONSTRUCTION, 7.2% of payments across 96 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

216 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Daniyalpur Ward No 37 interlocking work from Kanhaiya Rajbhars house 19208 to Nurulhodas house no 19100P Length 195 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241016

    ₹6.8 L Completed 12 Oct 2026Rec. 10 Oct 2025Paid ₹6.8 L
  • Rajghat Ward No 15 Interlocking work from Prema Devis house near Railway Colony through Ashu Upadhyays house to the front of Jagdish Sonkar house Length 186 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241126

    ₹5.0 L Completed 9 Oct 2026Rec. 10 Oct 2025Paid ₹5.0 L
  • Interlocking work from Gangapur Link Road to Rohit Yadavs house in Village Kaneri Block Kashi Vidyapeeth Length 127 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241250

    ₹8.0 L Completed 9 Oct 2026Rec. 10 Oct 2025Paid ₹8.0 L
  • Interlocking work from Hiralals house to Ravindra Kumars dairy in Gram Sabha Bhikharipur, Block Arazilines Harijan Basti. Length 82.00 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241299

    ₹4.2 L Completed 6 Oct 2026Rec. 10 Oct 2025Paid ₹4.2 L
  • Construction of 200 m RCC road from Bhaupur Kalikadham main road in Gram Sabha Pachwar Block Sevapuri. Length 184.00 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241439

    ₹9.1 L Completed 2 Oct 2026Rec. 10 Oct 2025Paid ₹9.1 L
  • Daniyalpur Ward No 37 Manoj Jaiswal alias Rajans house to 19226 Daniyal to Rajaram Pandit jis house Interlocking work Length 56 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241031

    ₹2.2 L Completed 30 Sept 2026Rec. 10 Oct 2025Paid ₹2.2 L
  • Interlocking work from Dashrath Pal Interlocking work from Somnath Patel house to Rambali Patel house in Gram Sabha Gangpur Sherpur Block Arazilines Length 156 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241232

    ₹7.5 L Completed 27 Sept 2026Rec. 10 Oct 2025Paid ₹7.5 L
  • Interlocking work from paved road (Jio tower) to Pramod Singhs house in Gram Sabha Barki Block Sevapuri. Length 70.00 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241339

    ₹4.0 L Completed 23 Sept 2026Rec. 10 Oct 2025Paid ₹4.0 L
  • Interlocking work from near Chauthi Vishwakarmas house to Nanhe Upadhyays house in Gram Sabha Ganjari Block Arazilines. Length 130.00 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241418

    ₹6.8 L Completed 22 Sept 2026Rec. 10 Oct 2025Paid ₹6.8 L
  • Interlocking work from Akbal Singhs house to Mahendra Singhs house in Gram Sabha Ghosila Block Sevapuri. Length 130.00 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241432

    ₹5.3 L Completed 15 Sept 2026Rec. 10 Oct 2025Paid ₹5.3 L
  • Interlocking work from paved road to Vijay Bahadurs house in Gram Sabha Ghosila Block Sevapuri. Length 100.00 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241435

    ₹5.2 L Completed 15 Sept 2026Rec. 10 Oct 2025Paid ₹5.2 L
  • Sewer and interlocking work from Daniyalpur Ward No 37 Chauhan Basti Ruppanpur Panchkroshi Bachdelaal Bind SA 3136A to Chhote Lal Binds house SE2136A Length 11 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241013

    ₹47,200 Completed 2 Sept 2026Rec. 10 Oct 2025Paid ₹47,200
  • Daniyalpur Ward No 37 Jawahar Chauhan SA 2136D2 Kallu Chauhan SA 2136 sewer and interlocking work Length 37 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241014

    ₹1.5 L Completed 2 Sept 2026Rec. 10 Oct 2025Paid ₹1.5 L
  • Interlocking work from Gram Sabha Tarapur main road to Ramsajivan house in Gram Sabha Akhri Block Kashi Vidyapeeth Length 72 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241234

    ₹2.7 L Completed 26 Aug 2026Rec. 10 Oct 2025Paid ₹2.7 L
  • Interlocking work from Pandit ji gate to Devan house in Gram Milkichak Block Arazilines Length 45 m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #241237

    ₹2.3 L Completed 22 Aug 2026Rec. 10 Oct 2025Paid ₹2.3 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.