Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri M K Raghavan

Lok SabhaKozhikode · Kerala

MP score92/100118th of 539 in the 17th Lok Sabha
5th of 20 from Kerala
Re-elected to the 18th Lok Sabha Then: 83% utilisation, 20 works completed, score 52.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

77%

₹7.57 Cr recommended · 221 works
Below median (98%)

Paid to vendors

₹7.25 Cr

74% of allocation
Below median (88%)

Works completed

213

96% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP221 works

    ₹7.57 Cr · 77% of the ₹9.81 Cr allocated

  2. Sanctioned by the district221 works

    100% sanctioned · took 11.3 months on average (due within 45 days)

  3. Completed213 works

    ₹7.22 Cr final cost · 14.8 months from recommendation on average

In plain words

What the numbers say

  • Recommended 221 works worth ₹7.57 Cr, a fund utilisation of 77%, higher than 5.4% of 17th Lok Sabha MPs.
  • The district has sanctioned 221 of them, taking 11.3 months on average.
  • ₹7.25 Cr has been paid to vendors, 74% of the allocation.
  • 213 works are complete, typically 14.8 months after recommendation. 202 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 71 vendors. The largest received 5.9%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 92/100: finishing works counts most

  1. Works completed 30%96Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%77Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%74Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Rithu M V, 5.9% of payments across 71 vendors.

District sanction speed

53/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%53Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

221 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Thayyil Meethal Korattemmal Road (SC), Ward - 3, Atholi GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #167827

    ₹6.6 L Completed 14 Oct 2026Rec. 5 Oct 2023Paid ₹6.6 L
  • Construction of Thevarkandi Stadium Road (SC), Ward - 15, Kottur GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #131244

    ₹12.6 L Completed 24 Sept 2026Rec. 16 Mar 2024Paid ₹12.6 L
  • Library Books for Deshiya Vayanashala and Grandhalayam, Kuttambur, Ward - 6, Kakkur GP

    Education & librariesPurchase Books for Library· Kozhikode· #167838

    ₹50,000 Completed 21 Sept 2026Rec. 31 Oct 2023Paid ₹50,000
  • Library Books for Aikya Kerala Reading Room and Library, Chakkorathukulam, Kozhikode 673011 (Ph 9496355366), Ward 65, Kozhikode Corporation

    Education & librariesPurchase Books for Library· Kozhikode· #167837

    ₹49,990 Completed 14 Sept 2026Rec. 31 Oct 2023Paid ₹49,990
  • Mini Mast Light (4x100W) at Thuvathuthazham Angadi, Ward-2, Madavoor GP

    Electricity & lightingLighting of public spaces· Kozhikode· #115777

    ₹1.4 L Completed 18 Mar 2026Rec. 28 Feb 2024Paid ₹1.4 L
  • Mini Mast Light (4x100W) at Vattikkunnampoyil in Thachampoyil Erpona Road, Ward-16, Thamarassery GP

    Electricity & lightingLighting of public spaces· Kozhikode· #115778

    ₹1.4 L Completed 18 Mar 2026Rec. 28 Feb 2024Paid ₹1.4 L
  • Mini Mast Light (4x100W) at Velimanna Angadi, Ward-14, Omassery GP

    Electricity & lightingLighting of public spaces· Kozhikode· #115773

    ₹1.4 L Completed 16 Mar 2026Rec. 28 Feb 2024Paid ₹1.4 L
  • Drinking Water Project at Kalangali Nalucent Colony (SC), Ward-2, Koorachundu Grama Panchayath

    Drinking waterInstalling community drinking water plants· Kozhikode· #167622

    ₹6.6 L Completed 7 Mar 2026Rec. 30 Sep 2022Paid ₹6.6 L
  • Completion of Oyalamala SC Colony Drinking Water Project, Ward-19, Ulliyeri Grama Panchayath

    Drinking waterInstalling community drinking water plants· Kozhikode· #167613

    ₹7.9 L Completed 5 Mar 2026Rec. 25 Oct 2022Paid ₹7.9 L
  • Construction of Othayoth Parambil Meethal Puthiyottumkandi Colony Road (ST), Ward - 10, Nanminda GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #167823

    ₹18.0 L Completed 14 Jan 2026Rec. 3 Oct 2023Paid ₹18.0 L
  • Construction of Illath Para Kunnoth Kandi Road, Ward-16, Atholi Grama Panchayath

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #167672

    ₹3.8 L Completed 18 Dec 2025Rec. 6 Jan 2023Paid ₹3.8 L
  • Construction of Kacheri to Chirayilthazham Road, Ward - 16, Thalakulathur GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #167968

    ₹3.5 L Completed 24 Oct 2025Rec. 30 Nov 2023Paid ₹3.5 L
  • Repair and Maintenance of Chathankavu Puttatt Road, Ward - 14, Kunnamangalam GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #167963

    ₹3.8 L Completed 23 Oct 2025Rec. 21 Feb 2024Paid ₹3.8 L
  • Mini Mast Light (400) at Kashayappadi, Division - 22, Feroke Minicipality

    Electricity & lightingLighting of public spaces· Kozhikode· #131042

    ₹1.3 L Completed 15 Oct 2025Rec. 16 Mar 2024Paid ₹1.3 L
  • Mini Mast Light (400 W) at Keeranpadi, Division - 34, Feroke Municipality

    Electricity & lightingLighting of public spaces· Kozhikode· #131037

    ₹1.3 L Completed 8 Oct 2025Rec. 16 Mar 2024Paid ₹1.3 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.