1st of 20 from Kerala
Allocated limit
₹9.77 Cr
Median ₹8.60 Cr
Fund utilisation
84%
₹8.19 Cr recommended · 179 works
Below median (98%)
Paid to vendors
₹8.19 Cr
84% of allocation
About the median
Works completed
179
100% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP179 works
₹8.19 Cr · 84% of the ₹9.77 Cr allocated
- Sanctioned by the district179 works
100% sanctioned · took 14.9 months on average (due within 45 days)
- Completed179 works
₹8.19 Cr final cost · 19.2 months from recommendation on average
In plain words
What the numbers say
- Recommended 179 works worth ₹8.19 Cr, a fund utilisation of 84%, higher than 8.2% of 17th Lok Sabha MPs.
- The district has sanctioned 179 of them, taking 14.9 months on average.
- ₹8.19 Cr has been paid to vendors, 84% of the allocation.
- 179 works are complete, typically 19.2 months after recommendation. 162 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 106 vendors. The largest received 11%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 95/100: finishing works counts most
- Works completed 30%100Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%84Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%91Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%84Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Mahindra Ltd, 11% of payments across 106 vendors.
District sanction speed
50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
179 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Installation of Mini Mast Light near Panakkad Thangalpadi Bus stop. Ward 37, Malappuram Municipality
Electricity & lightingLighting of public spaces· Malappuram· #130066
₹2.0 L Completed 24 Sept 2026Rec. 15 Mar 2024Paid ₹2.0 LAryampadam Colony Minimast Light Ward 2 , Manjeri Municipality
Electricity & lightingLighting of public spaces· Malappuram· #130242
₹2.1 L Completed 13 Aug 2026Rec. 16 Mar 2024Paid ₹2.1 LConstruction of Kidangazhi Cherattupadam Road Ward 1, Manjeri Municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130280
₹4.8 L Completed 13 Aug 2026Rec. 16 Mar 2024Paid ₹4.8 LAryampadam Colony footpath Ward 2 (SC) Manjeri Municipality
Roads & bridgesConstruction of footpaths and pedestrian ways· Malappuram· #247427
₹2.0 L Completed 13 Aug 2026Rec. 12 Jun 2023Paid ₹2.0 LConstruction of Pottayil Kolathodu Road Ward 16, Thenhippalam GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130246
₹4.3 L Completed 10 Aug 2026Rec. 16 Mar 2024Paid ₹4.3 LConstruction of Mini pathway Ward 3, Mooniyur GP
Roads & bridgesConstruction of footpaths and pedestrian ways· Malappuram· #131382
₹5.2 L Completed 10 Aug 2026Rec. 16 Mar 2024Paid ₹5.2 LConstruction of Parappinkunnu Irumbkulam Road Concrete Ward 12, Thrikkalangode GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130235
₹2.3 L Completed 7 Aug 2026Rec. 16 Mar 2024Paid ₹2.3 LConstruction of Ossankandi - Kollodathil aru Road, Ward 9, Peruvallur GP(Second phase)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130250
₹4.3 L Completed 7 Aug 2026Rec. 16 Mar 2024Paid ₹4.3 LConstruction of Chambram Palyaalil Sarppakkaavu Road Mill Idavazhi Road -Interlock and drainage works Ward 17, Aliparamba GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130228
₹9.8 L Completed 6 Aug 2026Rec. 16 Mar 2024Paid ₹9.8 LConstruction of Kaaraayapaara Malorungal Kund Road Ward 19, Pandikkad GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130232
₹3.0 L Completed 6 Aug 2026Rec. 16 Mar 2024Paid ₹3.0 LCherupalli Chembaala Road Concrete Ward 4, Thrikkalangode GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130236
₹2.3 L Completed 6 Aug 2026Rec. 16 Mar 2024Paid ₹2.3 LConcreting of Poolakunnu-Cheerakkuzhi Road , Ward 19, Thrikkalangode GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #189078
₹2.3 L Completed 6 Aug 2026Rec. 12 Jun 2023Paid ₹2.3 LKandamchina Smashanam Road (SC) Ward 18 Aliparamb GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #247422
₹2.5 L Completed 6 Aug 2026Rec. 12 Jun 2023Paid ₹2.5 LConstruction of Michabhoomi Road Ward 7, Perinthalmanna Municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130278
₹3.0 L Completed 31 Jul 2026Rec. 16 Mar 2024Paid ₹3.0 LConstruction of Puthanpalli Pulikkal Road Ward 10 , Melattur GP
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #130130
₹1.5 L Completed 30 Jul 2026Rec. 15 Mar 2024Paid ₹1.5 L
17th Lok Sabha MPs from Kerala
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | M P Abdussamad Samadani · Malappuram | 84% | 84% | 179 | 95 |
| 2 | T N Prathapan · Thrissur | 100% | 95% | 90 | 94 |
| 3 | E T Mohammed Basheer · Ponnani | 84% | 83% | 117 | 94 |
| 4 | Rahul Gandhi · Wayanad | 90% | 90% | 71 | 93 |
| 5 | Shri M K Raghavan · Kozhikode | 77% | 74% | 213 | 92 |
| 6 | Shri Rajmohan Unnithan · Kasaragod | 98% | 97% | 283 | 92 |
| 7 | Dr Shashi Tharoor · Thiruvananthapuram | 91% | 84% | 150 | 92 |
| 8 | Adv Adoor Prakash · Attingal | 100% | 97% | 290 | 92 |
| 9 | Anto Antony · Pathanamthitta | 99% | 88% | 154 | 90 |
| 10 | Adv Dean Kuriakose · Idukki | 90% | 82% | 147 | 90 |
| 11 | Smt Ramya Haridas · Alathur | 100% | 100% | 418 | 90 |
| 12 | Vellalath Kochukrishnan Nair Sreekandan · Palakkad | 100% | 83% | 145 | 90 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.