6th of 20 from Kerala
Payments concentrated with one vendor
59% of vendor payments went to M S Communication.
Allocated limit
₹11.49 Cr
Median ₹8.60 Cr
Fund utilisation
98%
₹11.27 Cr recommended · 286 works
About the median
Paid to vendors
₹11.20 Cr
97% of allocation
Above median (88%)
Works completed
283
99% of recommended
Above median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP286 works
₹11.27 Cr · 98% of the ₹11.49 Cr allocated
- Sanctioned by the district286 works
100% sanctioned · took 4.7 months on average (due within 45 days)
- Completed283 works
₹11.19 Cr final cost · 11.3 months from recommendation on average
In plain words
What the numbers say
- Recommended 286 works worth ₹11.27 Cr, a fund utilisation of 98%, higher than 50% of 17th Lok Sabha MPs.
- The district has sanctioned 286 of them, taking 4.7 months on average.
- ₹11.20 Cr has been paid to vendors, 97% of the allocation.
- 283 works are complete, typically 11.3 months after recommendation. 240 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 39 vendors. The largest received 59%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 92/100: finishing works counts most
- Works completed 30%99Completed ÷ recommended works.
- Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%85Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%97Paid to vendors ÷ allocated limit.
- Vendor diversity 10%51How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: M S Communication, 59% of payments across 39 vendors.
District sanction speed
85/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%85Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
286 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Formation of Road with Concrete at Kalikkal Sulthan Canal Road under SC Category in Ward 9 of Madayi Grama Panchayath
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #91887
₹8.2 L Completed 1 Sept 2026Rec. 30 Jan 2024Paid ₹8.2 LInstallation of Mini High Mast Light near to Muthukuda L.P School Transformer Ward -3
Electricity & lightingStreet lights· Kannur· #118601
₹3.0 L Sanctioned · 17 Aug 2026Rec. 1 Mar 2024Construction of Volley Ball Court cum Shuttle Court and Pavilion with Modern Sports Amenities (Turf or other feasible type construction) meant for SC Development at Ward 10 Kasargod Municipality
Sports & fitnessDevelopment of playfields and sports grounds· Kasaragod· #101647
₹34.4 L Completed 28 Mar 2026Rec. 9 Feb 2024Paid ₹34.4 LConstruction of a Funeral Building (Crematorium with requiredModern Amenties including Furnace, Shed, Compound Wall with Gate etc. at Pulayan Community Burial Ground at Thuruthi Village, Kadankod, Thuruthi PO,( Ward No-14) area of Cheruvathur Grama Panchayath in Kasaragod district.
Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Kasaragod· #118993
₹24.7 L Completed 28 Mar 2026Rec. 2 Mar 2024Paid ₹24.7 LInstallation of Mini High Mast Light at Beewi Road Junction Ward No 7
Electricity & lightingStreet lights· Kannur· #122213
₹3.0 L Completed 23 Mar 2026Rec. 6 Mar 2024Paid ₹3.0 LInstallation of Mini High Mast at Punathil Karikkadavu Olavara SC Colony
Electricity & lightingStreet lights· Kasaragod· #122250
₹3.0 L Completed 9 Mar 2026Rec. 6 Mar 2024Paid ₹3.0 LMettammel East Anganwadi- SC Smasanam Road Construction (Ward 18)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kasaragod· #120654
₹11.1 L Completed 7 Mar 2026Rec. 5 Mar 2024Paid ₹11.1 LSupply of One scooter with side wheel fittings (Tri Cycle) for an SC beneficiary in Muringottu Colony, Peralam Village, Waard 6, Kozhummal. P.O., Karivellur Peralam Grama Panchayath, Kannur distirict (Under SC category)
Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #122099
₹1.1 L Physical Inspection · 11 Feb 2026Rec. 6 Mar 2024Paid ₹1.1 LInstallation of Mini High Mast Light at Muthukuda Panavalappu Ward-32
Electricity & lightingStreet lights· Kannur· #118602
₹3.0 L Completed 3 Feb 2026Rec. 1 Mar 2024Paid ₹3.0 LInstallation of Mini High Mast Light in Vellikkeel Junction
Electricity & lightingStreet lights· Kannur· #118603
₹3.0 L Completed 3 Feb 2026Rec. 1 Mar 2024Paid ₹3.0 LFormation of Road with Concreting “ERIAM UNNAMURIKKU ROAD in Panappuzha Village ,Kadannappalli-Panappuzha Grama Panchayath in Taliparamba Block (1st Reach )
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #126902
₹8.1 L Completed 17 Jan 2026Rec. 12 Mar 2024Paid ₹8.1 LConstruction of a Community Hall Building and other facilities at Thannithodu Kaliyadukkam ST Colony in ward No.4 of Pullur Priya Grama Panchayath (in ST Category)
Community buildings & public spacesConstruction of community centers and community halls· Kasaragod· #66335
₹15.2 L Completed 6 Jan 2026Rec. 20 Dec 2023Paid ₹15.2 LInstallation of Mini High Mast at Nelliyadukkam Junction SC Colony
Electricity & lightingStreet lights· Kasaragod· #122253
₹3.0 L Completed 18 Dec 2025Rec. 6 Mar 2024Paid ₹3.0 LSupply of one Scooter with Side Wheel Fittings for a beneficiary at Mattool Central,Ward-03,
Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #122095
₹1.1 L Completed 10 Dec 2025Rec. 6 Mar 2024Paid ₹1.1 LInstallation of Mini High Mast at Padanna Vadakkepuram SC Colony
Electricity & lightingStreet lights· Kasaragod· #122252
₹3.0 L Completed 9 Dec 2025Rec. 6 Mar 2024Paid ₹3.0 L
17th Lok Sabha MPs from Kerala
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | M P Abdussamad Samadani · Malappuram | 84% | 84% | 179 | 95 |
| 2 | T N Prathapan · Thrissur | 100% | 95% | 90 | 94 |
| 3 | E T Mohammed Basheer · Ponnani | 84% | 83% | 117 | 94 |
| 4 | Rahul Gandhi · Wayanad | 90% | 90% | 71 | 93 |
| 5 | Shri M K Raghavan · Kozhikode | 77% | 74% | 213 | 92 |
| 6 | Shri Rajmohan Unnithan · Kasaragod | 98% | 97% | 283 | 92 |
| 7 | Dr Shashi Tharoor · Thiruvananthapuram | 91% | 84% | 150 | 92 |
| 8 | Adv Adoor Prakash · Attingal | 100% | 97% | 290 | 92 |
| 9 | Anto Antony · Pathanamthitta | 99% | 88% | 154 | 90 |
| 10 | Adv Dean Kuriakose · Idukki | 90% | 82% | 147 | 90 |
| 11 | Smt Ramya Haridas · Alathur | 100% | 100% | 418 | 90 |
| 12 | Vellalath Kochukrishnan Nair Sreekandan · Palakkad | 100% | 83% | 145 | 90 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.