Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Rajmohan Unnithan

Lok SabhaKasaragod · Kerala

MP score92/100119th of 539 in the 17th Lok Sabha
6th of 20 from Kerala
Re-elected to the 18th Lok Sabha Then: 75% utilisation, 66 works completed, score 49.
  • Payments concentrated with one vendor

    59% of vendor payments went to M S Communication.

Allocated limit

₹11.49 Cr

Median ₹8.60 Cr

Fund utilisation

98%

₹11.27 Cr recommended · 286 works
About the median

Paid to vendors

₹11.20 Cr

97% of allocation
Above median (88%)

Works completed

283

99% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP286 works

    ₹11.27 Cr · 98% of the ₹11.49 Cr allocated

  2. Sanctioned by the district286 works

    100% sanctioned · took 4.7 months on average (due within 45 days)

  3. Completed283 works

    ₹11.19 Cr final cost · 11.3 months from recommendation on average

In plain words

What the numbers say

  • Recommended 286 works worth ₹11.27 Cr, a fund utilisation of 98%, higher than 50% of 17th Lok Sabha MPs.
  • The district has sanctioned 286 of them, taking 4.7 months on average.
  • ₹11.20 Cr has been paid to vendors, 97% of the allocation.
  • 283 works are complete, typically 11.3 months after recommendation. 240 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 39 vendors. The largest received 59%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 92/100: finishing works counts most

  1. Works completed 30%99Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%98Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%85Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%97Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    51
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: M S Communication, 59% of payments across 39 vendors.

District sanction speed

85/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%85Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

286 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Formation of Road with Concrete at Kalikkal Sulthan Canal Road under SC Category in Ward 9 of Madayi Grama Panchayath

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #91887

    ₹8.2 L Completed 1 Sept 2026Rec. 30 Jan 2024Paid ₹8.2 L
  • Installation of Mini High Mast Light near to Muthukuda L.P School Transformer Ward -3

    Electricity & lightingStreet lights· Kannur· #118601

    ₹3.0 L Sanctioned · 17 Aug 2026Rec. 1 Mar 2024
  • Construction of Volley Ball Court cum Shuttle Court and Pavilion with Modern Sports Amenities (Turf or other feasible type construction) meant for SC Development at Ward 10 Kasargod Municipality

    Sports & fitnessDevelopment of playfields and sports grounds· Kasaragod· #101647

    ₹34.4 L Completed 28 Mar 2026Rec. 9 Feb 2024Paid ₹34.4 L
  • Construction of a Funeral Building (Crematorium with requiredModern Amenties including Furnace, Shed, Compound Wall with Gate etc. at Pulayan Community Burial Ground at Thuruthi Village, Kadankod, Thuruthi PO,( Ward No-14) area of Cheruvathur Grama Panchayath in Kasaragod district.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Kasaragod· #118993

    ₹24.7 L Completed 28 Mar 2026Rec. 2 Mar 2024Paid ₹24.7 L
  • Installation of Mini High Mast Light at Beewi Road Junction Ward No 7

    Electricity & lightingStreet lights· Kannur· #122213

    ₹3.0 L Completed 23 Mar 2026Rec. 6 Mar 2024Paid ₹3.0 L
  • Installation of Mini High Mast at Punathil Karikkadavu Olavara SC Colony

    Electricity & lightingStreet lights· Kasaragod· #122250

    ₹3.0 L Completed 9 Mar 2026Rec. 6 Mar 2024Paid ₹3.0 L
  • Mettammel East Anganwadi- SC Smasanam Road Construction (Ward 18)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kasaragod· #120654

    ₹11.1 L Completed 7 Mar 2026Rec. 5 Mar 2024Paid ₹11.1 L
  • Supply of One scooter with side wheel fittings (Tri Cycle) for an SC beneficiary in Muringottu Colony, Peralam Village, Waard 6, Kozhummal. P.O., Karivellur Peralam Grama Panchayath, Kannur distirict (Under SC category)

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #122099

    ₹1.1 L Physical Inspection · 11 Feb 2026Rec. 6 Mar 2024Paid ₹1.1 L
  • Installation of Mini High Mast Light at Muthukuda Panavalappu Ward-32

    Electricity & lightingStreet lights· Kannur· #118602

    ₹3.0 L Completed 3 Feb 2026Rec. 1 Mar 2024Paid ₹3.0 L
  • Installation of Mini High Mast Light in Vellikkeel Junction

    Electricity & lightingStreet lights· Kannur· #118603

    ₹3.0 L Completed 3 Feb 2026Rec. 1 Mar 2024Paid ₹3.0 L
  • Formation of Road with Concreting “ERIAM UNNAMURIKKU ROAD in Panappuzha Village ,Kadannappalli-Panappuzha Grama Panchayath in Taliparamba Block (1st Reach )

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #126902

    ₹8.1 L Completed 17 Jan 2026Rec. 12 Mar 2024Paid ₹8.1 L
  • Construction of a Community Hall Building and other facilities at Thannithodu Kaliyadukkam ST Colony in ward No.4 of Pullur Priya Grama Panchayath (in ST Category)

    Community buildings & public spacesConstruction of community centers and community halls· Kasaragod· #66335

    ₹15.2 L Completed 6 Jan 2026Rec. 20 Dec 2023Paid ₹15.2 L
  • Installation of Mini High Mast at Nelliyadukkam Junction SC Colony

    Electricity & lightingStreet lights· Kasaragod· #122253

    ₹3.0 L Completed 18 Dec 2025Rec. 6 Mar 2024Paid ₹3.0 L
  • Supply of one Scooter with Side Wheel Fittings for a beneficiary at Mattool Central,Ward-03,

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #122095

    ₹1.1 L Completed 10 Dec 2025Rec. 6 Mar 2024Paid ₹1.1 L
  • Installation of Mini High Mast at Padanna Vadakkepuram SC Colony

    Electricity & lightingStreet lights· Kasaragod· #122252

    ₹3.0 L Completed 9 Dec 2025Rec. 6 Mar 2024Paid ₹3.0 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.