Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

T N Prathapan

Lok SabhaThrissur · Kerala

MP score94/10083rd of 539 in the 17th Lok Sabha
2nd of 20 from Kerala

Allocated limit

₹8.03 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹8.03 Cr recommended · 91 works
About the median

Paid to vendors

₹7.65 Cr

95% of allocation
Above median (88%)

Works completed

90

99% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP91 works

    ₹8.03 Cr · 100% of the ₹8.03 Cr allocated

  2. Sanctioned by the district91 works

    100% sanctioned · took 6.5 months on average (due within 45 days)

  3. Completed90 works

    ₹7.38 Cr final cost · 11.1 months from recommendation on average

In plain words

What the numbers say

  • Recommended 91 works worth ₹8.03 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 91 of them, taking 6.5 months on average.
  • ₹7.65 Cr has been paid to vendors, 95% of the allocation.
  • 90 works are complete, typically 11.1 months after recommendation. 70 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 34 vendors. The largest received 30%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 94/100: finishing works counts most

  1. Works completed 30%99Completed ÷ recommended works.
  2. Spending efficiency 20%96Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%78Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%95Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    88
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: NIRMITHI KENDRA THRISSUR, 30% of payments across 34 vendors.

District sanction speed

76/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%76Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

91 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Smart Angan wadi Building for Anganwadi No 66 in Ward 13 ,Anthikad Gramapanchayat

    Education & librariesConstruction of buildings for crèches and anganwadies· Thrissur· #116989

    ₹32.6 L Completed 23 Jul 2026Rec. 28 Feb 2024Paid ₹32.6 L
  • Construction of Smart Angan wadi Building for Anganwadi No 40 Peechampillykonam in Ward 5 , Irinjalakuda Municipality

    Education & librariesConstruction of buildings for crèches and anganwadies· Thrissur· #117875

    ₹17.1 L Completed 10 Mar 2026Rec. 29 Feb 2024Paid ₹17.1 L
  • Areekkapara Colony Model Road Construction with drainage Division 55 Thrissur Corporation SC Work

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #118545

    ₹7.7 L Completed 3 Mar 2026Rec. 1 Mar 2024Paid ₹7.7 L
  • Laloor Bakar colony Model Road Construction with drainage Division 54 Thrissur Corporation SC Work

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #118548

    ₹14.6 L Completed 2 Mar 2026Rec. 1 Mar 2024Paid ₹14.6 L
  • Construction of Smart Anganwadi Building for Anganwadi No. 46 in Ward 14, Thalikkulam Grama Panchayat

    Education & librariesConstruction of buildings for crèches and anganwadies· Thrissur· #117737

    ₹27.7 L Completed 21 Feb 2026Rec. 29 Feb 2024Paid ₹27.7 L
  • High Mast Light at Sakthan Vegetable Market Division 35 , Thrissur Corporation

    Electricity & lightingLighting of public spaces· Thrissur· #132288

    ₹3.6 L Completed 20 Feb 2026Rec. 16 Mar 2024Paid ₹3.6 L
  • Anganwadi Building for Anganwadi No. 110 in Arimpur Gramapanchayat Ward No. 16

    Education & librariesConstruction of buildings for crèches and anganwadies· Thrissur· #131900

    ₹21.6 L Completed 19 Jan 2026Rec. 16 Mar 2024Paid ₹21.6 L
  • Construction of Road “ Karor Water Tank Colony Road. (SC Fund) Ward 12 Aloor Gramapanchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #118596

    ₹2.4 L Completed 15 Nov 2025Rec. 1 Mar 2024Paid ₹2.4 L
  • Construction of Dr. Ambedkar Road Concrete and CC Drain to Indira SC Colony W 10 Manalur Gramapanchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #117874

    ₹54.2 L Completed 14 Nov 2025Rec. 29 Feb 2024Paid ₹54.2 L
  • Mini mast Light of 8 meter Height with 6 lights at Pallimukku opposite Thalikulam Juma Masjid Ward 9

    Electricity & lightingLighting of public spaces· Thrissur· #126617

    ₹1.6 L Completed 5 Nov 2025Rec. 12 Mar 2024Paid ₹1.6 L
  • Construction of Road and Drainage in Peechampilly SC Colony in Ward 9 in Alagapanagar Gramapanchayat (SC fund)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #118816

    ₹4.2 L Completed 4 Nov 2025Rec. 2 Mar 2024Paid ₹4.2 L
  • Construction of Mannampetta Ambedkar SC Colony Road drainange and side concreting work in ward 5 Alagapanagar Grampanchayat

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #116976

    ₹5.6 L Completed 31 Oct 2025Rec. 28 Feb 2024Paid ₹5.6 L
  • CONSTRUCTION OF SC WOMEN INDUSTRIAL TRAINING CENTRE & CULTURAL CENTRE IN WARD 13 CHAZHOOR GRAMAPANCHAYAT

    Community buildings & public spacesConstruction of buildings for training institutions· Thrissur· #116565

    ₹31.1 L Completed 21 Aug 2025Rec. 28 Feb 2024Paid ₹31.1 L
  • Construction of Building for Family Welfare Centre in Ayyanthole Zone Division 55

    HealthConstruction of rooms and facilities for hospitals, FWC , PHC Centers and ANM centers· Thrissur· #117731

    ₹29.1 L Completed 30 Jul 2025Rec. 29 Feb 2024Paid ₹29.1 L
  • Minmast Light at Aryambadam Chakyarkadavu Junction Ward 1 Paralam Gramapanchayat

    Electricity & lightingLighting of public spaces· Thrissur· #131682

    ₹1.7 L Completed 28 Jul 2025Rec. 16 Mar 2024Paid ₹1.7 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.