Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Smt Ramya Haridas

Lok SabhaSC seatAlathur · Kerala

MP score90/100154th of 539 in the 17th Lok Sabha
11th of 20 from Kerala

Allocated limit

₹8.61 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹8.61 Cr recommended · 419 works
About the median

Paid to vendors

₹8.59 Cr

100% of allocation
Above median (88%)

Works completed

418

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP419 works

    ₹8.61 Cr · 100% of the ₹8.61 Cr allocated

  2. Sanctioned by the district419 works

    100% sanctioned · took 8.8 months on average (due within 45 days)

  3. Completed418 works

    ₹8.59 Cr final cost · 12.7 months from recommendation on average

In plain words

What the numbers say

  • Recommended 419 works worth ₹8.61 Cr, a fund utilisation of 100%, higher than 81% of 17th Lok Sabha MPs.
  • The district has sanctioned 419 of them, taking 8.8 months on average.
  • ₹8.59 Cr has been paid to vendors, 100% of the allocation.
  • 418 works are complete, typically 12.7 months after recommendation. 243 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 10 vendors. The largest received 48%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 90/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%58Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%100Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    65
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Kerala Electrical And Allied Engineering Company, 48% of payments across 10 vendors.

District sanction speed

65/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%65Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

419 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Bus Waiting Shed (07-006) Kavasserry Grama Panchayat Nelliyamkunnam Centre, Kavassery Gramapanchayat – Ward – 10.

    Community buildings & public spacesConstruction of bus-sheds or bus-stops· Palakkad· #128507

    ₹3.0 L Completed 19 Sept 2026Rec. 14 Mar 2024Paid ₹3.0 L
  • 8 Mtr. Mini Mast Light. 150W x 4 Nos. (03-001) Valiyamallankolamb area, Ward – 03, Muthalamada Grama Panchayat

    Electricity & lightingLighting of public spaces· Palakkad· #127215

    ₹1.6 L Completed 27 Jul 2026Rec. 13 Mar 2024Paid ₹1.6 L
  • Setting up of 8 meter mini mast light at Pazhunnana Juma Masjid Area Ward 13 at Chowannur Gramapanchayat

    Electricity & lightingLighting of public spaces· Thrissur· #238491

    ₹1.6 L Completed 13 Nov 2025Rec. 1 Jun 2023Paid ₹1.6 L
  • 8 Mtr. Mini Mast Light 150W x 4 Nos. (03-001) Nadappani Centre, Ward-5, Eruthempathy Grama Panchayat

    Electricity & lightingLighting of public spaces· Palakkad· #126751

    ₹1.7 L Completed 6 Nov 2025Rec. 12 Mar 2024Paid ₹1.7 L
  • 8 Mtr. Mini Mast Light 150W x 4 Nos. (03-001) Near Karumanda Koundannur Mariyamman Kovil, Ward-6 Eruthempathy Grama Panchayat

    Electricity & lightingLighting of public spaces· Palakkad· #126765

    ₹1.7 L Completed 6 Nov 2025Rec. 12 Mar 2024Paid ₹1.7 L
  • 8 Mtr. Mini Mast Light 150W x 4 Nos. (03-001) Vannamada Nataraja Koundar Area, Ward-10, Eruthempathy Grama Panchayat

    Electricity & lightingLighting of public spaces· Palakkad· #126768

    ₹1.7 L Completed 6 Nov 2025Rec. 12 Mar 2024Paid ₹1.7 L
  • 8 Mtr. Mini Mast Light 150W x 4 Nos.(03-001) Near Herbart Bridge Ward-12, Eruthempathy Grama Panchayat.

    Electricity & lightingLighting of public spaces· Palakkad· #126771

    ₹1.7 L Completed 6 Nov 2025Rec. 12 Mar 2024Paid ₹1.7 L
  • 8 Mtr. Mini Mast Light. 150W x 4 Nos. (03-001) Ezhuthankadu Junction, Ward-9, Alathur Grama Panchayat.

    Electricity & lightingLighting of public spaces· Palakkad· #126510

    ₹1.7 L Completed 1 Nov 2025Rec. 12 Mar 2024Paid ₹1.7 L
  • 8 Mtr. Mini Mast Light 150W x 4 Nos. (03-001) Karod S C Colony – Ward – 10,Melarcode Grama Panchayat

    Electricity & lightingLighting of public spaces· Palakkad· #127894

    ₹1.8 L Completed 25 Oct 2025Rec. 14 Mar 2024Paid ₹1.8 L
  • 8 Mtr. Mini Mast Light 150W*4 Nos. (03-001) Karimpara Junction Ward 10 Ayalur Gramapanchayath

    Electricity & lightingLighting of public spaces· Palakkad· #130950

    ₹1.7 L Completed 25 Oct 2025Rec. 16 Mar 2024Paid ₹1.7 L
  • 8 Mtr Mini Mast Light (150 W*4 Nos) at Pookkulangara SC Colony Ward -15, Chelakkara Grama Panchayat

    Electricity & lightingLighting of public spaces· Thrissur· #131672

    ₹1.8 L Completed 18 Sept 2025Rec. 16 Mar 2024Paid ₹1.8 L
  • 8 Mtr Mini Mast Light (150 W*4 Nos) at Thekkinkadu Colony Ward -7, Kondazhi Grama Panchayath

    Electricity & lightingLighting of public spaces· Thrissur· #129370

    ₹1.8 L Completed 15 Sept 2025Rec. 15 Mar 2024Paid ₹1.8 L
  • 8 Mtr Mini Mast Light (150 W*4 Nos) at Navodaya Kalathpadi Junction Ward -14, Kondazhi Grama Panchayath

    Electricity & lightingLighting of public spaces· Thrissur· #129371

    ₹1.8 L Completed 15 Sept 2025Rec. 15 Mar 2024Paid ₹1.8 L
  • 8 Mtr Mini Mast Light (150 W*4 Nos) at Indhira Sthoopam Area Ward -15, Kondazhi Grama Panchayath

    Electricity & lightingLighting of public spaces· Thrissur· #129375

    ₹1.8 L Completed 9 Sept 2025Rec. 15 Mar 2024Paid ₹1.8 L
  • 8 Mtr Mini Mast Light (150 W*4 Nos) at Athani Nagar Ward -15, Kondazhi Grama Panchayath

    Electricity & lightingLighting of public spaces· Thrissur· #129379

    ₹1.8 L Completed 9 Sept 2025Rec. 15 Mar 2024Paid ₹1.8 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.