Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Shri M K Raghavan

Lok SabhaINCKozhikode · Kerala

MP score52/100332nd of 542 in the 18th Lok Sabha
18th of 20 from Kerala
Also an MP in the 17th Lok Sabha Then: 77% utilisation, 213 works completed, score 92.
  • Recommended, but little spent

    83% of funds recommended, but only 8.2% paid out to vendors.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

83%

₹12.27 Cr recommended · 329 works
Above median (76%)

Paid to vendors

₹1.21 Cr

8.2% of allocation
Below median (37%)

Works completed

20

6.1% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP329 works

    ₹12.27 Cr · 83% of the ₹14.70 Cr allocated

  2. Sanctioned by the district193 works

    59% sanctioned · took 12.3 months on average (due within 45 days)

  3. Completed20 works

    ₹71.2 L final cost · 15.8 months from recommendation on average

136 works are still awaiting sanction, 103 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 329 works worth ₹12.27 Cr, a fund utilisation of 83%, higher than 63% of 18th Lok Sabha MPs.
  • The district has sanctioned 193 of them, taking 12.3 months on average.
  • ₹1.21 Cr has been paid to vendors, 8.2% of the allocation.
  • 20 works are complete, typically 15.8 months after recommendation. 20 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 19 vendors. The largest received 17%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 52/100: finishing works counts most

  1. Works completed 30%6Completed ÷ recommended works.
  2. Spending efficiency 20%59Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%83Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%8Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Anvar Sadique PC, 17% of payments across 19 vendors.

District sanction speed

34/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%34Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

329 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Edakkandi Muyyayithazham Paramb Footpath

    Roads & bridgesConstruction of footpaths and pedestrian ways· Kozhikode· #180573

    ₹4.0 L Sanctioned · 31 Oct 2026Rec. 20 Mar 2025
  • Construction of Kappummal Cheriyaputhalath Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #186435

    ₹4.0 L Sanctioned · 31 Oct 2026Rec. 25 Mar 2025
  • Construction of Anjolimukk Cheruvath Thazhe Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325116

    ₹6.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Naduvilatt Nerambatt Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325117

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Mini Mast Light (5x150W) at Puthiyappuram

    Electricity & lightingLighting of public spaces· Kozhikode· #325118

    ₹2.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Puliyunnukandi Mukk Moonnambila Canal Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325119

    ₹6.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Vayappathangil Chamakala Thazha Pally Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325120

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Ayothkuni Kannorathazhe Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325121

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Kinarullathil Thattumpurath Thanikuzhi Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325122

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Mini Mast Light (5x150W) at Kunnakkodi Town Junction

    Electricity & lightingLighting of public spaces· Kozhikode· #325123

    ₹2.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Nadukkandithazhe Pattarkandithazhe Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325129

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Repair & Maintenance of Kurisupalli onjil Mulavattam kadavu Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325131

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Repair & Maintenance of Erappamthodu Methiyadippara Ponnundamala Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325133

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Kaithakolli Arakkal Thazhe Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325134

    ₹4.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Construction of Karoli Muthuvana Meethal Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kozhikode· #325136

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026

18th Lok Sabha MPs from Kerala

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Adv Dean Kuriakose · Idukki95%42%10273
2Vellalath Kochukrishnan Nair Sreekandan · Palakkad92%32%12371
3Dr Shashi Tharoor · Thiruvananthapuram68%30%5467
4Adv K Francis George · Kottayam98%23%8965
5K Radhakrishnan · Alathur98%21%3062
6Shri NK Premachandran · Kollam77%42%7862
7Shri Hibi Eden · Ernakulam92%19%2961
8Shri Kumbakudi Sudhakaran · Kannur80%19%8161
9Shri Suresh Kodikunnil · Mavelikkara78%26%7060
10K. C Venugopal · Alappuzha64%37%4558
11Shri Benny Behanan · Chalakudy80%20%3658
12Dr. M.P Abdussamad Samadani · Ponnani97%16%6257

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.