MPLADS report card · 17th Lok Sabha

Rahul Gandhi

Lok SabhaWayanad · Kerala

MP score93/10096th of 539 in the 17th Lok Sabha
4th of 20 from Kerala

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

90%

₹8.79 Cr recommended · 71 works
Below median (98%)

Paid to vendors

₹8.79 Cr

90% of allocation
About the median

Works completed

71

100% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP71 works

    ₹8.79 Cr · 90% of the ₹9.81 Cr allocated

  2. Sanctioned by the district71 works

    100% sanctioned · took 7.0 months on average (due within 45 days)

  3. Completed71 works

    ₹8.79 Cr final cost · 15.0 months from recommendation on average

In plain words

What the numbers say

  • Recommended 71 works worth ₹8.79 Cr, a fund utilisation of 90%, higher than 17% of 17th Lok Sabha MPs.
  • The district has sanctioned 71 of them, taking 7.0 months on average.
  • ₹8.79 Cr has been paid to vendors, 90% of the allocation.
  • 71 works are complete, typically 15.0 months after recommendation. 52 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 83 vendors. The largest received 16%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 93/100: finishing works counts most

  1. Works completed 30%100Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%90Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%73Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%90Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MAHINDRA AND MAHINDRA LIMITED, 16% of payments across 83 vendors.

District sanction speed

74/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%74Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

71 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of building for Community Based Disability Management Centre(CDMC) Kodenchery.

    HealthConstruction of rooms and facilities for hospitals, FWC , PHC Centers and ANM centers· Kozhikode· #86528

    ₹49.6 L Completed 13 Oct 2026Rec. 22 Jan 2024Paid ₹49.6 L
  • Construction of Library Building for GHSS Kizhuparamba , Kizhuparamba GP.

    Education & librariesConstruction of rooms and halls in school and colleges· Malappuram· #86722

    ₹17.1 L Completed 6 Oct 2026Rec. 22 Jan 2024Paid ₹17.1 L
  • Construction of railway Platform shelter at Thuvoor Railway Station

    Community buildings & public spacesConstruction of platforms and passenger sheds at railway stations· Malappuram· #98215

    ₹27.8 L Completed 30 Sept 2026Rec. 6 Feb 2024Paid ₹27.8 L
  • Construction of footpath Pengattukuzhi SC Colony,13th ward,Areekode GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Malappuram· #86686

    ₹4.2 L Completed 7 Sept 2026Rec. 22 Jan 2024Paid ₹4.2 L
  • Purchase of Four wheeler Vehicle for Mobile Dispensary FHC Pakkam

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Wayanad· #131272

    ₹9.1 L Completed 17 Aug 2026Rec. 16 Mar 2024Paid ₹9.1 L
  • Purchase of Four wheeler Vehicle for Mobile Dispensary FHC Appappara

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Wayanad· #131289

    ₹9.1 L Completed 17 Aug 2026Rec. 16 Mar 2024Paid ₹9.1 L
  • Drinking Water Project at Neervaram Mylukunnu ST Colony.

    Drinking waterInstalling community drinking water plants· Wayanad· #128520

    ₹19.9 L Completed 11 Aug 2026Rec. 14 Mar 2024Paid ₹19.9 L
  • Purchase of School Bus for GMUP School,Kizhisseri, Kuzhimanna GP

    Education & librariesPurchase of vans and buses for educational institutions· Malappuram· #129285

    ₹22.9 L Completed 11 Aug 2026Rec. 15 Mar 2024Paid ₹22.9 L
  • Drinking Water Project at Ealiyakkode SC Colony ,Ward 16,Thiruvali GP

    Drinking waterInstalling community drinking water plants· Malappuram· #131426

    ₹6.2 L Completed 7 Aug 2026Rec. 16 Mar 2024Paid ₹6.2 L
  • Establishing Physiotherapy Unit at Family Health Center,Edakkara,Edakkara GP

    HealthPurchase of hospital equipment· Malappuram· #131367

    ₹24.2 L Completed 5 Aug 2026Rec. 16 Mar 2024Paid ₹24.2 L
  • Construction of Building for Government Ayurveda Hospital Chokkad, Chokkad GP

    HealthConstruction of rooms and facilities for hospitals, FWC , PHC Centers and ANM centers· Malappuram· #86703

    ₹28.0 L Completed 15 May 2026Rec. 22 Jan 2024Paid ₹28.0 L
  • Purchase of four wheeler vehicle for Mobile dispensary at FHC Mampad, Mampad Grama Panchayath.

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Malappuram· #98226

    ₹9.0 L Completed 4 Mar 2026Rec. 6 Feb 2024Paid ₹9.0 L
  • Purchase of four wheeler vehicle for mobile dispensary at FHC Vazhikadavu, Vazhikadavu GP

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Malappuram· #86747

    ₹9.5 L Completed 24 Feb 2026Rec. 22 Jan 2024Paid ₹9.5 L
  • Purchase of four wheeler vehicle for mobile dispensary at CHC Kalikavu, Kalikavu GP

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Malappuram· #86751

    ₹9.4 L Completed 24 Feb 2026Rec. 22 Jan 2024Paid ₹9.4 L
  • Purchase of Ambulance to transport sick and injured animals in South Wayanad Forest Division.

    HealthPurchase of ambulance to transport sick and injured animals· Wayanad· #89070

    ₹15.0 L Completed 21 Feb 2026Rec. 25 Jan 2024Paid ₹15.0 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.