This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Adv Dean Kuriakose

Lok SabhaIdukki · Kerala

MP score90/100151st of 539 in the 17th Lok Sabha
10th of 20 from Kerala
Re-elected to the 18th Lok Sabha Then: 95% utilisation, 102 works completed, score 73.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

90%

₹8.79 Cr recommended · 154 works
Below median (98%)

Paid to vendors

₹8.08 Cr

82% of allocation
Below median (88%)

Works completed

147

95% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP154 works

    ₹8.79 Cr · 90% of the ₹9.81 Cr allocated

  2. Sanctioned by the district154 works

    100% sanctioned · took 15.8 months on average (due within 45 days)

  3. Completed147 works

    ₹7.13 Cr final cost · 18.8 months from recommendation on average

In plain words

What the numbers say

  • Recommended 154 works worth ₹8.79 Cr, a fund utilisation of 90%, higher than 17% of 17th Lok Sabha MPs.
  • The district has sanctioned 154 of them, taking 15.8 months on average.
  • ₹8.08 Cr has been paid to vendors, 82% of the allocation.
  • 147 works are complete, typically 18.8 months after recommendation. 119 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 77 vendors. The largest received 8.1%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 90/100: finishing works counts most

  1. Works completed 30%95Completed ÷ recommended works.
  2. Spending efficiency 20%88Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%90Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%81Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%82Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: P M YELDHOS, 8.1% of payments across 77 vendors.

District sanction speed

50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

154 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Purchasing Vehicle for Palliative Care Unit of PHC Pindimana Maruti Suzuki Eeco 5 Seat with AC Pindimana

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Ernakulam· #172918

    ₹7.8 L Completed 3 Sept 2026Rec. 4 Jan 2024Paid ₹7.8 L
  • Purchasing of Vehicle Maruthi Suzuki Eeco 5 Seat with AC for Palliative Care Unit Family Health Centre Avoly Avoly GP Muvattupuzha Block

    HealthPurchase of vehicle for mobile dispensaries (Four, three and two wheelers)· Ernakulam· #172987

    ₹6.3 L Completed 3 Sept 2026Rec. 24 May 2023Paid ₹6.3 L
  • Minimast Light 5 Meter 70 Watts LED Light at Ward 8 Kodikuthi Library Jn, Purapuzha GP, Thodupuzha Block

    Electricity & lightingLighting of public spaces· Idukki· #172724

    ₹1.2 L Completed 31 Mar 2026Rec. 5 Jul 2023Paid ₹1.2 L
  • Construction of Grama Kendhra at Vellayamkudy in Kattappana Municipality

    Community buildings & public spacesConstruction of buildings for community cultural activities· Idukki· #172675

    ₹5.0 L Completed 9 Mar 2026Rec. 27 Jan 2024Paid ₹5.0 L
  • Construction of Kitchen for St Jeroms LPS Vellayamkudy Kattappana Municipality

    Community buildings & public spacesSetting up of kitchen and pantries· Idukki· #172812

    ₹4.4 L Completed 9 Mar 2026Rec. 20 Feb 2024Paid ₹4.4 L
  • NA

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Idukki· #131729

    ₹23.1 L Completed 3 Mar 2026Rec. 16 Mar 2024Paid ₹23.1 L
  • Market

    Community buildings & public spacesConstruction of public staircase/ stair ghat for public convenience· Idukki· #131716

    ₹17.6 L Completed 23 Feb 2026Rec. 16 Mar 2024Paid ₹17.6 L
  • Construction of Building for Municipal Library Thodupuzha Municipality

    Education & librariesConstruction of public libraries and reading rooms· Idukki· #172804

    ₹22.0 L Completed 17 Feb 2026Rec. 16 Sep 2023Paid ₹22.0 L
  • Anappallam

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Idukki· #131651

    ₹5.3 L Completed 11 Feb 2026Rec. 16 Mar 2024Paid ₹5.3 L
  • Concreting of Santhigram 4 Cent colony road Erattayar GP Kattappana Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Idukki· #172759

    ₹8.0 L Completed 20 Jan 2026Rec. 4 Jul 2023Paid ₹8.0 L
  • Construction of Side protection wall for Kollam Pattada Holyday home Kurishumala road Kumily GP Azhutha Block Under SC Category

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Idukki· #172680

    ₹3.2 L Completed 31 Dec 2025Rec. 15 Mar 2024Paid ₹3.2 L
  • Concreting of Vellaramkunnu Anakkuzhy road Kumily GP Azhutha Block Under SC Category

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Idukki· #172694

    ₹8.2 L Completed 22 Dec 2025Rec. 19 Dec 2023Paid ₹8.2 L
  • Concreting of Marthoma Aadiayanipadom road edavatty GP, Thodupuzha Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Idukki· #172720

    ₹2.8 L Completed 11 Dec 2025Rec. 16 Apr 2023Paid ₹2.8 L
  • Completion works of Govt Homeo Dispensary Ward No 3 Varapetty GP Kothamangalam Block

    Community buildings & public spacesConstruction of community centers and community halls· Ernakulam· #173014

    ₹11.4 L Completed 1 Dec 2025Rec. 26 Feb 2024Paid ₹11.4 L
  • Construction and earthwork for chathamattom Pothancheeni Kadavoor Road Ward 04 Paingottor GP Kothamangalam Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #172865

    ₹15.4 L Completed 18 Nov 2025Rec. 9 Nov 2023Paid ₹15.4 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.