MPLADS report card · 17th Lok Sabha

Shri Kumbakudi Sudhakaran

Lok SabhaKannur · Kerala

MP score79/100364th of 539 in the 17th Lok Sabha
17th of 20 from Kerala
Re-elected to the 18th Lok Sabha Then: 80% utilisation, 81 works completed, score 61.

Allocated limit

₹9.81 Cr

Median ₹8.60 Cr

Fund utilisation

72%

₹7.07 Cr recommended · 138 works
Below median (98%)

Paid to vendors

₹6.05 Cr

62% of allocation
Below median (88%)

Works completed

113

82% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP138 works

    ₹7.07 Cr · 72% of the ₹9.81 Cr allocated

  2. Sanctioned by the district138 works

    100% sanctioned · took 12.8 months on average (due within 45 days)

  3. Completed113 works

    ₹5.96 Cr final cost · 17.4 months from recommendation on average

In plain words

What the numbers say

  • Recommended 138 works worth ₹7.07 Cr, a fund utilisation of 72%, higher than 3.5% of 17th Lok Sabha MPs.
  • The district has sanctioned 138 of them, taking 12.8 months on average.
  • ₹6.05 Cr has been paid to vendors, 62% of the allocation.
  • 113 works are complete, typically 17.4 months after recommendation. 74 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 21 vendors. The largest received 38%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 79/100: finishing works counts most

  1. Works completed 30%82Completed ÷ recommended works.
  2. Spending efficiency 20%99Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%72Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%65Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%62Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    78
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: P V ORGANICS FERTILIZERS, 38% of payments across 21 vendors.

District sanction speed

50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

138 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation Of High Mast Light at Kacheriparamb Junction Near Munderi Village Office( 8Meter Height-Double Drum Winching System-90.15.2.1 with 5*150-LED Flood Light)

    Electricity & lightingStreet lights· Kannur· #122155

    ₹3.0 L Completed 30 Oct 2026Rec. 6 Mar 2024Paid ₹3.0 L
  • Installation Of High Mast Light at Near Eachur Kottam Junction( 8Meter Height-Double Drum Winching System-90.15.2.1 with 5*150-LED Flood Light

    Electricity & lightingStreet lights· Kannur· #122156

    ₹3.0 L Completed 30 Oct 2026Rec. 6 Mar 2024Paid ₹3.0 L
  • Installation of Mini High Mast Light at Mundayamparamb Paniya Colony ( ST Work)

    Electricity & lightingLighting of public spaces· Kannur· #169790

    ₹3.0 L Sanctioned · 5 Oct 2026Rec. 5 Feb 2022
  • Installation of High Mast Lights at Thalap Sri Sundereswara Temple(12Meter Height-Double Drum Winching System-90.15.3.2 with 6*200-LED Flood Light

    Electricity & lightingStreet lights· Kannur· #127828

    ₹5.4 L Completed 23 Sept 2026Rec. 13 Mar 2024Paid ₹5.4 L
  • Installation of High Mast Lights at Ammu Paramb(12Meter Height-Double Drum Winching System-90.15.3.2 with 6*200-LED Flood Light

    Electricity & lightingStreet lights· Kannur· #127852

    ₹5.4 L Completed 23 Sept 2026Rec. 13 Mar 2024Paid ₹5.4 L
  • Installation of High Mast Lights at Near Aralam Farm Modern Residetial School(12 Meter Height-Double Drum Winching System-90.15.2.3 with 6*200-LED Flood Light(ST)

    Electricity & lightingStreet lights· Kannur· #124073

    ₹5.4 L Completed 14 Sept 2026Rec. 9 Mar 2024Paid ₹5.4 L
  • Installation of High Mast Lights at Mundakam SC COLONY -ATHIKKAL jAVAN mUKKU(12 Meter Height-Double Drum Winching System-90.15.2.3 with 6*200-LED Flood Light) (SC)

    Electricity & lightingStreet lights· Kannur· #124075

    ₹5.4 L Completed 14 Sept 2026Rec. 9 Mar 2024Paid ₹5.4 L
  • Installation of High Mast Lights at near Kuttikol Samskarika Nilayam(12 Meter Height-Double Drum Winching System-90.15.2.3 with 6*200-LED Flood Light)(SC)

    Electricity & lightingStreet lights· Kannur· #124081

    ₹5.4 L Completed 7 Sept 2026Rec. 9 Mar 2024Paid ₹5.4 L
  • Installation of High Mash Lights at Moonam Kutty Colony Mudiyirinji( 12 meter Height –Double Drum Winching System-90.15.2.3 with 6*200LED Fled Light)

    Electricity & lightingStreet lights· Kannur· #121227

    ₹5.4 L Completed 3 Sept 2026Rec. 5 Mar 2024Paid ₹5.4 L
  • Installation of High Mash Lights at Near Rajive Ghandhi Colony Junction Karikittakkari Malayora High WAY( 12 meter Height –Double Drum Winching System-90.15.2.3 with 6*200LED Fled Light)

    Electricity & lightingStreet lights· Kannur· #121256

    ₹5.4 L Completed 3 Sept 2026Rec. 5 Mar 2024Paid ₹5.4 L
  • Installation of High Mast Lights at Angadikadavu Convent Junction(12 Meter Height-Double Drum Winching System-90.15.2.3 with 6*200-LED Flood Light)

    Electricity & lightingStreet lights· Kannur· #124071

    ₹5.4 L Completed 3 Sept 2026Rec. 9 Mar 2024Paid ₹5.4 L
  • Installation of High Mast Lights at Near Aanapanthi Govt.L.P.School(12 Meter Height-Double Drum Winching System-90.15.2.3 with 6*200-LED Flood Light)

    Electricity & lightingStreet lights· Kannur· #124076

    ₹5.4 L Completed 3 Sept 2026Rec. 9 Mar 2024Paid ₹5.4 L
  • Installation of High Mast Lights at Near Neerchal Bridge(08Meter Height-Double Drum Winching System-90.15.2.1 with 5*150-LED Flood Light

    Electricity & lightingStreet lights· Kannur· #128606

    ₹3.0 L Completed 2 Sept 2026Rec. 14 Mar 2024Paid ₹3.0 L
  • High Mast light Near Mundayamparamb Tharaykkal Mithan Temple, Ayyankunnu GP

    Electricity & lightingLighting of public spaces· Kannur· #177910

    ₹3.0 L Sanctioned · 17 Aug 2026Rec. 15 Feb 2024
  • Installation of High Mast Lights at Panakkara Jucxtion((12 Meter Height-Double Drum Winching System-90.15.2.3 with 6*200-LED Flood Light)

    Electricity & lightingStreet lights· Kannur· #124069

    ₹5.4 L Completed 11 May 2026Rec. 9 Mar 2024Paid ₹5.4 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.