MPLADS report card · 18th Lok Sabha

Shri Kumbakudi Sudhakaran

Lok SabhaINCKannur · Kerala

MP score61/100204th of 542 in the 18th Lok Sabha
8th of 20 from Kerala
Also an MP in the 17th Lok Sabha Then: 72% utilisation, 113 works completed, score 79.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

80%

₹11.77 Cr recommended · 298 works
Above median (76%)

Paid to vendors

₹2.73 Cr

19% of allocation
Below median (37%)

Works completed

81

27% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP298 works

    ₹11.77 Cr · 80% of the ₹14.70 Cr allocated

  2. Sanctioned by the district181 works

    61% sanctioned · took 8.3 months on average (due within 45 days)

  3. Completed81 works

    ₹2.22 Cr final cost · 10.5 months from recommendation on average

117 works are still awaiting sanction, 112 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 298 works worth ₹11.77 Cr, a fund utilisation of 80%, higher than 56% of 18th Lok Sabha MPs.
  • The district has sanctioned 181 of them, taking 8.3 months on average.
  • ₹2.73 Cr has been paid to vendors, 19% of the allocation.
  • 81 works are complete, typically 10.5 months after recommendation. 70 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 28 vendors. The largest received 22%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 61/100: finishing works counts most

  1. Works completed 30%27Completed ÷ recommended works.
  2. Spending efficiency 20%81Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%80Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%86Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%19Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    97
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Keltron Component complex Ltd Kannur, 22% of payments across 28 vendors.

District sanction speed

49/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%49Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

298 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of High Mash Lights at Nilappanakunnu Unnathi near T.V.Hall(08 mtr.High Mast With 5x150 Watts Flood Light)

    Electricity & lightingLighting of public spaces· Kannur· #325085

    ₹3.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Purchase of Electronic Wheel Chair for Physically Challenged Person-Chapparapadavu GP-Ward-04

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #243025

    ₹1.1 L Completed 27 Oct 2026Rec. 19 Oct 2025Paid ₹1.1 L
  • Purchase of Electronic Wheel Chair for Physically Challenged Person-ChapparapadavuGP-Ward-01

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #246661

    ₹1.1 L Completed 27 Oct 2026Rec. 7 Nov 2025Paid ₹1.1 L
  • N.H-LIC-Mukk Road Cocreting and Construction of Culvert -Pariyaram GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #324175

    ₹10.0 L Awaiting sanction · 9 daysRec. 23 Oct 2026
  • Installation of 8 Meter High Mast Light at Chakkarakkal Kulam Stop,Chembilode GP

    Electricity & lightingStreet lights· Kannur· #267649

    ₹3.0 L Sanctioned · 22 Oct 2026Rec. 11 Feb 2026
  • Kaniyar Kadavu Kandakassery Road(Odakkadavu)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #323642

    ₹8.7 L Awaiting sanction · 12 daysRec. 20 Oct 2026
  • Installation Of 8 Meter Mini Mast Light near Keezhathur Rajiv Bhavan

    Electricity & lightingLighting of public spaces· Kannur· #323644

    ₹3.0 L Awaiting sanction · 12 daysRec. 20 Oct 2026
  • Installation of High Mast Light at Mel Muringodi Town

    Electricity & lightingLighting of public spaces· Kannur· #323645

    ₹5.5 L Awaiting sanction · 12 daysRec. 20 Oct 2026
  • Purchase of Electronic Wheel Chair for Physically Challenged Person-Chittariparamba GP-Ward-15

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #243023

    ₹1.1 L Completed 17 Oct 2026Rec. 19 Oct 2025Paid ₹1.1 L
  • Purchase of Electronic Wheel Chair for Physically Challenged Person-Chittariparamba GP-Ward-13

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #243024

    ₹1.1 L Completed 17 Oct 2026Rec. 19 Oct 2025Paid ₹1.1 L
  • Installation of Mini Mast Light at Varam Kadavu Junction in Narath Grama Panchayath

    Electricity & lightingStreet lights· Kannur· #171778

    ₹3.0 L Sanctioned · 15 Oct 2026Rec. 2 Feb 2025
  • Installation of Mini Mast Light near Parambukavu Muthappan Temple in Chittariparamba-GP

    Electricity & lightingLighting of public spaces· Kannur· #183174

    ₹3.0 L Sanctioned · 15 Oct 2026Rec. 18 Mar 2025
  • Nallakandy Thazhe Chala Padinjarekkara School Kunnummal Thazhe Canal Road- Tarring

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kannur· #229233

    ₹15.0 L Sanctioned · 15 Oct 2026Rec. 26 Aug 2025
  • Purchase of Electronic Wheel Chair for Physically Challenged Person-KKuttiyatoor GP-Ward-01

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #243018

    ₹1.1 L Completed 15 Oct 2026Rec. 19 Oct 2025Paid ₹1.1 L
  • Purchase of Electronic Wheel Chair for Physically Challenged Person-Sreekandapuram Municipality-Ward-01

    Divyang & social welfarePurchase of prosthetics, wheel chairs, tricycles (manual or motorized), elect scooties, hearing aids· Kannur· #243026

    ₹1.1 L Completed 15 Oct 2026Rec. 19 Oct 2025Paid ₹1.1 L

18th Lok Sabha MPs from Kerala

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Adv Dean Kuriakose · Idukki95%42%10273
2Vellalath Kochukrishnan Nair Sreekandan · Palakkad92%32%12371
3Dr Shashi Tharoor · Thiruvananthapuram68%30%5467
4Adv K Francis George · Kottayam98%23%8965
5K Radhakrishnan · Alathur98%21%3062
6Shri NK Premachandran · Kollam77%42%7862
7Shri Hibi Eden · Ernakulam92%19%2961
8Shri Kumbakudi Sudhakaran · Kannur80%19%8161
9Shri Suresh Kodikunnil · Mavelikkara78%26%7060
10K. C Venugopal · Alappuzha64%37%4558
11Shri Benny Behanan · Chalakudy80%20%3658
12Dr. M.P Abdussamad Samadani · Ponnani97%16%6257

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.