Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
76%
₹11.14 Cr recommended · 164 works
About the median
Paid to vendors
₹8.10 Cr
55% of allocation
Above median (37%)
Works completed
40
24% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP164 works
₹11.14 Cr · 76% of the ₹14.70 Cr allocated
- Sanctioned by the district151 works
92% sanctioned · took 30 days on average (due within 45 days)
- Completed40 works
₹3.51 Cr final cost · 13.1 months from recommendation on average
13 works are still awaiting sanction, 5 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 164 works worth ₹11.14 Cr, a fund utilisation of 76%, higher than 50% of 18th Lok Sabha MPs.
- The district has sanctioned 151 of them, taking 30 days on average.
- ₹8.10 Cr has been paid to vendors, 55% of the allocation.
- 40 works are complete, typically 13.1 months after recommendation. 38 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 24 vendors. The largest received 28%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 56/100: finishing works counts most
- Works completed 30%24Completed ÷ recommended works.
- Spending efficiency 20%43Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%76Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%55Paid to vendors ÷ allocated limit.
- Vendor diversity 10%90How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: AMARNATH PANDEY AMARNATH PANDEY CONTRACTOR, 28% of payments across 24 vendors.
District sanction speed
98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
165 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
S.No.1 Interlocking work over a length of 180 meters on the road from Gram Panchayat Mirpur Budhanibazar Gaushala to Ramlautan Yadavs house.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322328
₹9.0 L Awaiting sanction · 18 daysRec. 14 Oct 2026S.No.2 Interlocking work covering a distance of 150 meters on the road from Durgaprasads house to the Kali Mata Temple in Shivaladih, Gram Panchayat Saraykhas.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322329
₹7.5 L Awaiting sanction · 18 daysRec. 14 Oct 2026S.No.3 Interlocking work over a length of 150 meters on the PWD road, starting from Ram Bharats house in Gram Panchayat Salempur.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322330
₹7.5 L Awaiting sanction · 18 daysRec. 14 Oct 2026S.No.4 Interlocking work over a length of 170 meters on the road leading from the paved canal-bank road (north of the soling) to Bhulbhuliya Colony, Harijandih, in Gram Panchayat Bhairva (Scheduled Caste Area).
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322331
₹8.5 L Awaiting sanction · 18 daysRec. 14 Oct 2026S.No.5 Interlocking work over a length of 180 meters on the paved road, extending from Gram Panchayat Vak Bhavani Mabhari (Tappa Bagh) via the Harijan settlement (near the house of Tar) (Scheduled Caste Area).
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322332
₹10.0 L Awaiting sanction · 18 daysRec. 14 Oct 2026S.No.6 Interlocking work over a length of 170 meters on the road in Gram Panchayat Ghuswa, stretching from Miya's house to the Ramdas Sahu-Teliandih village route.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322333
₹8.5 L Awaiting sanction · 18 daysRec. 14 Oct 2026S.No.7 Interlocking work over a length of 180 meters on the road from the paved road at Shivanand Mauryas house to Narsingh Mauryas house in Gram Panchayat Fatehpur.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322334
₹9.0 L Awaiting sanction · 18 daysRec. 14 Oct 2026S.No.8 Interlocking work over a length of 150 meters on the road from Dayashankars house to Nisar Ali's house in Gram Panchayat Rajpur Mafi.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #322335
₹7.5 L Awaiting sanction · 18 daysRec. 14 Oct 2026No. 2 Interlocking work on 100 meter length from Itirampur Aliganj Road to Aliganj Temple Road.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #239858
₹6.2 L Completed 22 Sept 2026Rec. 3 Oct 2025Paid ₹6.2 LNo. 4 Interlocking work of 180 meter length on the road from Panchayat Bhawan to Buchanus house in Gram Panchayat Katra Booth No. 10.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #239860
₹10.3 L Completed 22 Sept 2026Rec. 3 Oct 2025Paid ₹10.3 LNo. 5 Construction work of 150 meter interlocking on the road from the house of Shivpujan Maurya in Gram Panchayat Mohammadpur Banjarha.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #239861
₹7.8 L Completed 22 Sept 2026Rec. 3 Oct 2025Paid ₹7.8 LNo. 1 Interlocking work of 100 meter length on the road from PWD to Kurmidih Satrudhans house on Guma Farmata Jot Chandradeep Road.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #239857
₹5.8 L Completed 19 Sept 2026Rec. 3 Oct 2025Paid ₹5.8 LNo. 3 Interlocking work of 150 meter length on the road from PWD road to Rajman Vishwakarmas house in Gram Panchayat Kirtapur.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Balrampur· #239859
₹7.3 L Completed 11 Sept 2026Rec. 3 Oct 2025Paid ₹7.3 LInstallation of one high mast light on a 20 meter pole at the Irrigation Department Colony in Gonda district.
Electricity & lightingLighting of public spaces· Gonda· #313119
₹6.7 L Awaiting sanction · 55 daysRec. 7 Sep 2026Work regarding the installation of one high mast light on a 20meter pole near Gayatripuram Crossing in Gonda district.
Electricity & lightingLighting of public spaces· Gonda· #313120
₹6.7 L Awaiting sanction · 55 daysRec. 7 Sep 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.