MPLADS report card · 17th Lok Sabha

Kalyan Banerjee

Lok SabhaSreerampur · West Bengal

MP score99/1006th of 539 in the 17th Lok Sabha
1st of 42 from West Bengal
Re-elected to the 18th Lok Sabha Then: 63% utilisation, 97 works completed, score 82.

Allocated limit

₹7.00 Cr

Median ₹8.60 Cr

Fund utilisation

100%

₹7.00 Cr recommended · 113 works
About the median

Paid to vendors

₹6.87 Cr

98% of allocation
Above median (88%)

Works completed

111

98% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP113 works

    ₹7.00 Cr · 100% of the ₹7.00 Cr allocated

  2. Sanctioned by the district113 works

    100% sanctioned · took 3.2 months on average (due within 45 days)

  3. Completed111 works

    ₹6.87 Cr final cost · 13.3 months from recommendation on average

In plain words

What the numbers say

  • Recommended 113 works worth ₹7.00 Cr, a fund utilisation of 100%, higher than 87% of 17th Lok Sabha MPs.
  • The district has sanctioned 113 of them, taking 3.2 months on average.
  • ₹6.87 Cr has been paid to vendors, 98% of the allocation.
  • 111 works are complete, typically 13.3 months after recommendation. 108 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 79 vendors. The largest received 6.4%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 99/100: finishing works counts most

  1. Works completed 30%98Completed ÷ recommended works.
  2. Spending efficiency 20%100Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%97Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%98Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: DK Jaiswal, 6.4% of payments across 79 vendors.

District sanction speed

92/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%92Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

113 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • INSTALATION OF 3 NOS COLD WATER FOUNTAIN AT WARD NO 5 UNDER RISHRA MUNICIPALITY

    Drinking waterInstalling community drinking water plants· Hooghly· #71786

    ₹5.5 L Completed 5 Oct 2026Rec. 30 Dec 2023Paid ₹5.5 L
  • INSTALATION OF 3 NOS COLD WATER FOUNTAIN AT WARD NO 6 UNDER RISHRA MUNICIPALITY

    Drinking waterInstalling community drinking water plants· Hooghly· #71787

    ₹5.6 L Completed 5 Oct 2026Rec. 30 Dec 2023Paid ₹5.6 L
  • construction CC road From Bappa Ballab house to S.Chatterjee house via Majhi house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #25524

    ₹6.9 L Completed 7 Sept 2026Rec. 23 Sep 2023Paid ₹6.9 L
  • construction CC road From Pradip Chatterjee house to B. Malik house via Swapan Mukherjee house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #25528

    ₹7.6 L Completed 7 Sept 2026Rec. 23 Sep 2023Paid ₹7.6 L
  • Construction CC road From Benaras Road towars The House of Becha Samanta And Benaras Road to A. Santra house Sansad - I

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #25535

    ₹5.8 L Completed 7 Sept 2026Rec. 23 Sep 2023Paid ₹5.8 L
  • PURCHASE OF 7 NOS INTEL CORE I3 BASED DESKTOP & 1 NOS PROJECTOR AND SCREEN FOR SHEORAPHULI SURENDRANATH VIDYANIKETAN FOR GIRLS SITUATED AT WARD NO.10 UNDER BAIDYABATI MUNICIPALITY.

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Hooghly· #73990

    ₹3.1 L Completed 3 Sept 2026Rec. 3 Jan 2024Paid ₹3.1 L
  • CONSTRUCTION OF CONCRETE ROAD AT ADARSHANAGAR DHANMATH AT WARD NO. 22 UNDER BAIDYABATI MUNICIPALITY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #106458

    ₹5.0 L Completed 3 Sept 2026Rec. 16 Feb 2024Paid ₹5.0 L
  • Construction of Concrete Road near Masjid KhandakarPara, Ward No. 10

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #28850

    ₹5.0 L Completed 2 Sept 2026Rec. 29 Sep 2023Paid ₹5.0 L
  • Construction of Concrete Road from SBI ATM to H/o. Hazra, Ward No. 01

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #28852

    ₹5.0 L Completed 2 Sept 2026Rec. 29 Sep 2023Paid ₹5.0 L
  • Construction of Concrete Road from H/o. Bimal Paul to H/o. Bimal Orao, Ward No. 17

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #28854

    ₹5.0 L Completed 2 Sept 2026Rec. 29 Sep 2023Paid ₹5.0 L
  • Construction of Concrete Road from H/o. Purnima Mondal to H/o. Probal Singha & from H/o. Kalidas Ghosh to H/o. Amal Paul, Ward No. 13

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #28855

    ₹5.0 L Completed 2 Sept 2026Rec. 29 Sep 2023Paid ₹5.0 L
  • Construction of Concrete Road from Durbar Sangha Club to H/o. Prakash Banerjee, Ward No. 19

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #28856

    ₹5.0 L Completed 2 Sept 2026Rec. 29 Sep 2023Paid ₹5.0 L
  • Construction of Concrete Road from H/o. Tapas Saha to H/o. Netai Banerjee, Ward No. 21

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #28851

    ₹5.0 L Completed 25 Aug 2026Rec. 29 Sep 2023Paid ₹5.0 L
  • Construction of Concrete Road from H/o. Gobinda Saha to 4 H/o. Dwijen Saha, Ward No. 11

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #28853

    ₹5.0 L Completed 25 Aug 2026Rec. 29 Sep 2023Paid ₹5.0 L
  • ICU VENTILATOR AT RISHRA MATRI SADAN RUN BY RISHRA MUNICIPALITY SITUATED AT WARD NO 11

    HealthPurchase of hospital equipment· Hooghly· #29048

    ₹11.8 L Completed 23 Jul 2026Rec. 30 Sep 2023Paid ₹11.8 L

17th Lok Sabha MPs from West Bengal

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Kalyan Banerjee · Sreerampur100%98%11199
2Ms Mimi Chakraborty · Jadavpur100%96%25097
3Shri Abhishek Banerjee · Diamond Harbour100%97%14997
4Ms Mahua Moitra · Krishnanagar100%100%2797
5Pratima Mondal · Joynagar100%97%14096
6Smt Sajda Ahmed · Uluberia96%96%18096
7Smt Locket Chatterjee · Hooghly100%100%30796
8Smt Satabdi Roy (Banerjee) · Birbhum100%99%12795
9Shri Kunar Hembram · Jhargram100%100%3195
10Dr Sukanta Majumdar · Balurghat94%82%33695
11Asit Kumar Mal · Bolpur100%100%5594
12Shri Deepak (Dev) Adhikari · Ghatal93%87%19594

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.