18th of 20 from Kerala
Allocated limit
₹8.26 Cr
Median ₹8.60 Cr
Fund utilisation
96%
₹7.89 Cr recommended · 69 works
About the median
Paid to vendors
₹5.53 Cr
67% of allocation
Below median (88%)
Works completed
51
74% of recommended
Below median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP69 works
₹7.89 Cr · 96% of the ₹8.26 Cr allocated
- Sanctioned by the district69 works
100% sanctioned · took 15.1 months on average (due within 45 days)
- Completed51 works
₹4.48 Cr final cost · 16.5 months from recommendation on average
In plain words
What the numbers say
- Recommended 69 works worth ₹7.89 Cr, a fund utilisation of 96%, higher than 34% of 17th Lok Sabha MPs.
- The district has sanctioned 69 of them, taking 15.1 months on average.
- ₹5.53 Cr has been paid to vendors, 67% of the allocation.
- 51 works are complete, typically 16.5 months after recommendation. 27 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 41 vendors. The largest received 9.7%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 77/100: finishing works counts most
- Works completed 30%74Completed ÷ recommended works.
- Spending efficiency 20%81Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%53Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%67Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: VISWANATHAN A I, 9.7% of payments across 41 vendors.
District sanction speed
50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
69 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Improvement works of Maramkode ST Colony Road, Ward 05, Kodassery Grama Panchayath
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #131284
₹19.1 L Completed 22 Sept 2026Rec. 16 Mar 2024Paid ₹19.1 LMinimast Light in Parappuram- Cheruvelikkunnu Road at East nada of North Ezhipram Bhagavathy Temple, ward 12, Vazhakkulam Grama Panchayath
Electricity & lightingLighting of public spaces· Ernakulam· #175078
₹1.8 L Sanctioned · 16 Sept 2026Rec. 30 Oct 2023Side protection work along with paving of concrete tiles in avanamcode LI Canal Bund road ward 14 kalady Gramapanchayat
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #238915
₹20.0 L Sanctioned · 3 Sept 2026Rec. 30 Oct 2023Construction of Auditorium in the 1st floor of the school building of St.Mary's High School, Vynthala, Palayamparambu PO, ward 16, Kadukutty Grama Panchayath, Thrissur
Education & librariesConstruction of rooms and halls in school and colleges· Thrissur· #131474
₹26.2 L Completed 19 Aug 2026Rec. 16 Mar 2024Paid ₹26.2 L8 Meter Minimast Light with 4 LED Lights of 120 Watts at Sreebhoothpuram Masjid Thouheed Junction, Ward 13, Sreemoolanagaram Grama Panchayath
Electricity & lightingLighting of public spaces· Ernakulam· #131945
₹1.8 L Vendor Identification · 13 Jul 2026Rec. 16 Mar 2024Paid ₹1.6 LPaving of interlock concrete tiles in Neelimala SC Colony road ward 7 Kunnathunad Gramapanchayat
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #238913
₹25.8 L Sanctioned · 13 Jul 2026Rec. 30 Oct 2023Construction of Building to Aiswarya Anganwadi No. 150, Ward 06, Kaipamangalam grama Panchayath, Thrissur
Education & librariesConstruction of buildings for crèches and anganwadies· Thrissur· #131724
₹23.0 L Completed 7 May 2026Rec. 16 Mar 2024Paid ₹23.0 LPaving inter locking bricks in Muppadimugal Colony Road, Ward 04, Vadavukode Puthencruz Grama Panchayath (SC Work)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #132126
₹7.4 L Sanctioned · 13 Jan 2026Rec. 16 Mar 2024Mini mast Light at Kolencherry Kavala Jn Ward 5, Kalady Manjpra road, Kalady Grama Panchayat
Electricity & lightingLighting of public spaces· Ernakulam· #175058
₹1.2 L Completed 13 Nov 2025Rec. 30 Oct 2023Paid ₹1.2 LConstruction of Laboratory room on the 1st floor of existing Physics Lab for Higher Secondary wing of Govt HSS, Pazhamthottam, Aikaranad Grama Panchayath
Education & librariesSetting up of laboratories· Ernakulam· #131885
₹15.0 L Sanctioned · 6 Nov 2025Rec. 16 Mar 2024Formation, concreting and drainage works of Kadambayath moola - Mullanmala road Ward 02, Vadavucode - Puthencruz Grama Panchayath (SC Work)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #132006
₹9.0 L Sanctioned · 6 Nov 2025Rec. 16 Mar 2024Side Protection work and paving interlocking bricks in the 2nd and 3rd reach of Neermel Colony Road- Ward 10, Vadavukode - Puthencruz Grama Panchayath (SC Work)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #132011
₹15.0 L Sanctioned · 6 Nov 2025Rec. 16 Mar 2024Side protection work of C.R SC Colony Road, Ward 03, Vadavukode - Puthencruz Grama Panchayath (SC Work)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #132020
₹5.0 L Sanctioned · 6 Nov 2025Rec. 16 Mar 2024Construction of Assmebly hall with tress work in the yard of Government UP School Kunnakkurudy and paving of Concrete Tiles on the floor of the Assemby Hall, Mazhuvannoor Grama Panchayath
Education & librariesConstruction of rooms and halls in school and colleges· Ernakulam· #132068
₹18.0 L Sanctioned · 6 Nov 2025Rec. 16 Mar 2024Construction of Building for Nedungapra Public Library at ward 7, Nedungapra, Vengoor Grama Panchayath, Ernakulam District
Education & librariesConstruction of public libraries and reading rooms· Ernakulam· #175045
₹22,425 Work partially Completed · 6 Nov 2025Rec. 30 Oct 2023Paid ₹14,883
17th Lok Sabha MPs from Kerala
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | M P Abdussamad Samadani · Malappuram | 84% | 84% | 179 | 95 |
| 2 | T N Prathapan · Thrissur | 100% | 95% | 90 | 94 |
| 3 | E T Mohammed Basheer · Ponnani | 84% | 83% | 117 | 94 |
| 4 | Rahul Gandhi · Wayanad | 90% | 90% | 71 | 93 |
| 5 | Shri M K Raghavan · Kozhikode | 77% | 74% | 213 | 92 |
| 6 | Shri Rajmohan Unnithan · Kasaragod | 98% | 97% | 283 | 92 |
| 7 | Dr Shashi Tharoor · Thiruvananthapuram | 91% | 84% | 150 | 92 |
| 8 | Adv Adoor Prakash · Attingal | 100% | 97% | 290 | 92 |
| 9 | Anto Antony · Pathanamthitta | 99% | 88% | 154 | 90 |
| 10 | Adv Dean Kuriakose · Idukki | 90% | 82% | 147 | 90 |
| 11 | Smt Ramya Haridas · Alathur | 100% | 100% | 418 | 90 |
| 12 | Vellalath Kochukrishnan Nair Sreekandan · Palakkad | 100% | 83% | 145 | 90 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.