MPLADS report card · 18th Lok Sabha

Shri Benny Behanan

Lok SabhaINCChalakudy · Kerala

MP score58/100237th of 542 in the 18th Lok Sabha
11th of 20 from Kerala
Also an MP in the 17th Lok Sabha Then: 96% utilisation, 51 works completed, score 77.
  • Works waiting for sanction

    79 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹16.47 Cr

Median ₹14.70 Cr

Fund utilisation

80%

₹13.13 Cr recommended · 170 works
Above median (76%)

Paid to vendors

₹3.30 Cr

20% of allocation
Below median (37%)

Works completed

36

21% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP170 works

    ₹13.13 Cr · 80% of the ₹16.47 Cr allocated

  2. Sanctioned by the district90 works

    53% sanctioned · took 10.8 months on average (due within 45 days)

  3. Completed36 works

    ₹2.08 Cr final cost · 17.2 months from recommendation on average

80 works are still awaiting sanction, 79 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 170 works worth ₹13.13 Cr, a fund utilisation of 80%, higher than 55% of 18th Lok Sabha MPs.
  • The district has sanctioned 90 of them, taking 10.8 months on average.
  • ₹3.30 Cr has been paid to vendors, 20% of the allocation.
  • 36 works are complete, typically 17.2 months after recommendation. 35 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 23 vendors. The largest received 15%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 58/100: finishing works counts most

  1. Works completed 30%21Completed ÷ recommended works.
  2. Spending efficiency 20%63Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%80Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%97Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%20Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: TATA MOTORS, 15% of payments across 23 vendors.

District sanction speed

33/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%33Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

170 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • MINIMAST LED LIGHT IN FRONT OF AZHAKAM DURGADEVI TEMPLE

    Electricity & lightingStreet lights· Thrissur· #168973

    ₹1.9 L Completed 31 Oct 2026Rec. 25 Jan 2025Paid ₹1.9 L
  • TILE PAVING OF ATHANI MASJID ROAD-HARIJAN UNNATHI ROAD(RENOVATION) IN WARD 6 OF ERIYAD GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #294321

    ₹20.5 L Sanctioned · 30 Oct 2026Rec. 11 Jul 2026
  • LAYING OF INTERLOCK PAVER BLOCKS IN THOTTUVA HEALTH SUBCENTRE PAKALVEED ROAD IN OKKAL GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #211409

    ₹3.5 L Completed 29 Oct 2026Rec. 23 Jun 2025Paid ₹3.5 L
  • LAYING OF INTERLOCK PAVER BLOCKS IN GURUDARSHANA ROAD IN OKKAL GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #211411

    ₹4.6 L Completed 29 Oct 2026Rec. 23 Jun 2025Paid ₹4.6 L
  • RENOVATION OF HOMEO HOSPITAL ROAD TILE PAVING IN OKKAL GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #211420

    ₹1.1 L Completed 29 Oct 2026Rec. 23 Jun 2025Paid ₹1.1 L
  • CONSTRUCTION OF MANGALAPPILLY ROAD IN WARD 5 IN PUTHENCHIRA GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #212202

    ₹9.1 L Completed 15 Oct 2026Rec. 25 Jun 2025Paid ₹9.1 L
  • CONSTRUCTION OF ANGANWADY BUILDING(COMPLETION WORK) IN WARD 10 VAZHAKKULAM GP

    Education & librariesConstruction of buildings for crèches and anganwadies· Ernakulam· #177953

    ₹9.7 L Completed 9 Oct 2026Rec. 27 Feb 2025Paid ₹9.7 L
  • MINIMAST LIGHT AT PANDIYAM JN, VAZHAKULAM

    Electricity & lightingStreet lights· Ernakulam· #162733

    ₹2.1 L Completed 5 Oct 2026Rec. 31 Dec 2024Paid ₹2.1 L
  • MINIMAST LIGHT NEAR KAIPOORIKKARA MUSLIM JAMA ATH

    Electricity & lightingStreet lights· Ernakulam· #162712

    ₹2.1 L Completed 1 Oct 2026Rec. 31 Dec 2024Paid ₹2.1 L
  • MINIMAST LIGHT IN BH NAGAR JUNCTION, IN RAJAJI ROAD

    Electricity & lightingStreet lights· Ernakulam· #162725

    ₹2.1 L Completed 1 Oct 2026Rec. 31 Dec 2024Paid ₹2.1 L
  • MINIMAST LIGHT IN BLOCK JN, VAZHAKULAM

    Electricity & lightingStreet lights· Ernakulam· #162727

    ₹2.1 L Completed 1 Oct 2026Rec. 31 Dec 2024Paid ₹2.1 L
  • MINIMAST LIGHT AT ST ANDREWS CHURCH SURROUNDINGS PERIYARMUGHAM

    Electricity & lightingStreet lights· Ernakulam· #165411

    ₹2.2 L Completed 1 Oct 2026Rec. 14 Jan 2025Paid ₹2.2 L
  • MINIMAST LIGHT AT KAINADANMALA JUNCTION

    Electricity & lightingStreet lights· Ernakulam· #165417

    ₹2.1 L Completed 1 Oct 2026Rec. 14 Jan 2025Paid ₹2.1 L
  • SIDE PROTECTION AND SECOND REACH CONCRETING OF LAPLIMOOPAN COLONY ROAD IN WARD 7 OF KODASSERY GP(SC WORK)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Thrissur· #317892

    ₹8.7 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • MINIMAST LED LIGHT AT PALUPPUZHA MATTATHIKKADAVU ROAD WARD12 IN ANNAMANADA GP

    Electricity & lightingLighting of public spaces· Thrissur· #165383

    ₹2.3 L Sanctioned · 23 Sept 2026Rec. 14 Jan 2025

18th Lok Sabha MPs from Kerala

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Adv Dean Kuriakose · Idukki95%42%10273
2Vellalath Kochukrishnan Nair Sreekandan · Palakkad92%32%12371
3Dr Shashi Tharoor · Thiruvananthapuram68%30%5467
4Adv K Francis George · Kottayam98%23%8965
5K Radhakrishnan · Alathur98%21%3062
6Shri NK Premachandran · Kollam77%42%7862
7Shri Hibi Eden · Ernakulam92%19%2961
8Shri Kumbakudi Sudhakaran · Kannur80%19%8161
9Shri Suresh Kodikunnil · Mavelikkara78%26%7060
10K. C Venugopal · Alappuzha64%37%4558
11Shri Benny Behanan · Chalakudy80%20%3658
12Dr. M.P Abdussamad Samadani · Ponnani97%16%6257

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.