Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Anurag Sharma

Lok SabhaBJPJhansi · Uttar Pradesh

MP score65/100155th of 542 in the 18th Lok Sabha
33rd of 80 from Uttar Pradesh
Also an MP in the 17th Lok Sabha Then: 100% utilisation, 137 works completed, score 98.

Allocated limit

₹15.20 Cr

Median ₹14.70 Cr

Fund utilisation

64%

₹9.77 Cr recommended · 171 works
Below median (76%)

Paid to vendors

₹7.72 Cr

51% of allocation
Above median (37%)

Works completed

95

56% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP171 works

    ₹9.77 Cr · 64% of the ₹15.20 Cr allocated

  2. Sanctioned by the district162 works

    95% sanctioned · took 39 days on average (due within 45 days)

  3. Completed95 works

    ₹4.82 Cr final cost · 9.4 months from recommendation on average

9 works are still awaiting sanction, 9 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 171 works worth ₹9.77 Cr, a fund utilisation of 64%, higher than 30% of 18th Lok Sabha MPs.
  • The district has sanctioned 162 of them, taking 39 days on average.
  • ₹7.72 Cr has been paid to vendors, 51% of the allocation.
  • 95 works are complete, typically 9.4 months after recommendation. 70 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 27 vendors. The largest received 19%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 65/100: finishing works counts most

  1. Works completed 30%56Completed ÷ recommended works.
  2. Spending efficiency 20%62Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%64Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%74Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%51Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AADITYA VAIDHYA, 19% of payments across 27 vendors.

District sanction speed

97/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%97Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

171 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of Crematorium in village Basatguwan Block Bar.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313454

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Construction of Crematorium in village Kachnoda Kalan Block Birdha.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313455

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Construction of Crematorium in village Padna Block Birdha.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313456

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Construction of Crematorium in village Dailwara-Siddhpura Block Jakhaura.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313457

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Construction of Crematorium in village Natthi Khera Block Talbehat.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313458

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Construction of Crematorium in village Dongra Kalan Block Madawra.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313459

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Construction of Crematorium in village Girar Block Madawra.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313460

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Construction of Crematorium in village Dhauri Sagar Block Madawra.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Lalitpur· #313461

    ₹6.0 L Sanctioned · 30 Oct 2026Rec. 8 Sep 2026
  • Contruction of 100 mtr CC or Apex and Nali from Sri Ram Mandir towards Veer Singh Lodhi house at village Kuantala Block Jakhaura.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #236603

    ₹5.0 L Completed 15 Oct 2026Rec. 22 Sep 2025Paid ₹5.0 L
  • Construction of 50mtr Apex road and Nali from main road towards sankerji temple at Chirgaon Jugyaan mohulla.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jhansi· #235769

    ₹2.5 L Completed 10 Oct 2026Rec. 20 Sep 2025Paid ₹2.5 L
  • Contruction of 100 mtr CC or Apex and Nali from Chandan Pal house towards Photi sher tigela at village Sunauri Block Talbehat.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #236600

    ₹4.9 L Completed 9 Oct 2026Rec. 22 Sep 2025Paid ₹4.9 L
  • Contruction of 100 mtr CC or Apex and Nali from Veeran Kushwaha house towards Shamshan Ghat at village Terai Block Talbehat.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #236601

    ₹5.0 L Completed 9 Oct 2026Rec. 22 Sep 2025Paid ₹5.0 L
  • Contruction of 65 mtr CC or Apex and Nali from Rajaram Vishkarma house towards Rajkumar Goswami and Avdesh Tiwari house towards Subhash Sharma house at Azadpura II Lalitpur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #236604

    ₹3.9 L Completed 9 Oct 2026Rec. 22 Sep 2025Paid ₹3.9 L
  • Contruction of 65 mtr CC or Apex and Nali from Gopi Pahalwan house towards Bhagat Singh house at Azadpura I Lalitpur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #236605

    ₹4.9 L Completed 9 Oct 2026Rec. 22 Sep 2025Paid ₹4.9 L
  • Contruction of 65 mtr CC or Apex and Nali from Tar Singh house towards Kripa Shankar house near NYK at Nehrunagar Lalitpur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lalitpur· #236606

    ₹4.9 L Completed 9 Oct 2026Rec. 22 Sep 2025Paid ₹4.9 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.