MPLADS report card · 17th Lok Sabha

Smt Anupriya Patel

Lok SabhaMirzapur · Uttar Pradesh

MP score64/100483rd of 539 in the 17th Lok Sabha
72nd of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 71% utilisation, 0 works completed, score 18.
  • Payments concentrated with one vendor

    71% of vendor payments went to NPS CONSULTANT PRIVATE LIMITED.

Allocated limit

₹10.27 Cr

Median ₹8.60 Cr

Fund utilisation

93%

₹9.52 Cr recommended · 20 works
Below median (98%)

Paid to vendors

₹9.45 Cr

92% of allocation
About the median

Works completed

7

35% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP20 works

    ₹9.52 Cr · 93% of the ₹10.27 Cr allocated

  2. Sanctioned by the district20 works

    100% sanctioned · took 42 days on average (due within 45 days)

  3. Completed7 works

    ₹6.63 Cr final cost · 13.4 months from recommendation on average

In plain words

What the numbers say

  • Recommended 20 works worth ₹9.52 Cr, a fund utilisation of 93%, higher than 23% of 17th Lok Sabha MPs.
  • The district has sanctioned 20 of them, taking 42 days on average.
  • ₹9.45 Cr has been paid to vendors, 92% of the allocation.
  • 7 works are complete, typically 13.4 months after recommendation. 6 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 16 vendors. The largest received 71%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 64/100: finishing works counts most

  1. Works completed 30%35Completed ÷ recommended works.
  2. Spending efficiency 20%70Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%93Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%86Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%92Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    37
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: NPS CONSULTANT PRIVATE LIMITED, 71% of payments across 16 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

20 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • INSTALLATION OF WATER COOLER IN CHUNAR TAHSIL BAR ASSOCIATION PARISAR

    Drinking waterInstalling community drinking water plants· Mirzapur· #128760

    ₹93,810 Completed 4 Feb 2026Rec. 14 Mar 2024Paid ₹93,810
  • The establishment of a solar energy-based mini water supply scheme at Shri Ramprasad Singh Girls Inter College, Sherpur, Mirzapur.

    Drinking waterInstalling community drinking water plants· Mirzapur· #61347

    ₹8.8 L Completed 31 Jan 2026Rec. 13 Dec 2023Paid ₹8.8 L
  • The establishment of a solar high-mast at Shri Maharana Pratap Ardash Inter College, Satidham Raipuri, Chunar.

    Electricity & lightingLighting of public spaces· Mirzapur· #61336

    ₹1.2 L Completed 17 May 2025Rec. 13 Dec 2023Paid ₹1.2 L
  • installation of semi high mast light in maximum 810 location of different gram panchayat in mirzapur district (all gram panchayat list enclosed in letter no 357)

    Electricity & lightingLighting of public spaces· Mirzapur· #103447

    ₹6.27 Cr Completed 17 May 2025Rec. 12 Feb 2024Paid ₹6.27 Cr
  • CONSTRUCTION OF ROOM IN VINDHY PUBLIC JUNIOR HIGH SCHOOL

    Education & librariesConstruction of rooms and halls in school and colleges· Mirzapur· #127915

    ₹5.0 L Vendor Identification · 5 Jul 2024Rec. 14 Mar 2024Paid ₹4.3 L
  • SARDAR PATEL JUNIOR HIGH SCHOOL MEHDIPUR AHRAURA

    Education & librariesConstruction of rooms and halls in school and colleges· Mirzapur· #128748

    ₹5.0 L Vendor Identification · 5 Jul 2024Rec. 14 Mar 2024Paid ₹5.0 L
  • The establishment of solar energy-based battery backup at Ballabh Bhai Patel Inter College, Gangapur. Installation work.

    Electricity & lightingLighting of public spaces· Mirzapur· #61330

    ₹8.4 L Completed 1 May 2024Rec. 13 Dec 2023Paid ₹8.4 L
  • The installation of solar energy-based battery backup at Usha Singh Law College, Bareva, Chunar.

    Electricity & lightingLighting of public spaces· Mirzapur· #61333

    ₹8.4 L Completed 1 May 2024Rec. 13 Dec 2023Paid ₹8.4 L
  • The establishment of a solar energy-based battery backup at kewlpatti baijnath madhyamik vidyalay , parasbandha kamalpur,Mirzapur.

    Electricity & lightingLighting of public spaces· Mirzapur· #68142

    ₹8.4 L Completed 1 May 2024Rec. 22 Dec 2023Paid ₹8.4 L
  • CONSTRUCTION OF ROOM IN ADARSH BRIJRAJ INTER COLLEGE CHAUKHADA

    Education & librariesConstruction of rooms and halls in school and colleges· Mirzapur· #127916

    ₹5.0 L Vendor Identification · 16 Mar 2024Rec. 14 Mar 2024Paid ₹5.0 L
  • CONSTRUCTION OF ROOM IN MATHANA INTERMEDIATE COLLEGE HARIHARPUR

    Education & librariesConstruction of rooms and halls in school and colleges· Mirzapur· #127917

    ₹5.0 L Vendor Identification · 16 Mar 2024Rec. 14 Mar 2024Paid ₹5.0 L
  • CONSTRUCTION OF LADIES TOILETS IN KACHAHARI PARISAR MIRZAPUR FOR ADVOCATES/CLIENTS

    Sanitation & drainageConstruction of public toilets and bathrooms· Mirzapur· #127918

    ₹14.0 L Vendor Identification · 16 Mar 2024Rec. 14 Mar 2024Paid ₹13.6 L
  • FROM SITARAM BIND FARM TO BRAHMANAND HOUSE PATHWAYS (INTERLOCKING) WORK IN VILLAGE BAURAI

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mirzapur· #127919

    ₹8.0 L Physical Inspection · 16 Mar 2024Rec. 14 Mar 2024Paid ₹8.0 L
  • CONSTRUCTION OF ROOMS IN CHAUDHARI RAM HARAKH SINGH INTER COLLEGE BARGADA HALIA

    Education & librariesConstruction of rooms and halls in school and colleges· Mirzapur· #125848

    ₹5.0 L Vendor Identification · 15 Mar 2024Rec. 12 Mar 2024Paid ₹5.0 L
  • CONSTRUCTION OF TOILETS BLOCK IN BAPU UPRAUDH INTER COLLEGE LALGANJ

    Sanitation & drainageConstruction of toilet blocks· Mirzapur· #125854

    ₹5.7 L Sanctioned · 15 Mar 2024Rec. 12 Mar 2024

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.