Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Smt Anupriya Patel

Lok SabhaAD(S)Mirzapur · Uttar Pradesh

MP score18/100518th of 542 in the 18th Lok Sabha
77th of 80 from Uttar Pradesh
Also an MP in the 17th Lok Sabha Then: 93% utilisation, 7 works completed, score 64.
  • Payments concentrated with one vendor

    65% of vendor payments went to Atharv Enterprises.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

71%

₹10.38 Cr recommended · 15 works
Below median (76%)

Paid to vendors

₹5.26 Cr

36% of allocation
About the median

Works completed

0

0% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP15 works

    ₹10.38 Cr · 71% of the ₹14.70 Cr allocated

  2. Sanctioned by the district13 works

    87% sanctioned · took 25 days on average (due within 45 days)

  3. Completed0 works

    ₹0 final cost

2 works are still awaiting sanction, 1 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 15 works worth ₹10.38 Cr, a fund utilisation of 71%, higher than 40% of 18th Lok Sabha MPs.
  • The district has sanctioned 13 of them, taking 25 days on average.
  • ₹5.26 Cr has been paid to vendors, 36% of the allocation.
  • 0 works are complete.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 5 vendors. The largest received 65%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 18/100: finishing works counts most

  1. Works completed 30%0Completed ÷ recommended works.
  2. Spending efficiency 20%0Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%71Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%36Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    43
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Atharv Enterprises, 65% of payments across 5 vendors.

District sanction speed

97/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%97Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

15 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • class room with varandah in om memorial public school baghaura rajgarh

    Education & librariesConstruction of rooms and halls in school and colleges· Mirzapur· #324358

    ₹10.0 L Awaiting sanction · 8 daysRec. 24 Oct 2026
  • semi high mast installation in several places chhanbe block of district mirzapur vide letter number 900 DATED 25 AUGUST 2026 of PD DRDA Mirzapur

    Electricity & lightingLighting of public spaces· Mirzapur· #312966

    ₹2.66 Cr Sanctioned · 15 Sept 2026Rec. 7 Sep 2026
  • HANDPUMP installation in several places OF block RAJGARH,LALAGANJ,JAMALPUR,SIKHAD,PAHADI,CITY,HALIA,MAJHAWA AND PATEHARA of district mirzapur vide letter number 900 DATED 25 AUGUST 2026 of PD DRDA Mirzapur

    Drinking waterInstalling hand pumps· Mirzapur· #312967

    ₹15.7 L Sanctioned · 15 Sept 2026Rec. 7 Sep 2026
  • HANDPUMP installation in several places OF block LALAGANJ,PAHADI,CITY,HALIA, AND PATEHARA of district mirzapur vide letter number 900 DATED 25 AUGUST 2026 of PD DRDA Mirzapur

    Drinking waterInstalling hand pumps· Mirzapur· #312972

    ₹24.3 L Sanctioned · 15 Sept 2026Rec. 7 Sep 2026
  • rooms and verandah in om sai janta janardan inter college kalwari khurd madihan mirzapur vide letter no 249 dated 05 september 2026

    Education & librariesConstruction of rooms and halls in school and colleges· Mirzapur· #312959

    ₹10.0 L Awaiting sanction · 55 daysRec. 7 Sep 2026
  • supply and installation of solar high mast in PHC at village negura ribai singh of kishunpur gram panchayat

    Electricity & lightingLighting of public spaces· Mirzapur· #229638

    ₹1.2 L Physical Inspection · 8 Oct 2025Rec. 27 Aug 2025Paid ₹1.1 L
  • supply and installation of solar high mast near shiv mandir complex at village negura ribai singh of kishunpur gram panchayat

    Electricity & lightingLighting of public spaces· Mirzapur· #229639

    ₹1.2 L Physical Inspection · 8 Oct 2025Rec. 27 Aug 2025Paid ₹1.1 L
  • supply and installation of solar high mast near primari school at village negura ribai singh of kishunpur gram panchayat

    Electricity & lightingLighting of public spaces· Mirzapur· #229640

    ₹1.2 L Physical Inspection · 8 Oct 2025Rec. 27 Aug 2025Paid ₹1.1 L
  • works recomonded in letter no 217 for Sikhar block

    Electricity & lightingLighting of public spaces· Mirzapur· #229414

    ₹1.16 Cr Vendor Identification · 17 Sept 2025Rec. 26 Aug 2025Paid ₹84.8 L
  • works recomonded in letter no 216 for jamalpur block

    Electricity & lightingLighting of public spaces· Mirzapur· #229416

    ₹2.21 Cr Vendor Identification · 11 Sept 2025Rec. 26 Aug 2025Paid ₹1.72 Cr
  • recommended work in letter number 215 for narayanpur block

    Electricity & lightingLighting of public spaces· Mirzapur· #229418

    ₹1.97 Cr Work partially Completed · 11 Sept 2025Rec. 26 Aug 2025Paid ₹1.69 Cr
  • works recommended in letter no 218 for majhawa block

    Electricity & lightingLighting of public spaces· Mirzapur· #229419

    ₹27.2 L Physical Inspection · 11 Sept 2025Rec. 26 Aug 2025Paid ₹27.1 L
  • works recommended in letter no 219 for kon block

    Electricity & lightingLighting of public spaces· Mirzapur· #229420

    ₹71.5 L Vendor Identification · 11 Sept 2025Rec. 26 Aug 2025Paid ₹61.0 L
  • SERIAL NUMBER 03 WORK OF LETTER NUMBER 1609 DATED 17 FEB 2025 OF PD DRDA MIRZAPUR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mirzapur· #184919

    ₹36.4 L Vendor Identification · 2 May 2025Rec. 20 Mar 2025Paid ₹9.0 L
  • SERIAL NUMBER 09 OF LETTER NUMBER 1609 DATED 17 FEB 2025 OF PD DRDA MIRZAPUR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mirzapur· #184920

    ₹39.1 L Sanctioned · 2 May 2025Rec. 20 Mar 2025

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.