78th of 81 from Uttar Pradesh
Works waiting for sanction
33 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.
Allocated limit
₹1.62 Cr
Median ₹8.60 Cr
Fund utilisation
46%
₹73.8 L recommended · 46 works
Below median (98%)
Paid to vendors
₹33.1 L
20% of allocation
Below median (88%)
Works completed
3
6.5% of recommended
Below median (83%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP46 works
₹73.8 L · 46% of the ₹1.62 Cr allocated
- Sanctioned by the district13 works
28% sanctioned · took 7.4 months on average (due within 45 days)
- Completed3 works
₹23.3 L final cost · 8.6 months from recommendation on average
33 works are still awaiting sanction, 33 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 46 works worth ₹73.8 L, a fund utilisation of 46%, higher than 0.6% of 17th Lok Sabha MPs.
- The district has sanctioned 13 of them, taking 7.4 months on average.
- ₹33.1 L has been paid to vendors, 20% of the allocation.
- 3 works are complete, typically 8.6 months after recommendation. 3 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 10 vendors. The largest received 67%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 38/100: finishing works counts most
- Works completed 30%7Completed ÷ recommended works.
- Spending efficiency 20%70Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%46Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%60Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%20Paid to vendors ÷ allocated limit.
- Vendor diversity 10%Not enough dataHow spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: UP STATE AGRO, 67% of payments across 10 vendors.
District sanction speed
36/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%36Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
46 works · tap “Photos” to see geo-tagged photos from eSAKSHI
construction of cc road from the pitch road to mohan yadavs house to gram panchayat mahmudpur bauwa
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #325191
₹1.3 L Physical Inspection · 31 Oct 2026Rec. 30 Oct 2026Paid ₹1.3 LConstruction of CC road from Primary School Dhoadaveer to Chandrajeet Chauhans door in Gram Panchayat Bogna
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249078
₹1.2 L Sanctioned · 15 Oct 2026Rec. 18 Nov 2025Construction work of the boundary wall of the cemetery in Gram Panchayat Dharwan Shekhpur
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Ghazipur· #249323
₹1.2 L Time Estimation · 15 Oct 2026Rec. 19 Nov 2025Construction of CC road from Pitch road to Sanjays house in Gram Panchayat Dhelwa
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249478
₹1.2 L Work partially Completed · 15 Oct 2026Rec. 19 Nov 2025Paid ₹1.2 LConstruction of CC road from Lallan Yadavs house to Bhola Yadavs house in Gram Panchayat Tati
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249512
₹1.2 L Work partially Completed · 15 Oct 2026Rec. 19 Nov 2025Paid ₹1.2 LConstruction of CC road from Ravindra Sharmas house to Tafazzul Ansaris house in Gram Panchayat Phufav
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249485
₹1.2 L Work partially Completed · 25 Sept 2026Rec. 19 Nov 2025Paid ₹1.2 LInstallation of 100 India mark hand pumps in different blocks and villages
Drinking waterInstalling hand pumps· Ghazipur· #249542
₹6.1 L Completed 22 Sept 2026Rec. 19 Nov 2025Paid ₹6.1 LInstallation of 150 india mark II hand pumps in sadar npg sadat manihari devokali jakhnia karanda zamania birno mardah bhadaura saidpur reotipur
Drinking waterInstalling hand pumps· Ghazipur· #251267
₹15.9 L Completed 22 Sept 2026Rec. 29 Nov 2025Paid ₹15.9 LConstruction work of CC road from the pitch road to Subedar Vishwakarmas house in Gram Panchayat Kudil
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249342
₹1.2 L Work partially Completed · 5 Sept 2026Rec. 19 Nov 2025Paid ₹1.2 LConstruction of CC road from pitch road to (Kannaujia Basti) in Gram Panchayat Hariharpur Jujharpur
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249096
₹1.2 L Physical Inspection · 14 Jul 2026Rec. 18 Nov 2025Paid ₹1.2 LConstruction of CC road from Ekram Nai s house near the big mosque in Gram Panchayat Mathara
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249138
₹1.2 L Work partially Completed · 14 Jul 2026Rec. 18 Nov 2025Paid ₹1.2 LConstruction of CC road from the pitch road to Kali Mata temple in Gram Panchayat Adhiyara
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249513
₹1.2 L Physical Inspection · 26 May 2026Rec. 19 Nov 2025Paid ₹1.2 LConstruction of CC road from Arjuns house in Gram Panchayat Sakratali
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249175
₹1.2 L Completed 14 May 2026Rec. 18 Nov 2025Paid ₹1.2 LConstruction of CC road from Jabir house to Noor Sheeds house in Gram Panchayat Mircha Block Zamania
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #251249
₹1.3 L Awaiting sanction · 337 daysRec. 29 Nov 2025Construction work of CC road to the house of Ravindra Sharma in Gram Panchayat Rampur Phupha Block Jamaniya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #251251
₹75,000 Awaiting sanction · 337 daysRec. 29 Nov 2025
17th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 100% | 100% | 296 | 100 |
| 2 | Mahesh Sharma · Gautam Buddha Nagar | 100% | 97% | 88 | 99 |
| 3 | Anurag Sharma · Jhansi | 100% | 100% | 137 | 98 |
| 4 | Seyed Tufail Hasan · Moradabad | 100% | 98% | 188 | 97 |
| 5 | Shri Ajay (Teni) Misra · Kheri | 97% | 97% | 51 | 97 |
| 6 | Shri Kunwar Danish Ali · Amroha | 100% | 97% | 325 | 97 |
| 7 | Kirti Vardhan Singh · Gonda | 96% | 96% | 130 | 96 |
| 8 | Girish Chandra · Nagina | 95% | 95% | 238 | 96 |
| 9 | Shri Lallu Singh · Faizabad | 98% | 94% | 62 | 96 |
| 10 | Shri Shafiqur Rahman Barq · Sambhal | 99% | 97% | 206 | 95 |
| 11 | Rajesh Verma · Sitapur | 100% | 100% | 22 | 95 |
| 12 | Prof SP Singh Baghel · Agra | 100% | 100% | 36 | 95 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.