This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Afzal Ansari

Lok SabhaGhazipur · Uttar Pradesh

MP score38/100529th of 539 in the 17th Lok Sabha
78th of 81 from Uttar Pradesh
Re-elected to the 18th Lok Sabha Then: 91% utilisation, 64 works completed, score 57.
  • Works waiting for sanction

    33 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹1.62 Cr

Median ₹8.60 Cr

Fund utilisation

46%

₹73.8 L recommended · 46 works
Below median (98%)

Paid to vendors

₹33.1 L

20% of allocation
Below median (88%)

Works completed

3

6.5% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP46 works

    ₹73.8 L · 46% of the ₹1.62 Cr allocated

  2. Sanctioned by the district13 works

    28% sanctioned · took 7.4 months on average (due within 45 days)

  3. Completed3 works

    ₹23.3 L final cost · 8.6 months from recommendation on average

33 works are still awaiting sanction, 33 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 46 works worth ₹73.8 L, a fund utilisation of 46%, higher than 0.6% of 17th Lok Sabha MPs.
  • The district has sanctioned 13 of them, taking 7.4 months on average.
  • ₹33.1 L has been paid to vendors, 20% of the allocation.
  • 3 works are complete, typically 8.6 months after recommendation. 3 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 10 vendors. The largest received 67%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 38/100: finishing works counts most

  1. Works completed 30%7Completed ÷ recommended works.
  2. Spending efficiency 20%70Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%46Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%60Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%20Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    Not enough data
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: UP STATE AGRO, 67% of payments across 10 vendors.

District sanction speed

36/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%36Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

46 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • construction of cc road from the pitch road to mohan yadavs house to gram panchayat mahmudpur bauwa

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #325191

    ₹1.3 L Physical Inspection · 31 Oct 2026Rec. 30 Oct 2026Paid ₹1.3 L
  • Construction of CC road from Primary School Dhoadaveer to Chandrajeet Chauhans door in Gram Panchayat Bogna

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249078

    ₹1.2 L Sanctioned · 15 Oct 2026Rec. 18 Nov 2025
  • Construction work of the boundary wall of the cemetery in Gram Panchayat Dharwan Shekhpur

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Ghazipur· #249323

    ₹1.2 L Time Estimation · 15 Oct 2026Rec. 19 Nov 2025
  • Construction of CC road from Pitch road to Sanjays house in Gram Panchayat Dhelwa

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249478

    ₹1.2 L Work partially Completed · 15 Oct 2026Rec. 19 Nov 2025Paid ₹1.2 L
  • Construction of CC road from Lallan Yadavs house to Bhola Yadavs house in Gram Panchayat Tati

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249512

    ₹1.2 L Work partially Completed · 15 Oct 2026Rec. 19 Nov 2025Paid ₹1.2 L
  • Construction of CC road from Ravindra Sharmas house to Tafazzul Ansaris house in Gram Panchayat Phufav

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249485

    ₹1.2 L Work partially Completed · 25 Sept 2026Rec. 19 Nov 2025Paid ₹1.2 L
  • Installation of 100 India mark hand pumps in different blocks and villages

    Drinking waterInstalling hand pumps· Ghazipur· #249542

    ₹6.1 L Completed 22 Sept 2026Rec. 19 Nov 2025Paid ₹6.1 L
  • Installation of 150 india mark II hand pumps in sadar npg sadat manihari devokali jakhnia karanda zamania birno mardah bhadaura saidpur reotipur

    Drinking waterInstalling hand pumps· Ghazipur· #251267

    ₹15.9 L Completed 22 Sept 2026Rec. 29 Nov 2025Paid ₹15.9 L
  • Construction work of CC road from the pitch road to Subedar Vishwakarmas house in Gram Panchayat Kudil

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249342

    ₹1.2 L Work partially Completed · 5 Sept 2026Rec. 19 Nov 2025Paid ₹1.2 L
  • Construction of CC road from pitch road to (Kannaujia Basti) in Gram Panchayat Hariharpur Jujharpur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249096

    ₹1.2 L Physical Inspection · 14 Jul 2026Rec. 18 Nov 2025Paid ₹1.2 L
  • Construction of CC road from Ekram Nai s house near the big mosque in Gram Panchayat Mathara

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249138

    ₹1.2 L Work partially Completed · 14 Jul 2026Rec. 18 Nov 2025Paid ₹1.2 L
  • Construction of CC road from the pitch road to Kali Mata temple in Gram Panchayat Adhiyara

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249513

    ₹1.2 L Physical Inspection · 26 May 2026Rec. 19 Nov 2025Paid ₹1.2 L
  • Construction of CC road from Arjuns house in Gram Panchayat Sakratali

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #249175

    ₹1.2 L Completed 14 May 2026Rec. 18 Nov 2025Paid ₹1.2 L
  • Construction of CC road from Jabir house to Noor Sheeds house in Gram Panchayat Mircha Block Zamania

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #251249

    ₹1.3 L Awaiting sanction · 337 daysRec. 29 Nov 2025
  • Construction work of CC road to the house of Ravindra Sharma in Gram Panchayat Rampur Phupha Block Jamaniya

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #251251

    ₹75,000 Awaiting sanction · 337 daysRec. 29 Nov 2025

17th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi100%100%296100
2Mahesh Sharma · Gautam Buddha Nagar100%97%8899
3Anurag Sharma · Jhansi100%100%13798
4Seyed Tufail Hasan · Moradabad100%98%18897
5Shri Ajay (Teni) Misra · Kheri97%97%5197
6Shri Kunwar Danish Ali · Amroha100%97%32597
7Kirti Vardhan Singh · Gonda96%96%13096
8Girish Chandra · Nagina95%95%23896
9Shri Lallu Singh · Faizabad98%94%6296
10Shri Shafiqur Rahman Barq · Sambhal99%97%20695
11Rajesh Verma · Sitapur100%100%2295
12Prof SP Singh Baghel · Agra100%100%3695

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.