Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Afzal Ansari

Lok SabhaSPGhazipur · Uttar Pradesh

MP score57/100255th of 542 in the 18th Lok Sabha
48th of 80 from Uttar Pradesh
Also an MP in the 17th Lok Sabha Then: 46% utilisation, 3 works completed, score 38.

Allocated limit

₹22.05 Cr

Median ₹14.70 Cr

Fund utilisation

91%

₹20.07 Cr recommended · 417 works
Above median (76%)

Paid to vendors

₹11.27 Cr

51% of allocation
Above median (37%)

Works completed

64

15% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP417 works

    ₹20.07 Cr · 91% of the ₹22.05 Cr allocated

  2. Sanctioned by the district252 works

    60% sanctioned · took 5.3 months on average (due within 45 days)

  3. Completed64 works

    ₹6.07 Cr final cost · 14.7 months from recommendation on average

165 works are still awaiting sanction, 165 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 417 works worth ₹20.07 Cr, a fund utilisation of 91%, higher than 75% of 18th Lok Sabha MPs.
  • The district has sanctioned 252 of them, taking 5.3 months on average.
  • ₹11.27 Cr has been paid to vendors, 51% of the allocation.
  • 64 works are complete, typically 14.7 months after recommendation. 64 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 37 vendors. The largest received 40%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 57/100: finishing works counts most

  1. Works completed 30%15Completed ÷ recommended works.
  2. Spending efficiency 20%54Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%91Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%51Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    75
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SHYAM SOLAR TRADING, 40% of payments across 37 vendors.

District sanction speed

62/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%62Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

417 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of the boundary wall for the public cemetery in Block Revatipur, Village Nagsar Newaju Rai, estimated cost 5 lakh rupees.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Ghazipur· #176281

    ₹3.5 L Completed 18 Oct 2026Rec. 18 Feb 2025Paid ₹3.5 L
  • Construction of CC Road: Kshetr Panchayat Saidpur, Gram Panchayat Mahmoodpur Gajadharpur In Dalit Basti From the main road to Arjun Ram's gate 100 Mtr x 2.40 Mtr x 10 cm Development Agency - Gram Panchayat Mahmoodpur Gajadharpur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #148839

    ₹3.1 L Completed 17 Oct 2026Rec. 21 Oct 2024Paid ₹3.1 L
  • Contruction of cc road from Mohan yadav residence via masjid to anirudh yadav residence

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #200714

    ₹8.0 L Completed 14 Oct 2026Rec. 21 May 2025Paid ₹8.0 L
  • Construction of C.C. Road by R.E.S. Ghazipur in Block Saidpur, Village Phulwari Kala, from Pich Road to Lalchand Yadav house, estimated length 100m x 2.40m x 10cm, proposed cost 4 lakh rupees.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #174044

    ₹4.0 L Completed 8 Oct 2026Rec. 18 Feb 2025Paid ₹4.0 L
  • Construction of a CC road in Block Sadar Ghazipur at Gram Chhawani Line from Pitch Road to Chandan Kushwaha house, estimated length 100m x 2.50m x 10cm, proposed cost 4 lakh rupees.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #176099

    ₹4.0 L Completed 8 Oct 2026Rec. 18 Feb 2025Paid ₹4.0 L
  • Construction of a classroom by School Management in Block Jakhaniya, Village Gaura Khas at Madrasa Muhammad Ali Deeni wa Asri Darul Uloom, Jakhaniya, Ghazipur, estimated cost 7 lakh rupees.

    Education & librariesConstruction of rooms and halls in school and colleges· Ghazipur· #176284

    ₹7.2 L Work partially Completed · 7 Oct 2026Rec. 18 Feb 2025Paid ₹3.7 L
  • Construction of a classroom by School Management in Block Bhadora at Swami Vivekananda Convent High School Inter College, Karahiya, estimated cost 7 lakh rupees.

    Education & librariesConstruction of rooms and halls in school and colleges· Ghazipur· #176286

    ₹7.0 L Sanctioned · 7 Oct 2026Rec. 18 Feb 2025
  • Construction of CC Road: Gram Panchayat Alipur Madra, From Bhudkhuda Manjhanpur marg via Mahendra Yadav's Tubewell to Ramesh Yadav's Residence 150 Mtr x 2.40 Mtr x 10 cm Development Agency - R.E.S Ghazipur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #148748

    ₹6.0 L Completed 3 Oct 2026Rec. 21 Oct 2024Paid ₹6.0 L
  • Construction of C.C. Road by R.E.S Ghazipur in Block Jakhaniya, Village Gourakhas, from Shashikant Ram house to Shyam Lal house, estimated length 150m x 2.50m x 10cm, proposed cost 7 lakh rupees

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #174025

    ₹6.8 L Completed 3 Oct 2026Rec. 18 Feb 2025Paid ₹6.8 L
  • Construction of CC road from Atwaru chauhan residence to Shivbachan Rajbhar residence

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #201004

    ₹6.5 L Completed 25 Sept 2026Rec. 21 May 2025Paid ₹6.5 L
  • Construction of C.C. Road by R.E.S. Ghazipur in Block Zamaniya, Village Jabhurna, from Dildarnagar Karmhari Road to Sudarshan Yadav house via Chhoti Nahar bridge, estimated length 150m x 2.50m x 10cm, proposed cost 7 lakh rupees.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #174038

    ₹6.9 L Completed 23 Sept 2026Rec. 18 Feb 2025Paid ₹6.9 L
  • Construction of C.C. Road by R.E.S. Ghazipur in Block Bhadora, Village Dildarnagar, from Dildarnagar Bhadora Road to Dinesh Yadav house, estimated length 150m x 2.50m x 10cm, proposed cost 7 lakh rupees

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #176051

    ₹7.0 L Completed 23 Sept 2026Rec. 18 Feb 2025Paid ₹7.0 L
  • Construction of C.C. Road by R.E.S. Ghazipur in Block Devkali, Village Dhanaipur, from Kali Mata Mandir to Virender house, estimated length 140m x 2.40m x 10cm, proposed cost 5 lakh rupees

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #176075

    ₹6.9 L Completed 22 Sept 2026Rec. 18 Feb 2025Paid ₹6.9 L
  • Construction of CC Road: Nagar Palika Parihad Ghazipur, From NH 29, Varanasi Main road to Shiv Ram Yadav's Residence 100 Mtr x 2.40 Mtr x 10cm Development Agency - RES Ghaziput

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #148767

    ₹4.0 L Completed 21 Sept 2026Rec. 21 Oct 2024Paid ₹4.0 L
  • Contruction of cc road from doodhnath kushwaha residence to birender kushwaha residence

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #200702

    ₹6.5 L Completed 19 Sept 2026Rec. 21 May 2025Paid ₹6.5 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.