This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Suresh Kodikunnil

Lok SabhaSC seatMavelikkara · Kerala

MP score82/100315th of 539 in the 17th Lok Sabha
16th of 20 from Kerala
Re-elected to the 18th Lok Sabha Then: 78% utilisation, 70 works completed, score 60.

Allocated limit

₹8.23 Cr

Median ₹8.60 Cr

Fund utilisation

96%

₹7.89 Cr recommended · 95 works
About the median

Paid to vendors

₹5.88 Cr

71% of allocation
Below median (88%)

Works completed

74

78% of recommended
Below median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP95 works

    ₹7.89 Cr · 96% of the ₹8.23 Cr allocated

  2. Sanctioned by the district95 works

    100% sanctioned · took 12.6 months on average (due within 45 days)

  3. Completed74 works

    ₹5.36 Cr final cost · 13.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 95 works worth ₹7.89 Cr, a fund utilisation of 96%, higher than 36% of 17th Lok Sabha MPs.
  • The district has sanctioned 95 of them, taking 12.6 months on average.
  • ₹5.88 Cr has been paid to vendors, 71% of the allocation.
  • 74 works are complete, typically 13.9 months after recommendation. 45 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 50 vendors. The largest received 12%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 82/100: finishing works counts most

  1. Works completed 30%78Completed ÷ recommended works.
  2. Spending efficiency 20%91Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%61Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%71Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: M S Communication, 12% of payments across 50 vendors.

District sanction speed

50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

95 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Laptops and accessories to Higher Secondary wing of Kurichi Govt. HSS in Kurichi Gramapanchayath

    OtherLaptop/Computer· Kottayam· #131201

    ₹4.9 L Completed 23 Sept 2026Rec. 16 Mar 2024Paid ₹4.9 L
  • Construction of road from Chapathara mukku to Kunnathu Mattayil thodu (East to Rajesh Bhavanam) in Kidapra North

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kollam· #176409

    ₹10.0 L Completed 27 Mar 2026Rec. 12 Oct 2022Paid ₹10.0 L
  • Construct the road in Chirayakam Devaswom colony (Concreting) in ward III, Thakazhy Grama Panchayath,Champakkulam Block (SC)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Alappuzha· #176382

    ₹5.0 L Completed 10 Mar 2026Rec. 19 Feb 2023Paid ₹5.0 L
  • Self supported tressless roofing to Open Air Auditorium to Marthoma HSS, Valakom in Ummannoor GP

    Community buildings & public spacesConstruction of buildings for community cultural activities· Kollam· #129796

    ₹15.0 L Sanctioned · 12 Jan 2026Rec. 15 Mar 2024
  • Construction of Building for Anganwadi No. 3 in Gandhinagar Division 14, Kottarakkara Municipality

    Education & librariesConstruction of buildings for crèches and anganwadies· Kollam· #176388

    ₹15.0 L Sanctioned · 12 Jan 2026Rec. 14 Feb 2023
  • Construction of Building for Anganwadi No.183 in Panthaplavu Ward, Pattazhi Grama Panchayath

    Education & librariesConstruction of buildings for crèches and anganwadies· Kollam· #127064

    ₹14.7 L Completed 5 Jan 2026Rec. 13 Mar 2024Paid ₹14.7 L
  • Provide Mini Mast Light at Govenda Jetty Junction in Kainakary Grama Panchayath

    Electricity & lightingLighting of public spaces· Alappuzha· #176369

    ₹3.4 L Completed 1 Jan 2026Rec. 6 Oct 2022Paid ₹3.4 L
  • Construction of road from Velikkulam bridge to Thalayattam Palli Road in ward 3,Edathua Grama Panchayath

    Roads & bridgesConstruction of culverts and bridges· Alappuzha· #129620

    ₹9.7 L Completed 20 Dec 2025Rec. 15 Mar 2024Paid ₹9.7 L
  • Construction of Building for Anganawadi in ward 8, Cherumikkad SC Colony Cheriyand Grama Panchayath(sc)

    Education & librariesConstruction of buildings for crèches and anganwadies· Alappuzha· #176368

    ₹20.0 L Vendor Identification · 11 Nov 2025Rec. 10 Jun 2022Paid ₹8.5 L
  • Construction of Building to Health Sub centre in Ward 4, Panayara in Ummannoor GP

    Community buildings & public spacesConstruction of community centers and community halls· Kollam· #176393

    ₹32.4 L Completed 31 Oct 2025Rec. 25 Jan 2023Paid ₹32.4 L
  • Drinking water facility to NSS UPS, Neduvathoor in Neduvathoor Grama Panchayat

    Drinking waterProviding supply pipelines for drinking water· Kollam· #176396

    ₹2.9 L Physical Inspection · 30 Oct 2025Rec. 14 Feb 2023Paid ₹71,574
  • Provide Minimast Karimpankavu Colony in ward 4,Kunnam,Thazhakkara Grama Panchayath(SC)

    Electricity & lightingLighting of public spaces· Alappuzha· #176384

    ₹1.5 L Completed 28 Oct 2025Rec. 6 Feb 2024Paid ₹1.5 L
  • Provide Minimast at Munduchalil Colony ward 5, Thazhakkara Grama Panchyath (SC)

    Electricity & lightingLighting of public spaces· Alappuzha· #176385

    ₹1.4 L Completed 28 Oct 2025Rec. 6 Feb 2024Paid ₹1.4 L
  • Provide minimast light at anjilipady junction in ward 6 thrikkodithanam GP

    Electricity & lightingLighting of public spaces· Kottayam· #176435

    ₹3.3 L Completed 27 Oct 2025Rec. 4 Sep 2023Paid ₹3.3 L
  • Provide minimast light at peedikapady junction in ward 8 thrikkodithanam GP

    Electricity & lightingLighting of public spaces· Kottayam· #176436

    ₹3.3 L Completed 27 Oct 2025Rec. 4 Sep 2023Paid ₹3.3 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.