MPLADS report card · 18th Lok Sabha

Dr Sukanta Majumdar

Lok SabhaBJPBalurghat · West Bengal

MP score58/100231st of 542 in the 18th Lok Sabha
25th of 42 from West Bengal
Also an MP in the 17th Lok Sabha Then: 94% utilisation, 336 works completed, score 95.

Allocated limit

₹15.71 Cr

Median ₹14.70 Cr

Fund utilisation

56%

₹8.73 Cr recommended · 190 works
Below median (76%)

Paid to vendors

₹3.19 Cr

20% of allocation
Below median (37%)

Works completed

54

28% of recommended
About the median

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP190 works

    ₹8.73 Cr · 56% of the ₹15.71 Cr allocated

  2. Sanctioned by the district181 works

    95% sanctioned · took 53 days on average (due within 45 days)

  3. Completed54 works

    ₹2.56 Cr final cost · 17.8 months from recommendation on average

9 works are still awaiting sanction, 5 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 190 works worth ₹8.73 Cr, a fund utilisation of 56%, higher than 17% of 18th Lok Sabha MPs.
  • The district has sanctioned 181 of them, taking 53 days on average.
  • ₹3.19 Cr has been paid to vendors, 20% of the allocation.
  • 54 works are complete, typically 17.8 months after recommendation. 54 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 11 vendors. The largest received 35%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 58/100: finishing works counts most

  1. Works completed 30%28Completed ÷ recommended works.
  2. Spending efficiency 20%80Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%56Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%20Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    81
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BOND CONSTRUCTION, 35% of payments across 11 vendors.

District sanction speed

98/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%98Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

190 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Set up a solar water system at Gobindapur under kalikamora Anchal. Mouza Amlahar, jl no. 142 contact Person Nandan Prasad mobile number 7602037210

    Drinking waterInstalling community drinking water plants· Dakshin Dinajpur· #154847

    ₹3.0 L Completed 6 Oct 2026Rec. 4 Dec 2024Paid ₹3.0 L
  • Construction of 100 M CC road from Haribasar Mandap to Susen Basak house

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshin Dinajpur· #181124

    ₹7.5 L Completed 6 Oct 2026Rec. 12 Mar 2025Paid ₹7.5 L
  • 3 Solar Street Light at Boaldaha from Ayush Basak house to western side link road. Belbari Anchal under Gangarampur.

    Electricity & lightingStreet lights· Dakshin Dinajpur· #187354

    ₹1.0 L Completed 6 Oct 2026Rec. 28 Mar 2025Paid ₹1.0 L
  • Solar High mast Light at Par Patiram Samsan of Dakshin Pal para near River Side

    Electricity & lightingLighting of public spaces· Dakshin Dinajpur· #187881

    ₹5.5 L Completed 6 Oct 2026Rec. 29 Mar 2025Paid ₹5.5 L
  • Construction of rest room with solar light and solar high mast light at Choto Deora near Kasiadanga village.

    Community buildings & public spacesCrematoriums / Energy efficient crematoriums or structures on burial / cremation ground· Dakshin Dinajpur· #188863

    ₹7.5 L Completed 6 Oct 2026Rec. 3 Apr 2025Paid ₹7.5 L
  • Solar highmast Light

    Electricity & lightingLighting of public spaces· Dakshin Dinajpur· #231655

    ₹3.8 L Completed 6 Oct 2026Rec. 6 Sep 2025Paid ₹3.8 L
  • Solar highmast Light

    Electricity & lightingLighting of public spaces· Dakshin Dinajpur· #231656

    ₹3.8 L Completed 6 Oct 2026Rec. 6 Sep 2025Paid ₹3.8 L
  • Solar High Mast Light

    Electricity & lightingLighting of public spaces· Dakshin Dinajpur· #233745

    ₹3.8 L Completed 6 Oct 2026Rec. 14 Sep 2025Paid ₹3.8 L
  • Construction of PCC Road from Dulal Roy house to Lalmohan Roy house at Balapukur under Akcha Grampanchyat.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshin Dinajpur· #320111

    ₹7.5 L Awaiting sanction · 27 daysRec. 5 Oct 2026
  • Solar highmast

    Electricity & lightingLighting of public spaces· Dakshin Dinajpur· #320112

    ₹2.9 L Awaiting sanction · 27 daysRec. 5 Oct 2026
  • Solar highmast

    Electricity & lightingLighting of public spaces· Dakshin Dinajpur· #320113

    ₹2.9 L Awaiting sanction · 27 daysRec. 5 Oct 2026
  • Solar highmast

    Electricity & lightingLighting of public spaces· Dakshin Dinajpur· #320114

    ₹2.9 L Awaiting sanction · 27 daysRec. 5 Oct 2026
  • 200 Meter CC road from Manik Pradhan Pond to horipur PNG

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Uttar Dinajpur· #226418

    ₹8.0 L Sanctioned · 25 Sept 2026Rec. 12 Aug 2025
  • Construction of cc road 50mt at Sosha from horibola nuniya house to behari nuniya house under shirshi gp of Harirampur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshin Dinajpur· #156319

    ₹1.7 L Completed 21 Sept 2026Rec. 4 Dec 2024Paid ₹1.7 L
  • Construction of cc road 60mt at muskipur bazar high road to sadhihar afjalpur Das para horimandir. Under Gokarna gp

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Dakshin Dinajpur· #156320

    ₹2.0 L Completed 21 Sept 2026Rec. 4 Dec 2024Paid ₹2.0 L

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.