Payments concentrated with one vendor
67% of vendor payments went to MA ENTERPRISE.
Allocated limit
₹4.90 Cr
Median ₹14.70 Cr
Fund utilisation
81%
₹3.98 Cr recommended · 23 works
Above median (76%)
Paid to vendors
₹3.36 Cr
69% of allocation
Above median (37%)
Works completed
10
43% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP23 works
₹3.98 Cr · 81% of the ₹4.90 Cr allocated
- Sanctioned by the district18 works
78% sanctioned · took 9.7 months on average (due within 45 days)
- Completed10 works
₹2.21 Cr final cost · 14.8 months from recommendation on average
5 works are still awaiting sanction, 5 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 23 works worth ₹3.98 Cr, a fund utilisation of 81%, higher than 59% of 18th Lok Sabha MPs.
- The district has sanctioned 18 of them, taking 9.7 months on average.
- ₹3.36 Cr has been paid to vendors, 69% of the allocation.
- 10 works are complete, typically 14.8 months after recommendation. 9 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Drinking water.
- Payments went to 11 vendors. The largest received 67%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 63/100: finishing works counts most
- Works completed 30%43Completed ÷ recommended works.
- Spending efficiency 20%66Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%81Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%90Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%69Paid to vendors ÷ allocated limit.
- Vendor diversity 10%41How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MA ENTERPRISE, 67% of payments across 11 vendors.
District sanction speed
50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
23 works · tap “Photos” to see geo-tagged photos from eSAKSHI
Installation of 10 nos. (sl. no.21 to 28) Arsenic Free water tank under Ghoraas Kulingram G.P and Basirhat II P.S
Drinking waterInstalling tube-wells and borewells· North 24 Parganas· #135269
₹28.0 L Completed 12 Sept 2026Rec. 9 Aug 2024Paid ₹28.0 LInstallation of 7nos. of Eletric street light under Ghorarash Kulingram G.P & Basirhat II Panchayat Samity. (Sl No.-16 to 22)
Electricity & lightingStreet lights· North 24 Parganas· #142044
₹24.2 L Completed 12 Sept 2026Rec. 20 Sep 2024Paid ₹24.2 LInstallation of 10 nos. (sl.no. 1 to 10) Arsenic Free electric based water tank under Falti Beloiaghata G.P and Barasat II P.S
Drinking waterInstalling tube-wells and borewells· North 24 Parganas· #135267
₹34.9 L Completed 2 Sept 2026Rec. 9 Aug 2024Paid ₹34.9 LInstallation of 5 nos. Arsenic Free Water Tank at different places under Hasnabad Block (SL.No. 1 to 5)
Drinking waterConstruction of water tanks· North 24 Parganas· #139002
₹17.5 L Completed 27 Aug 2026Rec. 5 Sep 2024Paid ₹17.5 LInstallation of 12 miters Highmast Light with with 6nos. IP65 Flood light with high power Led at Jadurhati Beltala More under Jadurhati Dakshin G.P & Baduria Panchayat Samity (SL.No.- 37).
Electricity & lightingStreet lights· North 24 Parganas· #140435
₹5.0 L Physical Inspection · 14 Aug 2026Rec. 12 Sep 2024Paid ₹5.0 LInstallation of 14 nos. Arsenic Free Water Tank, Street Light, etc at different places under Hingalganj Block (SL.No. 19 to 32)
Drinking waterConstruction of water tanks· North 24 Parganas· #139022
₹27.6 L Work partially Completed · 8 Jul 2026Rec. 5 Sep 2024Paid ₹13.6 LDevelopment and beautification of Dilip Kumar Memorial Institution Play Ground under Baduria Municipality (SL.No.- 34).
Sports & fitnessDevelopment of playground· North 24 Parganas· #140437
₹10.0 L Physical Inspection · 23 Jun 2026Rec. 12 Sep 2024Paid ₹10.0 LInstallation of 12 miters Highmast Light with 6nos. IP65 Flood light with high power LED at Jora Ashathatala under Jagannathpur G.P and Baduria Panchayet Samity (SL. No-35).
Electricity & lightingStreet lights· North 24 Parganas· #140433
₹5.0 L Vendor Identification · 6 Mar 2026Rec. 12 Sep 2024Paid ₹5.0 LInstallation of 3nos. Eletric based water tank and street solar light under Srinagar Matia G.P & Basirhat II Panchayat Samity. (Sl No.-5 to 7)
Drinking waterConstruction of water tanks· North 24 Parganas· #142039
₹26.6 L Vendor Identification · 27 Feb 2026Rec. 20 Sep 2024Paid ₹26.4 LInstallation of 12 miters Highmast Light with with 6nos. IP65 Flood light with high power Led at Narayanapur Bazar under Jadurhati Uttar G.P & Baduria Panchayat Samity (SL.No.- 38).
Electricity & lightingStreet lights· North 24 Parganas· #140436
₹5.0 L Completed 3 Nov 2025Rec. 12 Sep 2024Paid ₹5.0 LInstallation of 20 nos. of Electric street LED Light at different places at Atpukur G.P under Minakhan Panchayat Samity (SL.No- 42)
Electricity & lightingStreet lights· North 24 Parganas· #141761
₹4.4 L Completed 22 Aug 2025Rec. 19 Sep 2024Paid ₹4.4 LInstallation of 100 pcs. Street Electric Light under Nimdaria Kodalia G.P (Sl.No-18)
Electricity & lightingStreet lights· North 24 Parganas· #139010
₹21.8 L Completed 31 Jul 2025Rec. 5 Sep 2024Paid ₹21.8 LInstallation of 33 nos. Electric Street LED Light at different places at Khasbalanda G.P under Haroa Block (SLNo. 44)
Electricity & lightingStreet lights· North 24 Parganas· #139057
₹7.3 L Completed 17 Jun 2025Rec. 5 Sep 2024Paid ₹7.3 LInstallation of 4nos. Eletric based water tank under Sangrampur Shibhati G.P & Basirhat I Panchayat Samity. (Sl No.-1 to 4)
Drinking waterConstruction of water tanks· North 24 Parganas· #142038
₹14.0 L Vendor Identification · 26 Mar 2025Rec. 20 Sep 2024Paid ₹13.9 LInstallation of 7nos. of Eletric street light under Kachua G.P & Basirhat II Panchayat Samity. (Sl No.-23 to 27)
Electricity & lightingStreet lights· North 24 Parganas· #142045
₹17.3 L Vendor Identification · 28 Jan 2025Rec. 20 Sep 2024Paid ₹17.2 L
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.