Allocated limit
₹15.45 Cr
Median ₹14.70 Cr
Fund utilisation
76%
₹11.74 Cr recommended · 46 works
About the median
Paid to vendors
₹7.36 Cr
48% of allocation
Above median (37%)
Works completed
18
39% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP46 works
₹11.74 Cr · 76% of the ₹15.45 Cr allocated
- Sanctioned by the district27 works
59% sanctioned · took 2.6 months on average (due within 45 days)
- Completed18 works
₹6.35 Cr final cost · 14.3 months from recommendation on average
19 works are still awaiting sanction, 10 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 46 works worth ₹11.74 Cr, a fund utilisation of 76%, higher than 50% of 18th Lok Sabha MPs.
- The district has sanctioned 27 of them, taking 2.6 months on average.
- ₹7.36 Cr has been paid to vendors, 48% of the allocation.
- 18 works are complete, typically 14.3 months after recommendation. 18 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 10 vendors. The largest received 33%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 69/100: finishing works counts most
- Works completed 30%39Completed ÷ recommended works.
- Spending efficiency 20%86Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%76Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%48Paid to vendors ÷ allocated limit.
- Vendor diversity 10%84How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: TECHNO BEST, 33% of payments across 10 vendors.
District sanction speed
84/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%84Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
46 works · tap “Photos” to see geo-tagged photos from eSAKSHI
Supply & Installation of 10 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under Asansol Municipal Corporation within Paschim Bardhaman District
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317854
₹30.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supply & Installation of 08 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under Jamuria P.S. within Paschim Bardhaman District
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317866
₹24.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supply & Installation of 04 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under Jamuria P.S. within Paschim Bardhaman District
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317870
₹12.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supply & Installation of 03 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box & All Necessary Accessories Complete Set Up under Raniganj P.S. within Paschim Bardhaman district
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317871
₹9.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supplying, Installation, Fitting & Fixing of 10 Units of 6.00 Mtr. Octagonal Pole Electric Street Light
Electricity & lightingStreet lights· Paschim Bardhaman· #317885
₹5.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supplying, Installation, Fitting & Fixing of 10 Units of 6.00 Mtr. Octagonal Pole Electric Street Light
Electricity & lightingStreet lights· Paschim Bardhaman· #317886
₹5.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supply & Installation of 03 Units of 9.00 Mtr. High Mast Tower Lighting System With 04 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under A.M.C. within Paschim Bardhaman district
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317887
₹6.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supply & Installation of 03 Units of 9.00 Mtr. High Mast Tower Lighting System With 04 Nos. 150 Watt LED Flood Light including Feeder Pillar Box & All Necessary Accessories Complete Set Up within Jamuria and Raniganj P.S. under Paschim Bardhaman district
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317888
₹6.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supply & Installation of 1 Unit of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box & All Necessary Accessories Complete Set Up
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317889
₹3.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026Supply and Installation of 17 nos 12 mtr. Electric high mast light at different places within Pandaveswar P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189521
₹81.9 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹81.9 LSupply and Installation of 5 nos 12 mtr. Electric high mast light at different places within Pandaveswar P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189522
₹24.1 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹24.1 LSupply and Installation of 10 nos 12 mtr. Electric high mast light at different places within Jamuria-I and Jamuria-II P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189523
₹48.2 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹48.2 LSupply and Installation of 5 nos 12 mtr. Electric high mast light at different places within Asansol Municipal Corporation (AMC) under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189524
₹24.1 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹24.1 LSupply and Installation of 4 nos 12 mtr. Electric high mast light at different places within Jamuria P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)
Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189525
₹19.3 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹19.3 LSupply and Installation of Electric Street Lights (70 Nos.)
Electricity & lightingStreet lights· Paschim Bardhaman· #209066
₹53.9 L Completed 5 Sept 2026Rec. 15 Jun 2025Paid ₹53.9 L
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.