Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Shatrughan Sinha

Lok SabhaAITCAsansol · West Bengal

MP score69/100107th of 542 in the 18th Lok Sabha
18th of 42 from West Bengal
Also an MP in the 17th Lok Sabha Then: 96% utilisation, 64 works completed, score 89.

Allocated limit

₹15.45 Cr

Median ₹14.70 Cr

Fund utilisation

76%

₹11.74 Cr recommended · 46 works
About the median

Paid to vendors

₹7.36 Cr

48% of allocation
Above median (37%)

Works completed

18

39% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP46 works

    ₹11.74 Cr · 76% of the ₹15.45 Cr allocated

  2. Sanctioned by the district27 works

    59% sanctioned · took 2.6 months on average (due within 45 days)

  3. Completed18 works

    ₹6.35 Cr final cost · 14.3 months from recommendation on average

19 works are still awaiting sanction, 10 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 46 works worth ₹11.74 Cr, a fund utilisation of 76%, higher than 50% of 18th Lok Sabha MPs.
  • The district has sanctioned 27 of them, taking 2.6 months on average.
  • ₹7.36 Cr has been paid to vendors, 48% of the allocation.
  • 18 works are complete, typically 14.3 months after recommendation. 18 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 10 vendors. The largest received 33%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 69/100: finishing works counts most

  1. Works completed 30%39Completed ÷ recommended works.
  2. Spending efficiency 20%86Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%76Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%48Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    84
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: TECHNO BEST, 33% of payments across 10 vendors.

District sanction speed

84/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%84Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

46 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Supply & Installation of 10 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under Asansol Municipal Corporation within Paschim Bardhaman District

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317854

    ₹30.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supply & Installation of 08 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under Jamuria P.S. within Paschim Bardhaman District

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317866

    ₹24.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supply & Installation of 04 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under Jamuria P.S. within Paschim Bardhaman District

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317870

    ₹12.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supply & Installation of 03 Units of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box & All Necessary Accessories Complete Set Up under Raniganj P.S. within Paschim Bardhaman district

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317871

    ₹9.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supplying, Installation, Fitting & Fixing of 10 Units of 6.00 Mtr. Octagonal Pole Electric Street Light

    Electricity & lightingStreet lights· Paschim Bardhaman· #317885

    ₹5.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supplying, Installation, Fitting & Fixing of 10 Units of 6.00 Mtr. Octagonal Pole Electric Street Light

    Electricity & lightingStreet lights· Paschim Bardhaman· #317886

    ₹5.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supply & Installation of 03 Units of 9.00 Mtr. High Mast Tower Lighting System With 04 Nos. 150 Watt LED Flood Light including Feeder Pillar Box and All Necessary Accessories Complete Set Up under A.M.C. within Paschim Bardhaman district

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317887

    ₹6.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supply & Installation of 03 Units of 9.00 Mtr. High Mast Tower Lighting System With 04 Nos. 150 Watt LED Flood Light including Feeder Pillar Box & All Necessary Accessories Complete Set Up within Jamuria and Raniganj P.S. under Paschim Bardhaman district

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317888

    ₹6.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supply & Installation of 1 Unit of 10.00 Mtr. High Mast Tower Lighting System With 06 Nos. 150 Watt LED Flood Light including Feeder Pillar Box & All Necessary Accessories Complete Set Up

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #317889

    ₹3.0 L Awaiting sanction · 38 daysRec. 24 Sep 2026
  • Supply and Installation of 17 nos 12 mtr. Electric high mast light at different places within Pandaveswar P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189521

    ₹81.9 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹81.9 L
  • Supply and Installation of 5 nos 12 mtr. Electric high mast light at different places within Pandaveswar P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189522

    ₹24.1 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹24.1 L
  • Supply and Installation of 10 nos 12 mtr. Electric high mast light at different places within Jamuria-I and Jamuria-II P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189523

    ₹48.2 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹48.2 L
  • Supply and Installation of 5 nos 12 mtr. Electric high mast light at different places within Asansol Municipal Corporation (AMC) under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189524

    ₹24.1 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹24.1 L
  • Supply and Installation of 4 nos 12 mtr. Electric high mast light at different places within Jamuria P.S. under Paschim Bardhaman District (Each Light cost Rs. 4.82 Lac)

    Electricity & lightingLighting of public spaces· Paschim Bardhaman· #189525

    ₹19.3 L Completed 5 Sept 2026Rec. 7 Apr 2025Paid ₹19.3 L
  • Supply and Installation of Electric Street Lights (70 Nos.)

    Electricity & lightingStreet lights· Paschim Bardhaman· #209066

    ₹53.9 L Completed 5 Sept 2026Rec. 15 Jun 2025Paid ₹53.9 L

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.