Allocated limit
₹15.04 Cr
Median ₹14.70 Cr
Fund utilisation
57%
₹8.53 Cr recommended · 214 works
Below median (76%)
Paid to vendors
₹5.29 Cr
35% of allocation
About the median
Works completed
120
56% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP214 works
₹8.53 Cr · 57% of the ₹15.04 Cr allocated
- Sanctioned by the district210 works
98% sanctioned · took 3.0 months on average (due within 45 days)
- Completed120 works
₹4.34 Cr final cost · 8.1 months from recommendation on average
4 works are still awaiting sanction, 4 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 214 works worth ₹8.53 Cr, a fund utilisation of 57%, higher than 18% of 18th Lok Sabha MPs.
- The district has sanctioned 210 of them, taking 3.0 months on average.
- ₹5.29 Cr has been paid to vendors, 35% of the allocation.
- 120 works are complete, typically 8.1 months after recommendation. 107 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 46 vendors. The largest received 13%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 69/100: finishing works counts most
- Works completed 30%56Completed ÷ recommended works.
- Spending efficiency 20%82Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%57Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%89Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%35Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: JAYANTA ELECTRIC AND CO, 13% of payments across 46 vendors.
District sanction speed
92/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%92Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
214 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
CONSTRUCTION OF CC ROAD WITH SIDELINE PILING FROM KAZI TAJU NURSING HOME TO CHAKBERIA NASKAR PARA IN KALIKAPUR I GP UNDER SONARPUR DAKSHIN AC LENGTH - 450 MTR
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #156541
₹10.7 L Completed 24 Sept 2026Rec. 24 Dec 2024Paid ₹10.7 LUPGRADATION OF EXISTING BLACK TOP ROAD AND CONCRETE ROAD FROM DK BADEHOOGHLY TO CHOWHATI BORDER UNDER POLEGHAT GP UNDER SONARPUR DAKSHIN AC LENGTH - 800 MTR
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #158035
₹9.8 L Completed 24 Sept 2026Rec. 24 Dec 2024Paid ₹9.8 LINSTALLATION OF 255 NOS OF 60 WATT LED STREET LIGHT WITH FITTINGS IN THE FOLLOWING LOCATIONS OF SOUTH GARIA GP UNDER BARUIPUR BLOCK UNDER BARUIPUR PURBA AC
Electricity & lightingLighting of public spaces· South 24 Parganas· #182671
₹4.1 L Completed 10 Sept 2026Rec. 19 Mar 2025Paid ₹4.1 LINSTALLATION OF 285 NOS OF 60 WATT LED STREET LIGHT WITH FITTINGS IN THE FOLLOWING LOCATIONS OF BEGAMPUR GP UNDER BARUIPUR BLOCK UNDER BARUIPUR PURBA AC
Electricity & lightingLighting of public spaces· South 24 Parganas· #183885
₹4.6 L Completed 10 Sept 2026Rec. 19 Mar 2025Paid ₹4.6 LCONSTRUCTION OF CEMENT CONCRETE ROAD FROM POULTRY OF KESHABPUR SARDAR TO HO RATAN SARDAR UNDER SANKARPUR II GP UNDER BARUIPUR PASCHIM AC
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #241723
₹3.5 L Completed 9 Sept 2026Rec. 21 Dec 2025Paid ₹3.5 LCONSTRUCTION OF CEMENT CONCRETE ROAD FROM KUMARHAT POST OFFICE TO HO MAHIM GAZI IN VILL KUMARHAT UNDER DHAPDHAPI I GP UNDER BARUIPUR PASCHIM AC
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #241730
₹5.0 L Sanctioned · 2 Sept 2026Rec. 21 Dec 2025SUPPLY AND INSTALLATION OF 20 NOS 7 METRES LONG SWAGGED STEEL TUBULAR POLE WITH 1 NO OF 100 WATT LED STREET LIGHT FROM NALMURI HOSPITAL TOWARDS PRANGANJ PANCHAYAT OFFICE UNDER PRANGANJ GP UNDER BHANGAR I PS UNDER BHANGAR AC
Electricity & lightingStreet lights· South 24 Parganas· #269364
₹8.0 L Completed 31 Aug 2026Rec. 18 Feb 2026Paid ₹8.0 LSUPPLY AND INSTALLATION OF 20 NOS 7 METRES LONG SWAGGED STEEL TUBULAR POLE WITH 1 NO OF 100 WATT LED STREET LIGHT FROM BALIGADA MAIN ROAD TOWARDS NARAYANPUR OLD HIGH SCHOOL UNDER NARAYANPUR GP UNDER BHANGAR I PS UNDER BHANGAR AC
Electricity & lightingStreet lights· South 24 Parganas· #269365
₹8.0 L Completed 31 Aug 2026Rec. 18 Feb 2026Paid ₹8.0 LCONSTRUCTION OF CEMENT CONCRETE ROAD WITH PILING WORK FROM TONGTOLA PETROL PUMP TO HO PALANI GHARAMI UNDER KALYANPUR GP UNDER BARUIPUR PASCHIM AC
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #241726
₹18.4 L Work partially Completed · 29 Jul 2026Rec. 21 Dec 2025Paid ₹18.4 LCONSTRUCTION OF CEMENT CONCRETE ROAD FROM HO PANCHANAN SARDAR TO HO PRATIMA HALDER VIA HO LAB SARDAR IN VILL MADHYA INDRAPALA UNDER SIKHARBALI II GP UNDER BARUIPUR PASCHIM AC
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #241728
₹3.0 L Work partially Completed · 29 Jul 2026Rec. 21 Dec 2025Paid ₹2.6 LCONSTRUCTION OF CEMENT CONCRETE ROAD FROM HO RAJU DAS TO HO GOPINATH DAS VIA HO PANCHU DAS IN VILL BAGDA UNDER SIKHARBALI II GP UNDER BARUIPUR PASCHIM AC
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #241729
₹1.0 L Work partially Completed · 29 Jul 2026Rec. 21 Dec 2025Paid ₹1.0 LSUPPLY AND INSTALLATION OF 3 NOS ELECTRIC MINIMAST LIGHT WITH 9 Mtr HEXAGONAL POLE AND 4 NOS OF 150 WATT LED FLOOD LIGHT UNDER SOUTH GARIA GP UNDER BARUIPUR PURBA AC IN THE FOLLOWING LOCATIONS (ATTACHED)
Electricity & lightingStreet lights· South 24 Parganas· #251526
₹3.9 L Sanctioned · 29 Jul 2026Rec. 21 Dec 2025SUPPLY AND INSTALLATION OF 4 NOS ELECTRIC MINIMAST LIGHT WITH 9Mtr HEXAGONAL POLE AND 4 NOS OF 150 WATT LED FLOOD LIGHT UNDER CHAMPAHATI GP UNDER BARUIPUR PURBA AC IN THE FOLLOWING LOCATIONS
Electricity & lightingStreet lights· South 24 Parganas· #251534
₹5.2 L Sanctioned · 29 Jul 2026Rec. 21 Dec 2025SUPPLY AND INSTALLATION OF 3 NOS ELECTRIC MINIMAST LIGHT WITH 9Mtr HEXAGONAL POLE AND 4 NOS OF 150 WATT LED FLOOD LIGHT UNDER BEGAMPUR GP UNDER BARUIPUR PURBA AC IN THE FOLLOWING LOCATIONS
Electricity & lightingStreet lights· South 24 Parganas· #251535
₹3.9 L Sanctioned · 29 Jul 2026Rec. 21 Dec 2025SUPPLY AND INSTALLATION OF 5 NOS ELECTRIC MINIMAST LIGHT WITH 9Mtr HEXAGONAL POLE AND 4 NOS OF 150 WATT LED FLOOD LIGHT UNDER RAMNAGAR I GP UNDER BARUIPUR PURBA AC IN THE FOLLOWING LOCATIONS
Electricity & lightingStreet lights· South 24 Parganas· #251536
₹6.5 L Sanctioned · 29 Jul 2026Rec. 21 Dec 2025
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.