Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Rachna Banerjee

Lok SabhaAITCHooghly · West Bengal

MP score69/100101st of 542 in the 18th Lok Sabha
15th of 42 from West Bengal

Allocated limit

₹14.74 Cr

Median ₹14.70 Cr

Fund utilisation

74%

₹10.93 Cr recommended · 108 works
About the median

Paid to vendors

₹4.14 Cr

28% of allocation
Below median (37%)

Works completed

50

46% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP108 works

    ₹10.93 Cr · 74% of the ₹14.74 Cr allocated

  2. Sanctioned by the district89 works

    82% sanctioned · took 5.6 months on average (due within 45 days)

  3. Completed50 works

    ₹3.35 Cr final cost · 12.3 months from recommendation on average

19 works are still awaiting sanction, 1 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 108 works worth ₹10.93 Cr, a fund utilisation of 74%, higher than 47% of 18th Lok Sabha MPs.
  • The district has sanctioned 89 of them, taking 5.6 months on average.
  • ₹4.14 Cr has been paid to vendors, 28% of the allocation.
  • 50 works are complete, typically 12.3 months after recommendation. 50 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 24 vendors. The largest received 18%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 69/100: finishing works counts most

  1. Works completed 30%46Completed ÷ recommended works.
  2. Spending efficiency 20%81Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%74Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%28Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MAA KALI BUILDERS, 18% of payments across 24 vendors.

District sanction speed

80/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%80Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

108 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Supply and installation of 12.5 meter and 1200 watt LED based eletric high mast lighting system with complete set.

    Electricity & lightingStreet lights· Hooghly· #317840

    ₹11.4 L Sanctioned · 29 Oct 2026Rec. 28 Sep 2026
  • Supply and installation of 12.5 meter and 1200 watt LED based eletric high mast lighting system with complete set.

    Electricity & lightingStreet lights· Hooghly· #317851

    ₹8.5 L Sanctioned · 29 Oct 2026Rec. 28 Sep 2026
  • Construction of concrete Road at following locations

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #317853

    ₹2.9 L Sanctioned · 29 Oct 2026Rec. 28 Sep 2026
  • Constructions of smart class room at Komdhara Muthurkur High School, Between 500 - 700 sq ft. Including all modification instruments facilities.

    Education & librariesConstruction of rooms and halls in school and colleges· Hooghly· #227043

    ₹16.1 L Sanctioned · 12 Oct 2026Rec. 14 Aug 2025
  • Constructions of smart class room at Sugandhya High School, Between 500 - 700 sq ft. Including all modification instruments facilities.

    Education & librariesConstruction of rooms and halls in school and colleges· Hooghly· #227044

    ₹12.5 L Sanctioned · 12 Oct 2026Rec. 14 Aug 2025
  • Constructions of smart class room at Rajhat High School, Between 500 - 700 sq ft. Including all modification instruments facilities.

    Education & librariesConstruction of rooms and halls in school and colleges· Hooghly· #227045

    ₹12.2 L Sanctioned · 12 Oct 2026Rec. 14 Aug 2025
  • Solar Powered standalone community Iron and heavy Metals filtration Plant with NSF 372 and 61 and CSIR, BARC Certified water Purification system with cooler and Remote monitoring, control system and auto back wash facility.

    Drinking waterInstalling community drinking water plants· Hooghly· #232806

    ₹13.6 L Sanctioned · 12 Oct 2026Rec. 11 Sep 2025
  • Solar Power Stand alone community iron and heavy meals filtration plant with NSF 372 and 61 and CSIR, BARC certified water purification system with cooler and remote monitoring control system and auto back wash facility.

    Drinking waterInstalling community drinking water plants· Hooghly· #243611

    ₹13.6 L Sanctioned · 12 Oct 2026Rec. 24 Oct 2025
  • Development of Pond and Surrounding Ares through Renovation, Beautification and infrastructure upgrade including installation of water Treatment Plant (WTP), Sewage Treatment Plant (STP), Seating Capacity, Vehicle Parking, Boundary Wall, Approach Road and Land Levelling.

    HealthConstruction of rooms and facilities for hospitals, FWC , PHC Centers and ANM centers· Hooghly· #250093

    ₹69.7 L Sanctioned · 12 Oct 2026Rec. 23 Nov 2025
  • Construction of Smart Class Room at Goswami Malipara Girls High School between 500-700 sq. ft including all modification instruments facilities.

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Hooghly· #250094

    ₹10.0 L Sanctioned · 12 Oct 2026Rec. 23 Nov 2025
  • Construction of Smart Class Room at Simlagarh Bhitashin Girls High School between 450-550 sq. ft including all modification instruments facilities.

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Hooghly· #259018

    ₹12.7 L Sanctioned · 12 Oct 2026Rec. 13 Jan 2026
  • Construction of Smart Class Room at Jair High School between 450-550 sq. ft including all modification instruments facilities.

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Hooghly· #268157

    ₹13.0 L Sanctioned · 12 Oct 2026Rec. 13 Feb 2026
  • Construction of Concrete Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #242129

    ₹4.0 L Sanctioned · 5 Oct 2026Rec. 14 Oct 2025
  • Construction of Concrete Road with piling.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Hooghly· #242131

    ₹3.5 L Sanctioned · 5 Oct 2026Rec. 14 Oct 2025
  • Construction of Pucca Drain.

    Sanitation & drainageProviding drains and gutters for public drainage· Hooghly· #230384

    ₹2.0 L Completed 1 Oct 2026Rec. 30 Aug 2025Paid ₹2.0 L

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.