MPLADS report card · 18th Lok Sabha

Partha Bhowmick

Lok SabhaAITCBarrackpur · West Bengal

MP score44/100419th of 542 in the 18th Lok Sabha
40th of 42 from West Bengal
  • Works waiting for sanction

    19 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

96%

₹14.13 Cr recommended · 32 works
Above median (76%)

Paid to vendors

₹3.94 Cr

27% of allocation
Below median (37%)

Works completed

4

13% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP32 works

    ₹14.13 Cr · 96% of the ₹14.70 Cr allocated

  2. Sanctioned by the district13 works

    41% sanctioned · took 9.7 months on average (due within 45 days)

  3. Completed4 works

    ₹65.6 L final cost · 10.9 months from recommendation on average

19 works are still awaiting sanction, 19 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 32 works worth ₹14.13 Cr, a fund utilisation of 96%, higher than 84% of 18th Lok Sabha MPs.
  • The district has sanctioned 13 of them, taking 9.7 months on average.
  • ₹3.94 Cr has been paid to vendors, 27% of the allocation.
  • 4 works are complete, typically 10.9 months after recommendation. 4 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Sports & fitness.
  • Payments went to 11 vendors. The largest received 38%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 44/100: finishing works counts most

  1. Works completed 30%13Completed ÷ recommended works.
  2. Spending efficiency 20%17Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%80Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%27Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    77
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: UNITECH INSULATION, 38% of payments across 11 vendors.

District sanction speed

31/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%31Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

32 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Development of Oikatan Mancha underNaihati Municipality

    Education & librariesConstruction of public libraries and reading rooms· North 24 Parganas· #226808

    ₹25.0 L Sanctioned · 29 Sept 2026Rec. 13 Aug 2025
  • Development of Nebadhai Play Ground under Kashimpur GP, Barasat - I Dev. Block

    Sports & fitnessDevelopment of playfields and sports grounds· North 24 Parganas· #212373

    ₹72.3 L Work partially Completed · 8 Sept 2026Rec. 25 Jun 2025Paid ₹18.1 L
  • Development of Bituminious Road at Old Calcutta Road starting from 14 no. Railway to Boro Pole , wARD nO. 9,10 11 12 LENGTH - 1150 mtrs, WIDTH 7 mtrs under Barrackpore Municipality.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #226809

    ₹50.0 L Sanctioned · 1 Sept 2026Rec. 13 Aug 2025
  • Purchase of Hospital Equipments for Dr. B.N Bose Sub Divisional Hospital Barrackpore (IA - Rogi Kalyan Samity Dr. B.N Bose Sub Divisional Hospital Barrackpore)

    HealthPurchase of hospital equipment· North 24 Parganas· #246167

    ₹8.0 L Completed 14 Aug 2026Rec. 4 Nov 2025Paid ₹8.0 L
  • Supply & Commissioning of Stadium LED fittings with feeder cable including installation at Naihati Football stadium under Naihati Municipality

    Sports & fitnessDevelopment of playfields and sports grounds· North 24 Parganas· #295391

    ₹1.90 Cr Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Supply & Commissioning of Stadium LED fittings, feeder, panel box at Naihati Football Stadium under Naihati Municipality (IA - Naihati Municipality)

    Sports & fitnessDevelopment of playfields and sports grounds· North 24 Parganas· #295392

    ₹9.9 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Repair and Removation of the Roof of Naihati Atheletic Club, including Replacement of Existing Asbestos Cement (AC) roofing sheet with Aluminium Roofing sheets and Alling works, in ward no. 25 under Naihati Municipality (IA- Naihati Municipality)

    Community buildings & public spacesConstruction of community centers and community halls· North 24 Parganas· #295393

    ₹9.9 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Construction of a Stadium and Lighting Arrangement at Ramprasad Playground, 08 under Halisahar Municipality (IA - Halisahar Municipality)

    Sports & fitnessDevelopment of playfields and sports grounds· North 24 Parganas· #295405

    ₹60.0 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Construction of a New Gallery at Jonepur Playground, Ward No. 04 under Kancharapara Municipality

    Sports & fitnessDevelopment of playfields and sports grounds· North 24 Parganas· #295406

    ₹60.0 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Development of Road and Drain from the residence of Shri Sukanta Hazra to the Residence of Rakesh Ojha at Green Park, Ward No. 24 under Barrackpore Municipality (IA - DM N24 Parganas)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #295443

    ₹12.0 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Development of Road & Drainage system from the Maharaj House to the Main Road at Green Park , Ward No. 24, under Barrackpore Municipality (IA DM N 24 Pargasnas)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #295444

    ₹22.1 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Construction of a Toilet Block (Latrine) at Greeen Park, Ward No. 24, under Barrackpore Municipality(IA - DM N 24 PGS)

    Sanitation & drainageConstruction of public toilets and bathrooms· North 24 Parganas· #295445

    ₹7.0 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Repair/Recarpeting of ROAD AT Sadar Bazar (Civil Area) (IA - CEO Barrackpore Cantonment Board)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #295446

    ₹45.0 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Repair/Recarpeting of Road at Oderly Bazar (Civil Area) (IA - CEO Cantonement Board Barrackpore)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· North 24 Parganas· #295447

    ₹39.9 L Awaiting sanction · 109 daysRec. 15 Jul 2026
  • Installation and Commissioning of LED Street Lights at Cantonment Board Barrackpore (IA - CEO Cantonment Board Barrackpore)

    Electricity & lightingLighting of public spaces· North 24 Parganas· #295448

    ₹15.0 L Awaiting sanction · 109 daysRec. 15 Jul 2026

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.