MPLADS report card · 18th Lok Sabha

Kartick Chandra Paul

Lok SabhaBJPRaiganj · West Bengal

MP score46/100398th of 542 in the 18th Lok Sabha
38th of 42 from West Bengal
  • Payments concentrated with one vendor

    94% of vendor payments went to B PAUL AND CO.

Allocated limit

₹20.27 Cr

Median ₹14.70 Cr

Fund utilisation

82%

₹16.65 Cr recommended · 410 works
Above median (76%)

Paid to vendors

₹7.01 Cr

35% of allocation
Below median (37%)

Works completed

101

25% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP410 works

    ₹16.65 Cr · 82% of the ₹20.27 Cr allocated

  2. Sanctioned by the district400 works

    98% sanctioned · took 3.5 months on average (due within 45 days)

  3. Completed101 works

    ₹2.62 Cr final cost · 12.4 months from recommendation on average

10 works are still awaiting sanction, 8 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 410 works worth ₹16.65 Cr, a fund utilisation of 82%, higher than 60% of 18th Lok Sabha MPs.
  • The district has sanctioned 400 of them, taking 3.5 months on average.
  • ₹7.01 Cr has been paid to vendors, 35% of the allocation.
  • 101 works are complete, typically 12.4 months after recommendation. 101 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 6 vendors. The largest received 94%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 46/100: finishing works counts most

  1. Works completed 30%25Completed ÷ recommended works.
  2. Spending efficiency 20%37Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%82Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%35Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    7
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: B PAUL AND CO, 94% of payments across 6 vendors.

District sanction speed

89/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%89Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

410 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Renovation of Dalkhola Press Club at Ward No. 8, Dalkhola Municipality, Karandighi, U/D

    Community buildings & public spacesConstruction of community centers and community halls· Uttar Dinajpur· #318550

    ₹6.0 L Awaiting sanction · 35 daysRec. 27 Sep 2026
  • Construction of a Mancha at Radhikapur High School, Radhikapur Village, Kaliyaganj Block

    Community buildings & public spacesConstruction of community centers and community halls· Uttar Dinajpur· #317170

    ₹15.0 L Awaiting sanction · 40 daysRec. 22 Sep 2026
  • Installation of Solar High Mast Light at Palsa Market, Raniganj GP

    Electricity & lightingLighting of public spaces· Uttar Dinajpur· #220068

    ₹2.5 L Completed 4 Sept 2026Rec. 19 Jul 2025Paid ₹2.5 L
  • Installation of Solar High Mast Light at Shri Shri Kalimata Thakurani Village

    Electricity & lightingLighting of public spaces· Uttar Dinajpur· #221532

    ₹2.5 L Completed 4 Sept 2026Rec. 23 Jul 2025Paid ₹2.5 L
  • Installation of electic high mast light Loknath Mandir, Loknath nagar, Thana Para (Total Fund of the scheme is rupees 500000, In phase one the sanctioned fund is 250000, in the second phase we are giving 250000)

    Electricity & lightingLighting of public spaces· Uttar Dinajpur· #310425

    ₹2.5 L Awaiting sanction · 62 daysRec. 31 Aug 2026
  • Construction of a community hall at Chargram Basanti pujo Committee, Kuria Village, Bochadanga GP (Total amount of the scheme is rupees 1290000, In phase one the sanctioned fund is 645000, in this second phase sanctioned fund will be 645000)

    Community buildings & public spacesConstruction of community centers and community halls· Uttar Dinajpur· #310430

    ₹6.5 L Awaiting sanction · 62 daysRec. 31 Aug 2026
  • Renovation of Uttar Dinajpur Press Club at Ward No. 10, Opposite of raiganj Station, Raiganj, U/D

    Community buildings & public spacesConstruction of community centers and community halls· Uttar Dinajpur· #308656

    ₹5.0 L Awaiting sanction · 67 daysRec. 26 Aug 2026
  • Construction of School Building at Pranabananda Vidyapeeth, Ward No. 17, Kaliyaganj Municipality

    Education & librariesConstruction of rooms and halls in school and colleges· Uttar Dinajpur· #307649

    ₹51.0 L Awaiting sanction · 69 daysRec. 24 Aug 2026
  • Construction of Laboratorie Room at Sarada Vidya Mandir (Bangla medium) at Ward No. 1, Raiganj Municipality

    Education & librariesConstruction of rooms and halls in school and colleges· Uttar Dinajpur· #307650

    ₹51.0 L Awaiting sanction · 69 daysRec. 24 Aug 2026
  • Purchasing a hearse van for Kaliyaganj Municipality, Ward No. 15

    Community buildings & public spacesPurchase of hearse van (Four, Three and Two wheelers)· Uttar Dinajpur· #307651

    ₹10.0 L Awaiting sanction · 69 daysRec. 24 Aug 2026
  • Construction of community hall and building at Shaktinagar 32 Prahar Nam jogyo Anusthan, Ward No. 8, Raiganj Municipality

    Community buildings & public spacesConstruction of community centers and community halls· Uttar Dinajpur· #307652

    ₹12.3 L Awaiting sanction · 69 daysRec. 24 Aug 2026
  • Installation of electic high mast light Loknath Mandir, Loknath nagar, Thana Para (Total Fund will be given for the scheme is rupees 500000, In phase one the sanctioned fund should be 250000, rest amount will be given in the second phase)

    Electricity & lightingLighting of public spaces· Uttar Dinajpur· #270439

    ₹2.5 L Time Estimation · 18 Aug 2026Rec. 23 Feb 2026
  • Supplying and installation of water cooler machine at Agamani Mahila Sangha, Ward No. 5

    Drinking waterInstalling community drinking water plants· Uttar Dinajpur· #270621

    ₹3.5 L Time Estimation · 18 Aug 2026Rec. 24 Feb 2026
  • Supplying and installation of water cooler machine at Radha Gobinda Ashram, Ward No. 10

    Drinking waterInstalling community drinking water plants· Uttar Dinajpur· #270622

    ₹3.5 L Time Estimation · 18 Aug 2026Rec. 24 Feb 2026
  • Supplying and installation of water cooler machine at Pratidhwani Club, Purba Akhanagar, Ward No. 7

    Drinking waterInstalling community drinking water plants· Uttar Dinajpur· #270623

    ₹3.5 L Time Estimation · 18 Aug 2026Rec. 24 Feb 2026

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.