Most funds not yet used
Works recommended for only 16% of the allocated limit.
Payments concentrated with one vendor
69% of vendor payments went to CONSTRUCON POWER ENGINEERING.
Allocated limit
₹20.27 Cr
Median ₹14.70 Cr
Fund utilisation
16%
₹3.26 Cr recommended · 19 works
Below median (76%)
Paid to vendors
₹1.90 Cr
9.4% of allocation
Below median (37%)
Works completed
5
26% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP19 works
₹3.26 Cr · 16% of the ₹20.27 Cr allocated
- Sanctioned by the district18 works
95% sanctioned · took 7.3 months on average (due within 45 days)
- Completed5 works
₹1.21 Cr final cost · 13.7 months from recommendation on average
1 works are still awaiting sanction, 1 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 19 works worth ₹3.26 Cr, a fund utilisation of 16%, higher than 2.2% of 18th Lok Sabha MPs.
- The district has sanctioned 18 of them, taking 7.3 months on average.
- ₹1.90 Cr has been paid to vendors, 9.4% of the allocation.
- 5 works are complete, typically 13.7 months after recommendation. 5 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 3 vendors. The largest received 69%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 43/100: finishing works counts most
- Works completed 30%26Completed ÷ recommended works.
- Spending efficiency 20%64Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%16Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%9Paid to vendors ÷ allocated limit.
- Vendor diversity 10%39How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: CONSTRUCON POWER ENGINEERING, 69% of payments across 3 vendors.
District sanction speed
70/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%70Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
19 works · tap “Photos” to see geo-tagged photos from eSAKSHI
solar street lights 62 nos. at Bahadur GP under Sadar Panchayat Samiti
Electricity & lightingStreet lights· Jalpaiguri· #193062
₹21.1 L Completed 15 Sept 2026Rec. 21 Apr 2025Paid ₹21.1 Lsolar street lights 60 nos. at Dabgram-2 GP under Rajganj Panchayat samiti
Electricity & lightingStreet lights· Jalpaiguri· #193061
₹20.4 L Completed 14 Sept 2026Rec. 21 Apr 2025Paid ₹20.4 LInstallation of solar street lights at Dabgram 1 GP under Rajganj Panchayet Samiti, Jalpaiguri
Electricity & lightingStreet lights· Jalpaiguri· #257048
₹20.8 L Completed 14 Sept 2026Rec. 4 Jan 2026Paid ₹20.8 Lsupply and installation of stand alone solar PV high mast light 10.5 M height at Nagar Berubari GP under Sadar PS Jalpaiguri
Electricity & lightingStreet lights· Jalpaiguri· #307965
₹20.6 L Awaiting sanction · 68 daysRec. 25 Aug 2026construction of paver block road with gaurd wall from Ashnivally to Deshbandhu para primary RR School, ward no 24 jalpaiguri municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jalpaiguri· #209003
₹26.9 L Completed 23 Jul 2026Rec. 16 Jun 2025Paid ₹26.9 Lconstruction of paver block road with guard wall from lt. mohadev pal house to naru saha house via ajay dey house to subodh basak house, vivekananda para, ward no 24, jalpaiguri municipality
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jalpaiguri· #209004
₹31.7 L Completed 23 Jul 2026Rec. 16 Jun 2025Paid ₹31.7 Lconstruction of paver block compound over the ground and primary access point at Budha Bharati School, at Haiderpara, Ward No. 40,Siliguri in the District of Jalpaiguri
Sports & fitnessDevelopment of playground· Jalpaiguri· #227781
₹11.1 L Vendor Identification · 23 Jul 2026Rec. 20 Aug 2025150 Nos. (MS) Steel Desk and Benches at Netaji Vidyapith High School (H.S) at Toralpara, Dhapganj, Kharia, Jalpaiguri
Education & librariesSetting up of laboratories· Jalpaiguri· #227783
₹9.9 L Work partially Completed · 13 Jul 2026Rec. 20 Aug 2025Construction of paver block road with drain from opposite of Assam More Pratik Automobile to the house of Tapas Sarkar, under Arabinda G.P, Jalpaiguri Sadar Block, Jalpaiguri
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jalpaiguri· #271710
₹18.3 L Physical Inspection · 9 Jul 2026Rec. 28 Feb 2026installation of solar submersible for drinking water at gadheyarkuti gp under dhupguri, jalpaiguri
Drinking waterInstalling community drinking water plants· Jalpaiguri· #221072
₹18.8 L Physical Inspection · 7 Jul 2026Rec. 22 Jul 2025installation of solar street light at gadheyarkuthi GP under dhupguri PS jalpaiguri
Electricity & lightingStreet lights· Jalpaiguri· #221073
₹1.4 L Physical Inspection · 7 Jul 2026Rec. 22 Jul 2025Paid ₹1.4 LInstallation of solar submersible for drinking water at kukurjan GP under Rajganj Panchayet samiti
Drinking waterInstalling community drinking water plants· Jalpaiguri· #255785
₹9.4 L Physical Inspection · 7 Jul 2026Rec. 28 Dec 2025installation of solar highmast light at Dabgram 2 GP under Rajganj Panchayet Samiti
Electricity & lightingStreet lights· Jalpaiguri· #255786
₹8.8 L Physical Inspection · 7 Jul 2026Rec. 28 Dec 2025Installation of solar submersible for drinking water at Bahadur GP under Sadar Panchayet samiti, Jalpaiguri
Drinking waterInstalling community drinking water plants· Jalpaiguri· #257049
₹18.8 L Physical Inspection · 30 Jun 2026Rec. 4 Jan 2026Installation of solar submersible for drinking water at Boalmari Nandanpur GP under Sadar Panchayet Samiti Jalpaiguri
Drinking waterInstalling community drinking water plants· Jalpaiguri· #255783
₹18.9 L Work partially Completed · 24 Jun 2026Rec. 28 Dec 2025Paid ₹18.8 L
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.