Allocated limit
₹15.22 Cr
Median ₹14.70 Cr
Fund utilisation
76%
₹11.63 Cr recommended · 221 works
About the median
Paid to vendors
₹5.03 Cr
33% of allocation
Below median (37%)
Works completed
85
38% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP221 works
₹11.63 Cr · 76% of the ₹15.22 Cr allocated
- Sanctioned by the district152 works
69% sanctioned · took 5.6 months on average (due within 45 days)
- Completed85 works
₹4.17 Cr final cost · 14.0 months from recommendation on average
69 works are still awaiting sanction, 67 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 221 works worth ₹11.63 Cr, a fund utilisation of 76%, higher than 51% of 18th Lok Sabha MPs.
- The district has sanctioned 152 of them, taking 5.6 months on average.
- ₹5.03 Cr has been paid to vendors, 33% of the allocation.
- 85 works are complete, typically 14.0 months after recommendation. 85 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 11 vendors. The largest received 31%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 67/100: finishing works counts most
- Works completed 30%38Completed ÷ recommended works.
- Spending efficiency 20%83Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%76Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%33Paid to vendors ÷ allocated limit.
- Vendor diversity 10%87How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: ROKHI GHOSH, 31% of payments across 11 vendors.
District sanction speed
65/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%65Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
221 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
11 nos Solar Street 6m Light with 1 no LED Nearby 1 Ujjwal Sangha Club Booth 84-183 2 H-O Nityagopal Debnath Booth84-184 3 Shyamdas Ashram Booth84-184 4 H-O Gupi Denath Booth 84-184 5 Factory of Prasanta Debnath Booth 84-185 6 H-O Ajit Mandal Booth 84-185 7 H-O Ramen Mandal Booth 84-186 8 H-O Prsanta Das Booth84-186 9 H-O Gouranga Sarkar Booth 84-187 10 H-O Bimal Debnath Booth84-187 11 H-O Tapan Barman under Charmajdia Charbrahmanagar GP Nabadwip Block Dev
Electricity & lightingStreet lights· Nadia· #164124
₹3.5 L Completed 29 Oct 2026Rec. 9 Jan 2025Paid ₹3.5 L11 Nos Solar Street 6m Light nearby 1 H-O Amal Pal Booth 84-188 2 H-O Shibu Mandal Booth 84-189 3 H-O Binay Debnath Booth 84-189 4 H-O Hari Debnath Booth 84-190 5 H-O Rabindra Debnath Booth 84-190 6 H-O Madan Debnath Booth 84-191 7 H-O Sridam Debnath Booth-84-191 8 H-O Nirmal Das Booth 84-192 9 Baruipara Primary School Booth84-192 10 Jou jukta Club Booth84-193 11 H-O Amal Ghosh Booth 84-193 under Charmajdia Charbrahmanagar GP Nabadwip Block Dev
Electricity & lightingStreet lights· Nadia· #164125
₹3.5 L Completed 29 Oct 2026Rec. 9 Jan 2025Paid ₹3.5 L12 Nos Solar Street Light With 1 nos Solar LED Nearby 1 H-O Jaydeb Das Booth84-189 2H-O Tarak Das Booth 84-194 3 Balighota Ashram Booth 84-195 4 H-O Debnath Biswas Booth84-195 5 h-o Gora Dhara Booth84-196 6 H-O Goutam Das Booth84-196 7 Dharpara Booth 84-197 8 Tetultala Booth 84-197 9 Sarderpara more Booth 84-198 10 H-O Biswajit Sarkar Booth 84-198 11 Barowaritala Booth 84-199 Boysangara Barowari tala Booth84-199 under Majdia Panshila GP Nabadwip Block Dev
Electricity & lightingStreet lights· Nadia· #164127
₹3.8 L Completed 29 Oct 2026Rec. 9 Jan 2025Paid ₹3.8 L12 Nos solar street Light 6m 1 no LED Nearby 1 Uttar Kalitala Booth 84-212 2Bali Gotta Booth 84-212 3 Shimulgachi Jelepara More Booth 84-213 4 Kuthipara more Booth 84-213 5 Mathpara Club Booth84-214 6 Mathpara More Booth 84-214 7 H-O Bapi Ghosh Booth 84-215 8 H-O Bipad Ghosh Booth 84-215 9 Natun Andadas Booth 84-216 10 Barowaritala Booth 84-216 11 Dhalai Road Purba Side Booth 84-217 12 Dhalai Road Paschim side Booth84-218 under Majdia Pansila GP Nabadwip Block Dev
Electricity & lightingStreet lights· Nadia· #164130
₹3.8 L Completed 29 Oct 2026Rec. 9 Jan 2025Paid ₹3.8 L12 Nos Solar Strret 6m Light with 1nos LED Nearby 1 H-O Madhu Das Booth84-200 2 H-O Swapan Biswas 84-200 3 H-O Anada Halder Booth 84-201 4 H-O Uttam Ghosh Booth 84-201 5 Panchapanda Club 84-202 6 H-O Brindaban Bhaduri Booth 84-202 7 H-O Jiten Sarkar Booth 84-203 8 Dakhinpara Deep tubeweel Booth 84-203 9 H-O Madan Pakar Booth 84-204 10 H-O Sakhti Booth 84-204 11 Shop of Mritunjay Debnath Booth 84-205 12 Matpara Deep tubuweel Booth 84-205 under Majdia Panshila GP Nabadwip Block Dev
Electricity & lightingStreet lights· Nadia· #164133
₹3.8 L Completed 29 Oct 2026Rec. 9 Jan 2025Paid ₹3.8 LConstruction of Proposed building for post office Duttaphulia branch including toilet for male and female staff and a store room under 89-180 under Duttaphulia GP RANAGHAT 2 BLOCK
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nadia· #322970
₹25.0 L Awaiting sanction · 10 daysRec. 22 Oct 2026Installation of 04 Nos Solar Street Light 9m with 04 Nos LED nearby 1 Beside Arkhisma playground Booth 137 2 Beside Taksali Khyeghat Booth 127 3 beside Magurkhali Maszid Booth 130 4 beside Shib Mandir Booth 129 under Khisma GP Ranaghat 1 block Development
Electricity & lightingStreet lights· Nadia· #323543
₹11.5 L Awaiting sanction · 10 daysRec. 22 Oct 202603 Nos solar street light 9m with 04 nos LED Nearby 1 Near Char Saragar Gangar par Ward-16 2 Loknath mandir near Bagane para Ward -02 3 Matri sangha Kalimandir near Hasimpur para Ward-16 under Santipur Municipality
Electricity & lightingStreet lights· Nadia· #242089
₹8.6 L Completed 16 Sept 2026Rec. 16 Oct 2025Paid ₹8.6 L10 Nos solar street Light 6m with 1 no LED nearby 1 Near graveyard Booth-23 2 H-O Arpita Mandal Booth-23 3 H-O Prasanta Mandal Booth-23 4 H-O Uttam Mandal Booth-23 5 H-O Bhagaban Debnath Booth-23 6 H-O Kamal Mandal Booth-23 7 H-O Rajlumar Mandal Booth-23 8 H-O Manik Mandal Booth-23 9 H-O Mritunjay Mandal Booth-23 10 H-O Amar Majumdar Booth-23 under Arbandi -1 Gram Panchayat Santipur Block Development
Electricity & lightingStreet lights· Nadia· #242233
₹3.4 L Completed 16 Sept 2026Rec. 16 Oct 2025Paid ₹3.4 L03 Nos Solar Street Light 9m with 04 nos LED Nearby 1) Baganchara Bus stand infront of the Shop of Nadu Ghosh Booth 25 2) Beler Math Kheya Ghat Booth 26 3) Laxminathpur GSF Primary School Booth 21 under Baganchara GP Santipur Block Development
Electricity & lightingStreet lights· Nadia· #164095
₹8.0 L Completed 14 Sept 2026Rec. 9 Jan 2025Paid ₹8.0 L02 Nos Solar Street Light 9m with 04 Nos LED Nearby 1) Nrisinghapur Shamshan Ghat Booth 83 2) Meler Math near Primary School Booth 61 under Haripur GP Santipur Block Development
Electricity & lightingStreet lights· Nadia· #164096
₹5.4 L Completed 14 Sept 2026Rec. 9 Jan 2025Paid ₹5.4 L01 Nos Solar Street Light 9m with 04 nos LED nearby 1) At Sahebdanga Sundaribala primary school ground ,Booth-90-54 under Nawpara Mashunda GP Ranaghat -1 Block Development
Electricity & lightingStreet lights· Nadia· #165787
₹2.7 L Completed 14 Sept 2026Rec. 15 Jan 2025Paid ₹2.7 L12 Solar Street Light (6m) with 1 no LED Nearby 1) H-O Nikhil SarkarBooth-58 2) H-O Sujan Das Booth-58 3) Health center Bagdebipur Booth-59 4) Deep tubewell dakhinpara Booth-59 5) meler math playground Booth-61 6) Nabaday sangha ground Nil kuthi Booth-66 7) tin raster more hartal smriti colony Booth-67 8) Jagarani samity ground Booth-86 9) tubewell bablaban para booth-86 10) H-O Masibul Sekh bOOTH-86 11) h-o Ansar sekh Booth-86 12) H-O Chhilo Dhabak Booth-86 under haripur gp Santipur Block dev.
Electricity & lightingStreet lights· Nadia· #179134
₹3.8 L Completed 14 Sept 2026Rec. 5 Mar 2025Paid ₹3.8 Lconstruction of CC road from the hemayatpur Primary school towards the H-O Palash Biswas Booth- 89-120 under Aranghata Gram Panchayat Ranaghat 2 block Development
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nadia· #242108
₹3.9 L Completed 10 Sept 2026Rec. 16 Oct 2025Paid ₹3.9 LConstruction of cc road from the shop of Sumangal babu ray towards the H-O Makhan Mandal Booth-89-122 under Aranghata Panchayat Ranaghat 2 block development
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Nadia· #242116
₹4.0 L Completed 10 Sept 2026Rec. 16 Oct 2025Paid ₹4.0 L
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.