Skip to content
MPLADSTracker
This is a record from the 17th Lok Sabha (2019–24). eSAKSHI covers its final year only, from April 2023. Comparisons are with other 17th Lok Sabha MPs.

MPLADS report card · 17th Lok Sabha

Shri Hibi Eden

Lok SabhaErnakulam · Kerala

MP score87/100215th of 539 in the 17th Lok Sabha
13th of 20 from Kerala
Re-elected to the 18th Lok Sabha Then: 92% utilisation, 29 works completed, score 61.

Allocated limit

₹8.32 Cr

Median ₹8.60 Cr

Fund utilisation

96%

₹7.98 Cr recommended · 40 works
About the median

Paid to vendors

₹7.00 Cr

84% of allocation
About the median

Works completed

36

90% of recommended
Above median (83%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP40 works

    ₹7.98 Cr · 96% of the ₹8.32 Cr allocated

  2. Sanctioned by the district40 works

    100% sanctioned · took 16.4 months on average (due within 45 days)

  3. Completed36 works

    ₹5.61 Cr final cost · 18.0 months from recommendation on average

In plain words

What the numbers say

  • Recommended 40 works worth ₹7.98 Cr, a fund utilisation of 96%, higher than 36% of 17th Lok Sabha MPs.
  • The district has sanctioned 40 of them, taking 16.4 months on average.
  • ₹7.00 Cr has been paid to vendors, 84% of the allocation.
  • 36 works are complete, typically 18.0 months after recommendation. 29 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Education & libraries.
  • Payments went to 19 vendors. The largest received 24%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 87/100: finishing works counts most

  1. Works completed 30%90Completed ÷ recommended works.
  2. Spending efficiency 20%80Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%96Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%81Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%84Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    95
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: AAY KAY CONSTRUCTIONS, 24% of payments across 19 vendors.

District sanction speed

50/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%50Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

40 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of side protection wall at Ambedker colony, ward 5, Mulavukad gramapanchayath (SC category)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #130701

    ₹12.2 L Completed 18 Aug 2026Rec. 16 Mar 2024Paid ₹12.2 L
  • Construction of building at SDPY High School, Palluruthy, Kochi Corporation

    Education & librariesConstruction of rooms and halls in school and colleges· Ernakulam· #131300

    ₹30.0 L Work partially Completed · 25 Jun 2026Rec. 16 Mar 2024Paid ₹29.8 L
  • Construction of first floor of the exicsting building compound wall and paving the floor tile on the yard at Dr Ambedkar Padana Gaveshana Kendram Punarudharana Pulaya Samajam Nayarambalam

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Ernakulam· #245305

    ₹25.0 L Sanctioned · 24 Jun 2026Rec. 27 Nov 2023
  • Construction of Thengathara pulaya SC colony road, ward 3, Njarakkal GP

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ernakulam· #131203

    ₹30.0 L Sanctioned · 13 May 2026Rec. 16 Mar 2024
  • Construction of OP Counter and waiting Area at General Hospital, Ernakulam

    HealthConstruction of rooms and facilities for hospitals, FWC , PHC Centers and ANM centers· Ernakulam· #130623

    ₹44.9 L Completed 31 Jan 2026Rec. 16 Mar 2024Paid ₹44.9 L
  • Purchase of 10 laptops and 2 projectors for St. Peters HS, Kumbalangy

    OtherLaptop/Computer· Ernakulam· #130567

    ₹4.1 L Completed 23 Dec 2025Rec. 16 Mar 2024Paid ₹4.1 L
  • Purchase of Laptops and Computers for 11 schools in Ernakulam District

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Ernakulam· #131151

    ₹12.8 L Completed 2 Oct 2025Rec. 16 Mar 2024Paid ₹12.8 L
  • Purchase of an Ambulance for Primary Health Center, Moothakunnam, Vadakkekkara GP

    HealthPurchase of ambulances (Four, Three and Two wheelers)· Ernakulam· #130405

    ₹13.1 L Completed 24 Sept 2025Rec. 16 Mar 2024Paid ₹13.1 L
  • Purchase of 5 laptops and 1 Projector for VCS HSS, Puthenvelikkara

    OtherLaptop/Computer· Ernakulam· #130610

    ₹2.1 L Completed 23 Sept 2025Rec. 16 Mar 2024Paid ₹2.1 L
  • Purchase of 5 laptops and 1 projector for AISUP School, Manjaly

    Education & librariesLaptop/Computer· Ernakulam· #130597

    ₹2.1 L Completed 21 Sept 2025Rec. 16 Mar 2024Paid ₹2.1 L
  • Purchase of 4 laptops for St Joachims UP School, Kaloor

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Ernakulam· #175986

    ₹1.4 L Completed 21 Sept 2025Rec. 26 Jan 2024Paid ₹1.4 L
  • Purchase of 4 laptops for St.Peters UP School, Kumbalangy

    Education & librariesPurchase of IT systems, including hardware and software for educational purposes· Ernakulam· #175988

    ₹1.4 L Completed 21 Sept 2025Rec. 26 Jan 2024Paid ₹1.4 L
  • Installation of High Mast Light (12 Mtr) infront of Christ the King Church, Kannamali, Ward 7, Chellanam Grama Panchayat

    Electricity & lightingLighting of public spaces· Ernakulam· #175974

    ₹4.9 L Completed 17 Sept 2025Rec. 17 Aug 2023Paid ₹4.9 L
  • Installation of Highmast Light Infront of Juma Masjid Panangad, Ward No. 12, Kumbalam GP

    Electricity & lightingLighting of public spaces· Ernakulam· #175982

    ₹4.9 L Completed 17 Sept 2025Rec. 13 Nov 2023Paid ₹4.9 L
  • Installation of Highmast Light at thekkethazham Jn, Manjali, Ward 2, Karumaloor GP

    Electricity & lightingLighting of public spaces· Ernakulam· #175983

    ₹4.9 L Completed 17 Sept 2025Rec. 13 Nov 2023Paid ₹4.9 L

17th Lok Sabha MPs from Kerala

Ranked by MP score

#MPUtilisationSpentCompletedScore
1M P Abdussamad Samadani · Malappuram84%84%17995
2T N Prathapan · Thrissur100%95%9094
3E T Mohammed Basheer · Ponnani84%83%11794
4Rahul Gandhi · Wayanad90%90%7193
5Shri M K Raghavan · Kozhikode77%74%21392
6Shri Rajmohan Unnithan · Kasaragod98%97%28392
7Dr Shashi Tharoor · Thiruvananthapuram91%84%15092
8Adv Adoor Prakash · Attingal100%97%29092
9Anto Antony · Pathanamthitta99%88%15490
10Adv Dean Kuriakose · Idukki90%82%14790
11Smt Ramya Haridas · Alathur100%100%41890
12Vellalath Kochukrishnan Nair Sreekandan · Palakkad100%83%14590

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.