Allocated limit
₹14.89 Cr
Median ₹14.70 Cr
Fund utilisation
58%
₹8.61 Cr recommended · 169 works
Below median (76%)
Paid to vendors
₹4.11 Cr
28% of allocation
Below median (37%)
Works completed
99
59% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP169 works
₹8.61 Cr · 58% of the ₹14.89 Cr allocated
- Sanctioned by the district153 works
91% sanctioned · took 3.4 months on average (due within 45 days)
- Completed99 works
₹3.85 Cr final cost · 10.4 months from recommendation on average
16 works are still awaiting sanction, 7 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 169 works worth ₹8.61 Cr, a fund utilisation of 58%, higher than 20% of 18th Lok Sabha MPs.
- The district has sanctioned 153 of them, taking 3.4 months on average.
- ₹4.11 Cr has been paid to vendors, 28% of the allocation.
- 99 works are complete, typically 10.4 months after recommendation. 77 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 71 vendors. The largest received 6.1%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 69/100: finishing works counts most
- Works completed 30%59Completed ÷ recommended works.
- Spending efficiency 20%94Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%78Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%28Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: S K CHATTERJEE ELECTRICALS PVT LTD, 6.1% of payments across 71 vendors.
District sanction speed
89/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%89Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
169 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
CONSTRUCTION OF CONCRETE ROAD FROM MADAN GHOSH HOUSE TO CHITTARANJAN NAIYA HOUSE
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #215011
₹5.8 L Completed 24 Sept 2026Rec. 5 Jul 2025Paid ₹5.8 LCONSTRUCTION OC CC ROAD FROM PRADIP MONDAL HOUSE TO KARNA HATI HOUSE
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #140051
₹3.5 L Completed 21 Sept 2026Rec. 9 Sep 2024Paid ₹3.5 LCONSTRUCTION OF CC ROAD FROM BHOLA HALDER HOUSE TO PARITOSH MONDALHOUSE
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139726
₹3.9 L Completed 19 Sept 2026Rec. 7 Sep 2024Paid ₹3.9 LCONSTRUCTION OF CC ROAD FROM ARABINDU RUIDAS HOUSE TO BHOLA RUIDAS HOUSE
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139727
₹3.0 L Completed 19 Sept 2026Rec. 7 Sep 2024Paid ₹3.0 LCONSTRUCTION OF CC ROAD FROM ASHROM TO SUBHRA MONDALPUKURPAR
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139739
₹4.0 L Completed 19 Sept 2026Rec. 7 Sep 2024Paid ₹4.0 Linstalation of highmust light at chemaguri Byomkesh maity setu 8pcs light
Electricity & lightingLighting of public spaces· South 24 Parganas· #179987
₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 Linstalation of highmust light at kalibazer basantimandir maity setu 8pcs light
Electricity & lightingLighting of public spaces· South 24 Parganas· #179988
₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 Linstalation of highmust light at Gangasagar k-1 Bus stand 8pcs light
Electricity & lightingLighting of public spaces· South 24 Parganas· #179989
₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 Linstalation of highmust light at Bagdangabazer Mousumi 8pcs light
Electricity & lightingLighting of public spaces· South 24 Parganas· #179990
₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 LConstruction of entry Gates at Srimati near srimati bustand
Safety & securitySecurity gates in streets/public place for safety purpose· South 24 Parganas· #316021
₹10.0 L Awaiting sanction · 44 daysRec. 18 Sep 2026Construction of entry Gates at Chakratirtha near khari Bustand
Safety & securitySecurity gates in streets/public place for safety purpose· South 24 Parganas· #316022
₹10.0 L Awaiting sanction · 44 daysRec. 18 Sep 2026instalation of highmust light at mahendragange bazer 8pcs light
Electricity & lightingLighting of public spaces· South 24 Parganas· #179986
₹5.0 L Completed 17 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 LConstruction of Additional class room at Ramkrishna F.P School at suryanagar
Education & librariesConstruction of rooms and halls in school and colleges· South 24 Parganas· #315798
₹12.0 L Awaiting sanction · 45 daysRec. 17 Sep 2026Construction of Additional class room at Kumarpurjaharpur High School at Rabindra G.P
Education & librariesConstruction of rooms and halls in school and colleges· South 24 Parganas· #315799
₹12.0 L Awaiting sanction · 45 daysRec. 17 Sep 2026Construction of CC Road from Sailen Mondal house to Patitpabon Halder house at Swami vivekananda G.P
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #315800
₹13.8 L Awaiting sanction · 45 daysRec. 17 Sep 2026
18th Lok Sabha MPs from West Bengal
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Asit Kumar Mal · Bolpur | 89% | 60% | 146 | 83 |
| 2 | Pratima Mondal · Joynagar | 66% | 50% | 180 | 82 |
| 3 | Kalyan Banerjee · Sreerampur | 63% | 52% | 97 | 82 |
| 4 | Shri Deepak (Dev) Adhikari · Ghatal | 95% | 56% | 166 | 81 |
| 5 | Shri Abhishek Banerjee · Diamond Harbour | 64% | 49% | 254 | 79 |
| 6 | Kalipada Saren · Jhargram | 78% | 49% | 40 | 76 |
| 7 | Prasun Banerjee · Howrah | 74% | 50% | 140 | 74 |
| 8 | Kakoli Ghosh Dastidar · Barasat | 87% | 43% | 82 | 71 |
| 9 | Smt Sajda Ahmed · Uluberia | 72% | 34% | 96 | 71 |
| 10 | Saumitra khan · Bishnupur | 98% | 44% | 48 | 71 |
| 11 | Bag Mitali · Arambag | 96% | 41% | 95 | 71 |
| 12 | Smt Satabdi Roy (Banerjee) · Birbhum | 48% | 32% | 62 | 71 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.