Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Bapi Haldar

Lok SabhaAITCSC seatMathurapur · West Bengal

MP score69/10093rd of 542 in the 18th Lok Sabha
14th of 42 from West Bengal

Allocated limit

₹14.89 Cr

Median ₹14.70 Cr

Fund utilisation

58%

₹8.61 Cr recommended · 169 works
Below median (76%)

Paid to vendors

₹4.11 Cr

28% of allocation
Below median (37%)

Works completed

99

59% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP169 works

    ₹8.61 Cr · 58% of the ₹14.89 Cr allocated

  2. Sanctioned by the district153 works

    91% sanctioned · took 3.4 months on average (due within 45 days)

  3. Completed99 works

    ₹3.85 Cr final cost · 10.4 months from recommendation on average

16 works are still awaiting sanction, 7 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 169 works worth ₹8.61 Cr, a fund utilisation of 58%, higher than 20% of 18th Lok Sabha MPs.
  • The district has sanctioned 153 of them, taking 3.4 months on average.
  • ₹4.11 Cr has been paid to vendors, 28% of the allocation.
  • 99 works are complete, typically 10.4 months after recommendation. 77 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 71 vendors. The largest received 6.1%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 69/100: finishing works counts most

  1. Works completed 30%59Completed ÷ recommended works.
  2. Spending efficiency 20%94Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%58Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%78Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%28Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    100
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: S K CHATTERJEE ELECTRICALS PVT LTD, 6.1% of payments across 71 vendors.

District sanction speed

89/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%89Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

169 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • CONSTRUCTION OF CONCRETE ROAD FROM MADAN GHOSH HOUSE TO CHITTARANJAN NAIYA HOUSE

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #215011

    ₹5.8 L Completed 24 Sept 2026Rec. 5 Jul 2025Paid ₹5.8 L
  • CONSTRUCTION OC CC ROAD FROM PRADIP MONDAL HOUSE TO KARNA HATI HOUSE

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #140051

    ₹3.5 L Completed 21 Sept 2026Rec. 9 Sep 2024Paid ₹3.5 L
  • CONSTRUCTION OF CC ROAD FROM BHOLA HALDER HOUSE TO PARITOSH MONDALHOUSE

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139726

    ₹3.9 L Completed 19 Sept 2026Rec. 7 Sep 2024Paid ₹3.9 L
  • CONSTRUCTION OF CC ROAD FROM ARABINDU RUIDAS HOUSE TO BHOLA RUIDAS HOUSE

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139727

    ₹3.0 L Completed 19 Sept 2026Rec. 7 Sep 2024Paid ₹3.0 L
  • CONSTRUCTION OF CC ROAD FROM ASHROM TO SUBHRA MONDALPUKURPAR

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #139739

    ₹4.0 L Completed 19 Sept 2026Rec. 7 Sep 2024Paid ₹4.0 L
  • instalation of highmust light at chemaguri Byomkesh maity setu 8pcs light

    Electricity & lightingLighting of public spaces· South 24 Parganas· #179987

    ₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 L
  • instalation of highmust light at kalibazer basantimandir maity setu 8pcs light

    Electricity & lightingLighting of public spaces· South 24 Parganas· #179988

    ₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 L
  • instalation of highmust light at Gangasagar k-1 Bus stand 8pcs light

    Electricity & lightingLighting of public spaces· South 24 Parganas· #179989

    ₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 L
  • instalation of highmust light at Bagdangabazer Mousumi 8pcs light

    Electricity & lightingLighting of public spaces· South 24 Parganas· #179990

    ₹5.0 L Completed 19 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 L
  • Construction of entry Gates at Srimati near srimati bustand

    Safety & securitySecurity gates in streets/public place for safety purpose· South 24 Parganas· #316021

    ₹10.0 L Awaiting sanction · 44 daysRec. 18 Sep 2026
  • Construction of entry Gates at Chakratirtha near khari Bustand

    Safety & securitySecurity gates in streets/public place for safety purpose· South 24 Parganas· #316022

    ₹10.0 L Awaiting sanction · 44 daysRec. 18 Sep 2026
  • instalation of highmust light at mahendragange bazer 8pcs light

    Electricity & lightingLighting of public spaces· South 24 Parganas· #179986

    ₹5.0 L Completed 17 Sept 2026Rec. 7 Mar 2025Paid ₹5.0 L
  • Construction of Additional class room at Ramkrishna F.P School at suryanagar

    Education & librariesConstruction of rooms and halls in school and colleges· South 24 Parganas· #315798

    ₹12.0 L Awaiting sanction · 45 daysRec. 17 Sep 2026
  • Construction of Additional class room at Kumarpurjaharpur High School at Rabindra G.P

    Education & librariesConstruction of rooms and halls in school and colleges· South 24 Parganas· #315799

    ₹12.0 L Awaiting sanction · 45 daysRec. 17 Sep 2026
  • Construction of CC Road from Sailen Mondal house to Patitpabon Halder house at Swami vivekananda G.P

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· South 24 Parganas· #315800

    ₹13.8 L Awaiting sanction · 45 daysRec. 17 Sep 2026

18th Lok Sabha MPs from West Bengal

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Asit Kumar Mal · Bolpur89%60%14683
2Pratima Mondal · Joynagar66%50%18082
3Kalyan Banerjee · Sreerampur63%52%9782
4Shri Deepak (Dev) Adhikari · Ghatal95%56%16681
5Shri Abhishek Banerjee · Diamond Harbour64%49%25479
6Kalipada Saren · Jhargram78%49%4076
7Prasun Banerjee · Howrah74%50%14074
8Kakoli Ghosh Dastidar · Barasat87%43%8271
9Smt Sajda Ahmed · Uluberia72%34%9671
10Saumitra khan · Bishnupur98%44%4871
11Bag Mitali · Arambag96%41%9571
12Smt Satabdi Roy (Banerjee) · Birbhum48%32%6271

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.