Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Swami Sachchidanandhari Sakshi ji Maharaj

Lok SabhaBJPUnnao · Uttar Pradesh

MP score41/100437th of 542 in the 18th Lok Sabha
68th of 80 from Uttar Pradesh
Also an MP in the 17th Lok Sabha Then: 91% utilisation, 66 works completed, score 81.
  • Payments concentrated with one vendor

    92% of vendor payments went to RAJESH KUMAR PAL.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

67%

₹9.81 Cr recommended · 80 works
Below median (76%)

Paid to vendors

₹8.49 Cr

58% of allocation
Above median (37%)

Works completed

14

18% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP80 works

    ₹9.81 Cr · 67% of the ₹14.70 Cr allocated

  2. Sanctioned by the district76 works

    95% sanctioned · took 2.5 months on average (due within 45 days)

  3. Completed14 works

    ₹1.78 Cr final cost · 14.5 months from recommendation on average

4 works are still awaiting sanction, 4 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 80 works worth ₹9.81 Cr, a fund utilisation of 67%, higher than 36% of 18th Lok Sabha MPs.
  • The district has sanctioned 76 of them, taking 2.5 months on average.
  • ₹8.49 Cr has been paid to vendors, 58% of the allocation.
  • 14 works are complete, typically 14.5 months after recommendation. 15 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 8 vendors. The largest received 92%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 41/100: finishing works counts most

  1. Works completed 30%18Completed ÷ recommended works.
  2. Spending efficiency 20%21Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%67Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%58Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    11
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: RAJESH KUMAR PAL, 92% of payments across 8 vendors.

District sanction speed

93/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%93Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

81 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Interlocking construction work from Mewalal house in village Salehpur Purva Ugu Unnao to front Rajesh house in Fatehpur Chaurasi.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #174843

    ₹5.4 L Completed 22 Sept 2026Rec. 10 Feb 2025Paid ₹5.4 L
  • Construction work of interlocking from Ramdas house to Sharda canal connecting road in Gram Panchayat Matlabpur village Kandharkheda.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #174846

    ₹13.9 L Completed 22 Sept 2026Rec. 10 Feb 2025Paid ₹13.9 L
  • Toilet Construction in Lala Ramautar Smarak Shishu Mandir School Bhagwantnagar Sumerpur

    Sanitation & drainageConstruction of toilet blocks· Unnao· #315533

    ₹50,000 Awaiting sanction · 46 daysRec. 16 Sep 2026
  • For a CPAP machine in the Sick Newborn Care Unit set up in the Womens Hospital in Unnao district

    HealthPurchase of hospital equipment· Unnao· #257122

    ₹1.6 L Sanctioned · 5 Aug 2026Rec. 7 Jan 2026
  • Construction of interlocking Road gram Panchyat poni Bramh dev Mandir to Maa Chaturbhuji Mandir Block S. Karan

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #288353

    ₹9.9 L Sanctioned · 23 Jul 2026Rec. 23 Jun 2026
  • Construction of interlocking Road gram Trilokpur in Nakul Rajbahadur House to Ramssajeevan Door Block Bighapur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #288354

    ₹13.3 L Sanctioned · 23 Jul 2026Rec. 23 Jun 2026
  • Construction of Hanumant Jeev Ashram in Animal shelter

    Agriculture & animal careConstruction of shelters for animals· Unnao· #288355

    ₹12.7 L Sanctioned · 23 Jul 2026Rec. 23 Jun 2026
  • Construction of interlocking Road gram Panchyat Atwa umar Puliya to Pradeep Kumar House Block Safipur

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #288356

    ₹12.7 L Sanctioned · 23 Jul 2026Rec. 23 Jun 2026
  • Construction of interlocking and drain in Ward No. 10 from Tiwari Chakki house to Sunder Lal house via Vishwanath Munshi house.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #277560

    ₹10.5 L Vendor Identification · 19 Jun 2026Rec. 10 Apr 2026Paid ₹10.5 L
  • Interlocking work on RaeBareli Road to Mamleshwar Mahadev link road at village Sikandarpur karan.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #277561

    ₹12.0 L Vendor Identification · 19 Jun 2026Rec. 10 Apr 2026Paid ₹12.0 L
  • Installing of RO water cooler between Primary School and Girls Junior School in village Sagarwar Dhanikheda Marg Block Bighapur.

    Drinking waterInstalling community drinking water plants· Unnao· #277562

    ₹7.3 L Vendor Identification · 19 Jun 2026Rec. 10 Apr 2026Paid ₹7.2 L
  • Installationm of RO Water Cooler on Main Road near Baratshala on Piprasar Marg

    Drinking waterInstalling community drinking water plants· Unnao· #277563

    ₹7.3 L Vendor Identification · 19 Jun 2026Rec. 10 Apr 2026Paid ₹7.2 L
  • Interlocking work from Jamal Ahmed Inter College to Lucknow Kanpur Road in Ward No. 12 Pitambar Nagar (Shivnagar)

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #277564

    ₹9.7 L Work partially Completed · 19 Jun 2026Rec. 10 Apr 2026Paid ₹9.6 L
  • Interlocking work from Suresh Barber door to Medi Lal door in Majra Durgaganj Gram Sabha Porai.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #277565

    ₹10.3 L Vendor Identification · 19 Jun 2026Rec. 10 Apr 2026Paid ₹10.3 L
  • Construction of Drain and Interlocking Road from Pilia to Saint Judes School in Pitambar Nagar.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Unnao· #277566

    ₹8.0 L Vendor Identification · 19 Jun 2026Rec. 10 Apr 2026Paid ₹8.0 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.