Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Vinod Kumar Bind

Lok SabhaBJPBhadohi · Uttar Pradesh

MP score82/10012th of 542 in the 18th Lok Sabha
6th of 80 from Uttar Pradesh
  • Payments concentrated with one vendor

    52% of vendor payments went to Gandhi Construction And Supplier.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

81%

₹11.90 Cr recommended · 555 works
Above median (76%)

Paid to vendors

₹8.59 Cr

58% of allocation
Above median (37%)

Works completed

525

95% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP555 works

    ₹11.90 Cr · 81% of the ₹14.70 Cr allocated

  2. Sanctioned by the district547 works

    99% sanctioned · took 2.3 months on average (due within 45 days)

  3. Completed525 works

    ₹7.55 Cr final cost · 14.1 months from recommendation on average

8 works are still awaiting sanction.

In plain words

What the numbers say

  • Recommended 555 works worth ₹11.90 Cr, a fund utilisation of 81%, higher than 58% of 18th Lok Sabha MPs.
  • The district has sanctioned 547 of them, taking 2.3 months on average.
  • ₹8.59 Cr has been paid to vendors, 58% of the allocation.
  • 525 works are complete, typically 14.1 months after recommendation. 411 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 9 vendors. The largest received 52%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 82/100: finishing works counts most

  1. Works completed 30%95Completed ÷ recommended works.
  2. Spending efficiency 20%88Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%81Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%78Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%58Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    60
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Gandhi Construction And Supplier, 52% of payments across 9 vendors.

District sanction speed

96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

555 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of high-mast lights at the playground near Kakrahi School

    Electricity & lightingLighting of public spaces· Bhadohi· #325168

    ₹6.2 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • Installation work of 280 solar street lights

    Electricity & lightingLighting of public spaces· Bhadohi· #311953

    ₹60.2 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026
  • Installation work of 84 solar high-mast lights

    Electricity & lightingLighting of public spaces· Bhadohi· #311968

    ₹86.8 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026
  • Installation of a drinking water plant at the Chakmandhata sports ground

    Drinking waterInstalling tube-wells and borewells· Bhadohi· #312018

    ₹2.4 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026
  • Installation of a drinking water plant at the musilatpur sports ground

    Drinking waterInstalling tube-wells and borewells· Bhadohi· #312019

    ₹1.3 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026
  • gopiganj ke ward no 03 me ramkumar pandey ke ghar se prem seth ke ghar tak Interlocking nirman kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #312021

    ₹2.6 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026
  • parshottampur me pich road se parasnath singh ke ghar ki taraf Interlocking marg ka nirman kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #312022

    ₹7.1 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026
  • Jhauva Me Shiv Mandir Se Om Prakash Pandey Ke Ghar Ki or Interlocking Nirman Kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324856

    ₹6.8 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Gopiganj word no 3 me Bade Shiv Mandir Ke Pass sarvjanik sthal par Interlocking nirman kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324857

    ₹7.8 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Gopiganj word no 03 Me Bade Shiv Mandir Ke Pass sarvjanik Shed Ka Nirman Kary

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Bhadohi· #324858

    ₹13.7 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Asaipur Me Samprk Marg Se Ramchandra Ke Ghar KI Or Interlocking Nirman Kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324864

    ₹9.8 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Rohi Me Ashish Singh Ke Ghar Se Shiv Mandir Hote Huye Arun Praksh Ke Ghar Ki Or Interlocking Nirman Kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324865

    ₹7.2 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Ganeshraypur Me Shitla Prasad Ke Ghar Se Ram Sahab Bind Ke Ghar Tak Interlocking Marg Ka Nirman V Pich Road Tak Nali Ka Nirman Kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324866

    ₹20.1 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • Ganeshraypur Me Samprk Marg Se Dinesh Bind Ke Ghar KI Or Interlocking Marg Ka Nirman Kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324867

    ₹21.9 L Awaiting sanction · 3 daysRec. 29 Oct 2026
  • gram sabha gohilaon me chaura mata mandir bhuidhar patel ke ghar se hote huye chandrashekhar patel ke ghar tak Interlocking nirman kary

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #244980

    ₹6.1 L Completed 29 Sept 2026Rec. 30 Oct 2025Paid ₹6.1 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.