Payments concentrated with one vendor
52% of vendor payments went to Gandhi Construction And Supplier.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
81%
₹11.90 Cr recommended · 555 works
Above median (76%)
Paid to vendors
₹8.59 Cr
58% of allocation
Above median (37%)
Works completed
525
95% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP555 works
₹11.90 Cr · 81% of the ₹14.70 Cr allocated
- Sanctioned by the district547 works
99% sanctioned · took 2.3 months on average (due within 45 days)
- Completed525 works
₹7.55 Cr final cost · 14.1 months from recommendation on average
8 works are still awaiting sanction.
In plain words
What the numbers say
- Recommended 555 works worth ₹11.90 Cr, a fund utilisation of 81%, higher than 58% of 18th Lok Sabha MPs.
- The district has sanctioned 547 of them, taking 2.3 months on average.
- ₹8.59 Cr has been paid to vendors, 58% of the allocation.
- 525 works are complete, typically 14.1 months after recommendation. 411 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 9 vendors. The largest received 52%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 82/100: finishing works counts most
- Works completed 30%95Completed ÷ recommended works.
- Spending efficiency 20%88Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%81Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%78Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%58Paid to vendors ÷ allocated limit.
- Vendor diversity 10%60How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Gandhi Construction And Supplier, 52% of payments across 9 vendors.
District sanction speed
96/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%96Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
555 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Installation of high-mast lights at the playground near Kakrahi School
Electricity & lightingLighting of public spaces· Bhadohi· #325168
₹6.2 L Awaiting sanction · 2 daysRec. 30 Oct 2026Installation work of 280 solar street lights
Electricity & lightingLighting of public spaces· Bhadohi· #311953
₹60.2 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026Installation work of 84 solar high-mast lights
Electricity & lightingLighting of public spaces· Bhadohi· #311968
₹86.8 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026Installation of a drinking water plant at the Chakmandhata sports ground
Drinking waterInstalling tube-wells and borewells· Bhadohi· #312018
₹2.4 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026Installation of a drinking water plant at the musilatpur sports ground
Drinking waterInstalling tube-wells and borewells· Bhadohi· #312019
₹1.3 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026gopiganj ke ward no 03 me ramkumar pandey ke ghar se prem seth ke ghar tak Interlocking nirman kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #312021
₹2.6 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026parshottampur me pich road se parasnath singh ke ghar ki taraf Interlocking marg ka nirman kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #312022
₹7.1 L Sanctioned · 29 Oct 2026Rec. 3 Sep 2026Jhauva Me Shiv Mandir Se Om Prakash Pandey Ke Ghar Ki or Interlocking Nirman Kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324856
₹6.8 L Awaiting sanction · 3 daysRec. 29 Oct 2026Gopiganj word no 3 me Bade Shiv Mandir Ke Pass sarvjanik sthal par Interlocking nirman kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324857
₹7.8 L Awaiting sanction · 3 daysRec. 29 Oct 2026Gopiganj word no 03 Me Bade Shiv Mandir Ke Pass sarvjanik Shed Ka Nirman Kary
Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Bhadohi· #324858
₹13.7 L Awaiting sanction · 3 daysRec. 29 Oct 2026Asaipur Me Samprk Marg Se Ramchandra Ke Ghar KI Or Interlocking Nirman Kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324864
₹9.8 L Awaiting sanction · 3 daysRec. 29 Oct 2026Rohi Me Ashish Singh Ke Ghar Se Shiv Mandir Hote Huye Arun Praksh Ke Ghar Ki Or Interlocking Nirman Kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324865
₹7.2 L Awaiting sanction · 3 daysRec. 29 Oct 2026Ganeshraypur Me Shitla Prasad Ke Ghar Se Ram Sahab Bind Ke Ghar Tak Interlocking Marg Ka Nirman V Pich Road Tak Nali Ka Nirman Kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324866
₹20.1 L Awaiting sanction · 3 daysRec. 29 Oct 2026Ganeshraypur Me Samprk Marg Se Dinesh Bind Ke Ghar KI Or Interlocking Marg Ka Nirman Kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #324867
₹21.9 L Awaiting sanction · 3 daysRec. 29 Oct 2026gram sabha gohilaon me chaura mata mandir bhuidhar patel ke ghar se hote huye chandrashekhar patel ke ghar tak Interlocking nirman kary
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bhadohi· #244980
₹6.1 L Completed 29 Sept 2026Rec. 30 Oct 2025Paid ₹6.1 L
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.