MPLADS report card · 18th Lok Sabha

Neeraj Maurya

Lok SabhaSPAonla · Uttar Pradesh

MP score75/10044th of 542 in the 18th Lok Sabha
11th of 80 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

100%

₹14.69 Cr recommended · 36 works
Above median (76%)

Paid to vendors

₹13.39 Cr

91% of allocation
Above median (37%)

Works completed

17

47% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP36 works

    ₹14.69 Cr · 100% of the ₹14.70 Cr allocated

  2. Sanctioned by the district36 works

    100% sanctioned · took 34 days on average (due within 45 days)

  3. Completed17 works

    ₹9.66 Cr final cost · 4.9 months from recommendation on average

In plain words

What the numbers say

  • Recommended 36 works worth ₹14.69 Cr, a fund utilisation of 100%, higher than 99% of 18th Lok Sabha MPs.
  • The district has sanctioned 36 of them, taking 34 days on average.
  • ₹13.39 Cr has been paid to vendors, 91% of the allocation.
  • 17 works are complete, typically 4.9 months after recommendation. 17 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 4 vendors. The largest received 44%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 75/100: finishing works counts most

  1. Works completed 30%47Completed ÷ recommended works.
  2. Spending efficiency 20%72Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%91Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    70
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SHRI GURU KRIPA NARSINGH ASSOCIATES, 44% of payments across 4 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

36 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • supply and installation of led semi high mast light at 44 different places block dataganj

    Electricity & lightingLighting of public spaces· Budaun· #301697

    ₹74.6 L Vendor Identification · 28 Sept 2026Rec. 6 Aug 2026Paid ₹56.0 L
  • supply and installation of led semi high mast light at 31 different places block samrer

    Electricity & lightingLighting of public spaces· Budaun· #301698

    ₹52.6 L Vendor Identification · 28 Sept 2026Rec. 6 Aug 2026Paid ₹39.4 L
  • supply and installation of led semi high mast light at 33 different places block usawan

    Electricity & lightingLighting of public spaces· Budaun· #301699

    ₹56.0 L Vendor Identification · 28 Sept 2026Rec. 6 Aug 2026Paid ₹42.0 L
  • supply and installation of led semi high mast light at 21 different places block kadarchowk

    Electricity & lightingLighting of public spaces· Budaun· #301700

    ₹35.6 L Vendor Identification · 28 Sept 2026Rec. 6 Aug 2026Paid ₹26.7 L
  • supply and installation of led semi high mast light at 36 different places block miaun

    Electricity & lightingLighting of public spaces· Budaun· #301701

    ₹61.1 L Vendor Identification · 28 Sept 2026Rec. 6 Aug 2026Paid ₹45.8 L
  • Gram Kangaon se gram sirohi led light ka karya 1 se 12 alampur jafrabaad block

    Electricity & lightingLighting of public spaces· Bareilly· #304236

    ₹23.5 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹17.7 L
  • Gram Kudda se gram devi me led light ka karya 13 se 24 alampur jafrabad

    Electricity & lightingLighting of public spaces· Bareilly· #304237

    ₹23.5 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹17.7 L
  • Gram tukri se ballia me led light ka karya 25 se 30 block jafrabad

    Electricity & lightingLighting of public spaces· Bareilly· #304238

    ₹11.8 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹7.8 L
  • Gram chaubari se gram hebatpur me led light ka karya 1 se 12 block kyara

    Electricity & lightingLighting of public spaces· Bareilly· #304239

    ₹23.5 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹17.7 L
  • Gram sundarpur me ed light ka karya 13 se 16 block kyara

    Electricity & lightingLighting of public spaces· Bareilly· #304240

    ₹7.8 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹5.9 L
  • Gram naryabal se gram lohiya me led light ka karya 1 se 9

    Electricity & lightingLighting of public spaces· Bareilly· #304241

    ₹17.7 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹11.8 L
  • Gram Kishanpura m bhuda basetpura se kishanpur me led light ka karya 1 se 12 block majhgawan

    Electricity & lightingLighting of public spaces· Bareilly· #304242

    ₹23.5 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹17.7 L
  • Gra rajpurakala se kalyanpur me led light ka karya 13 se 24

    Electricity & lightingLighting of public spaces· Bareilly· #304243

    ₹23.5 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹17.7 L
  • Gram fulasi se naugawan brahnan me led light ka karya 25 se 36 block majhgawan

    Electricity & lightingLighting of public spaces· Bareilly· #304244

    ₹23.5 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹17.7 L
  • Gram jalalpur se shivpuri me led light ka karya 37 se 39

    Electricity & lightingLighting of public spaces· Bareilly· #304245

    ₹5.9 L Vendor Identification · 21 Sept 2026Rec. 15 Aug 2026Paid ₹3.9 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.