Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Ramesh Awasthi

Lok SabhaBJPKanpur · Uttar Pradesh

MP score79/10023rd of 542 in the 18th Lok Sabha
7th of 80 from Uttar Pradesh

Allocated limit

₹14.93 Cr

Median ₹14.70 Cr

Fund utilisation

84%

₹12.56 Cr recommended · 160 works
Above median (76%)

Paid to vendors

₹8.45 Cr

57% of allocation
Above median (37%)

Works completed

104

65% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP160 works

    ₹12.56 Cr · 84% of the ₹14.93 Cr allocated

  2. Sanctioned by the district159 works

    99% sanctioned · took 8 days on average (due within 45 days)

  3. Completed104 works

    ₹8.20 Cr final cost · 4.6 months from recommendation on average

1 works are still awaiting sanction.

In plain words

What the numbers say

  • Recommended 160 works worth ₹12.56 Cr, a fund utilisation of 84%, higher than 63% of 18th Lok Sabha MPs.
  • The district has sanctioned 159 of them, taking 8 days on average.
  • ₹8.45 Cr has been paid to vendors, 57% of the allocation.
  • 104 works are complete, typically 4.6 months after recommendation. 99 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Community buildings & public spaces.
  • Payments went to 7 vendors. The largest received 36%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 79/100: finishing works counts most

  1. Works completed 30%65Completed ÷ recommended works.
  2. Spending efficiency 20%97Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%84Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%95Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%57Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    80
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: VISHWANATH ENTERPRISES, 36% of payments across 7 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

160 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • ward-7 antargat pandit hotel ke pas me yatri pratishalay ka nirman karya

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Kanpur Nagar· #315132

    ₹8.0 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • barra 8 me e-142 ke samne park me interlocking pathway ka nirman karya length 14m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315133

    ₹2.7 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • barra 8 me b 1/251 ke samne interlocking road ka nirman karya length 47m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315134

    ₹3.8 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • rampuram shyam nagar me h.no. 154 shri krishna ke makan se h.no. 149 gaya prasad yadav ke makan tak interlocking road ka nirman karya length 75m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315135

    ₹6.1 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • satbari road sanu general store se raju sengar ke makan tak interlocking road ka nirman karya length 50m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315136

    ₹4.7 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • jone 6 ward-8 maswanpur me h.no. 33a ravi ke makan se h.no. 17 sandeep katiyar ke makan tak interlocking road ka nirman karya length 180m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315137

    ₹16.9 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • janpad kanpur nagar ke 8 vibhinna sthano par 80leter ke water cooler ke apurti adhisthapan ka karya

    Drinking waterInstalling community drinking water plants· Kanpur Nagar· #315138

    ₹13.3 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • jone 5 ward 34 barra 3 siddheswar park me tin shed ka nirman karya.

    Community buildings & public spacesConstruction of common work sheds / common covered sitting area· Kanpur Nagar· #315139

    ₹13.1 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • jone 5 ward 93 govind nagar me building no. 20 ke samne sahid udham singh park me interlocking road ka nirman karya. Length 65m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315140

    ₹5.2 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • rajeen nagar me h.no. 79 lallan bajpai ke makan se 21 d surya prakash ke makan tak cc road ka nirman karya. Length 20m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315141

    ₹2.2 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • rajeev nagar me sakun guest house se changai bhawan tak cc road ka nirman karya. Length 40m

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Kanpur Nagar· #315142

    ₹1.4 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • phool bagh sthit chaurahe par samudaik surakhsha kach ka sundari karan ka karya.

    Community buildings & public spacesConstruction of community centers and community halls· Kanpur Nagar· #315143

    ₹3.0 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • vidhan sabha govind nagar ke antargat vibhinna sthano par 60 nag stainless steel bench ka adhisthapan karya.

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Kanpur Nagar· #315144

    ₹24.1 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • vidhan sabha kidwai nagar ke antargat vibhinna sthano par 60 nag stainless steel bench ka adhisthapan karya.

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Kanpur Nagar· #315145

    ₹24.1 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026
  • vidhan sabha cant ke antargat vibhinna sthano par 45 nag stainless steel bench ka adhisthapan karya.

    Community buildings & public spacesFitting of sitting RCC Benches in public places· Kanpur Nagar· #315146

    ₹18.1 L Sanctioned · 24 Sept 2026Rec. 18 Sep 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.