Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Virendra Singh

Lok SabhaSPChandauli · Uttar Pradesh

MP score70/10089th of 542 in the 18th Lok Sabha
19th of 80 from Uttar Pradesh
Also an MP in the 17th Lok Sabha Then: 99% utilisation, 31 works completed, score 66.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

75%

₹11.00 Cr recommended · 33 works
About the median

Paid to vendors

₹9.50 Cr

65% of allocation
Above median (37%)

Works completed

16

48% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP33 works

    ₹11.00 Cr · 75% of the ₹14.70 Cr allocated

  2. Sanctioned by the district29 works

    88% sanctioned · took 39 days on average (due within 45 days)

  3. Completed16 works

    ₹6.22 Cr final cost · 6.0 months from recommendation on average

4 works are still awaiting sanction, 4 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 33 works worth ₹11.00 Cr, a fund utilisation of 75%, higher than 48% of 18th Lok Sabha MPs.
  • The district has sanctioned 29 of them, taking 39 days on average.
  • ₹9.50 Cr has been paid to vendors, 65% of the allocation.
  • 16 works are complete, typically 6.0 months after recommendation. 16 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 14 vendors. The largest received 21%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 70/100: finishing works counts most

  1. Works completed 30%48Completed ÷ recommended works.
  2. Spending efficiency 20%65Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%75Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%65Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    98
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Aaradhya Enterprises, 21% of payments across 14 vendors.

District sanction speed

94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

33 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of wrestling mats and wrestling mat covers at the Late Mekhudi Pehalwan Gymnasium Gram Sabha Ahrak Ramaipatti District Varanasi Assembly Constituency Ajgara

    Sports & fitnessProviding sports equipment, except consumable items· Varanasi· #277918

    ₹5.8 L Completed 7 Oct 2026Rec. 10 Apr 2026Paid ₹5.8 L
  • Installation of semi high mast lights

    Electricity & lightingLighting of public spaces· Varanasi· #258733

    ₹4.8 L Completed 29 Sept 2026Rec. 12 Jan 2026Paid ₹4.8 L
  • Installation of 41 Semi high mast lights in different gram sabhas

    Electricity & lightingLighting of public spaces· Varanasi· #315155

    ₹68.7 L Awaiting sanction · 47 daysRec. 15 Sep 2026
  • Construction of an interlocking pavement from Shankars house to Chandrabalis house in Gram Sabha Gahura Harhua Development Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277445

    ₹1.5 L Completed 25 Aug 2026Rec. 4 Apr 2026Paid ₹1.5 L
  • Construction of an interlocking pavement from the main road to Phoolchand Yadav house in Gram Sabha Ugapur Cholapur Development Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277923

    ₹1.2 L Completed 25 Aug 2026Rec. 10 Apr 2026Paid ₹1.2 L
  • Interlocking construction work from near the Chaura Mata Temple to Guddu Chauhan house in Gram Sabha Jariyari Cholapur Development Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277926

    ₹9.0 L Completed 25 Aug 2026Rec. 10 Apr 2026Paid ₹9.0 L
  • Construction of an interlocking pavement from the CC road to Ramesh Singhs house in Gram Sabha Pashchimpura Pindra Development Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277917

    ₹9.1 L Completed 22 Aug 2026Rec. 10 Apr 2026Paid ₹9.1 L
  • Construction of an interlocking pavement from Dharmendra Yadav landholding to the vicinity of the Chiurapur Pond in Gram Sabha Chiurapur Pindra Development Block

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277920

    ₹4.6 L Completed 21 Aug 2026Rec. 10 Apr 2026Paid ₹4.6 L
  • Installation of three semi high mast lights in padaav and dhapari

    Electricity & lightingLighting of public spaces· Chandauli· #305069

    ₹7.1 L Awaiting sanction · 75 daysRec. 18 Aug 2026
  • Block Niyamatabad gram sabha Rohara me barat ghar ke avshes boundrywall evam gate ka nirman karya

    Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Chandauli· #292082

    ₹9.5 L Sanctioned · 27 Jul 2026Rec. 4 Jul 2026
  • Block sakaldiha, Niyamatabad tehsil parishar evam chandauli kachahari parishar me water cooler lagane ka karya

    Drinking waterInstalling community drinking water plants· Chandauli· #292089

    ₹4.7 L Sanctioned · 27 Jul 2026Rec. 4 Jul 2026
  • Block chandauli kachahri parishar me water cooler lagane ka karya

    Drinking waterInstalling community drinking water plants· Chandauli· #292091

    ₹1.6 L Sanctioned · 27 Jul 2026Rec. 4 Jul 2026
  • Installation of semi high mast light in different villages of chandauli district

    Electricity & lightingLighting of public spaces· Chandauli· #295272

    ₹1.45 Cr Work partially Completed · 27 Jul 2026Rec. 15 Jul 2026Paid ₹1.45 Cr
  • Installation of Wrestling Mats and Wrestling Mat Covers at the Late Kedar Pehelwan Gymnasium Gram Sabha Baniapur Rajanhaiya Bawanbigha District Varanasi

    Sports & fitnessProviding sports equipment, except consumable items· Varanasi· #277919

    ₹6.0 L Sanctioned · 14 May 2026Rec. 10 Apr 2026
  • Semi High Mast light

    Electricity & lightingLighting of public spaces· Chandauli· #258731

    ₹1.9 L Sanctioned · 7 Apr 2026Rec. 12 Jan 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.