Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
75%
₹11.00 Cr recommended · 33 works
About the median
Paid to vendors
₹9.50 Cr
65% of allocation
Above median (37%)
Works completed
16
48% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP33 works
₹11.00 Cr · 75% of the ₹14.70 Cr allocated
- Sanctioned by the district29 works
88% sanctioned · took 39 days on average (due within 45 days)
- Completed16 works
₹6.22 Cr final cost · 6.0 months from recommendation on average
4 works are still awaiting sanction, 4 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 33 works worth ₹11.00 Cr, a fund utilisation of 75%, higher than 48% of 18th Lok Sabha MPs.
- The district has sanctioned 29 of them, taking 39 days on average.
- ₹9.50 Cr has been paid to vendors, 65% of the allocation.
- 16 works are complete, typically 6.0 months after recommendation. 16 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 14 vendors. The largest received 21%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 70/100: finishing works counts most
- Works completed 30%48Completed ÷ recommended works.
- Spending efficiency 20%65Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%75Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%65Paid to vendors ÷ allocated limit.
- Vendor diversity 10%98How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Aaradhya Enterprises, 21% of payments across 14 vendors.
District sanction speed
94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
33 works · tap “Photos” to see geo-tagged photos from eSAKSHI
Installation of wrestling mats and wrestling mat covers at the Late Mekhudi Pehalwan Gymnasium Gram Sabha Ahrak Ramaipatti District Varanasi Assembly Constituency Ajgara
Sports & fitnessProviding sports equipment, except consumable items· Varanasi· #277918
₹5.8 L Completed 7 Oct 2026Rec. 10 Apr 2026Paid ₹5.8 LInstallation of semi high mast lights
Electricity & lightingLighting of public spaces· Varanasi· #258733
₹4.8 L Completed 29 Sept 2026Rec. 12 Jan 2026Paid ₹4.8 LInstallation of 41 Semi high mast lights in different gram sabhas
Electricity & lightingLighting of public spaces· Varanasi· #315155
₹68.7 L Awaiting sanction · 47 daysRec. 15 Sep 2026Construction of an interlocking pavement from Shankars house to Chandrabalis house in Gram Sabha Gahura Harhua Development Block
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277445
₹1.5 L Completed 25 Aug 2026Rec. 4 Apr 2026Paid ₹1.5 LConstruction of an interlocking pavement from the main road to Phoolchand Yadav house in Gram Sabha Ugapur Cholapur Development Block
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277923
₹1.2 L Completed 25 Aug 2026Rec. 10 Apr 2026Paid ₹1.2 LInterlocking construction work from near the Chaura Mata Temple to Guddu Chauhan house in Gram Sabha Jariyari Cholapur Development Block
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277926
₹9.0 L Completed 25 Aug 2026Rec. 10 Apr 2026Paid ₹9.0 LConstruction of an interlocking pavement from the CC road to Ramesh Singhs house in Gram Sabha Pashchimpura Pindra Development Block
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277917
₹9.1 L Completed 22 Aug 2026Rec. 10 Apr 2026Paid ₹9.1 LConstruction of an interlocking pavement from Dharmendra Yadav landholding to the vicinity of the Chiurapur Pond in Gram Sabha Chiurapur Pindra Development Block
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #277920
₹4.6 L Completed 21 Aug 2026Rec. 10 Apr 2026Paid ₹4.6 LInstallation of three semi high mast lights in padaav and dhapari
Electricity & lightingLighting of public spaces· Chandauli· #305069
₹7.1 L Awaiting sanction · 75 daysRec. 18 Aug 2026Block Niyamatabad gram sabha Rohara me barat ghar ke avshes boundrywall evam gate ka nirman karya
Community buildings & public spacesConstruction of boundary walls of existing public and community buildings· Chandauli· #292082
₹9.5 L Sanctioned · 27 Jul 2026Rec. 4 Jul 2026Block sakaldiha, Niyamatabad tehsil parishar evam chandauli kachahari parishar me water cooler lagane ka karya
Drinking waterInstalling community drinking water plants· Chandauli· #292089
₹4.7 L Sanctioned · 27 Jul 2026Rec. 4 Jul 2026Block chandauli kachahri parishar me water cooler lagane ka karya
Drinking waterInstalling community drinking water plants· Chandauli· #292091
₹1.6 L Sanctioned · 27 Jul 2026Rec. 4 Jul 2026Installation of semi high mast light in different villages of chandauli district
Electricity & lightingLighting of public spaces· Chandauli· #295272
₹1.45 Cr Work partially Completed · 27 Jul 2026Rec. 15 Jul 2026Paid ₹1.45 CrInstallation of Wrestling Mats and Wrestling Mat Covers at the Late Kedar Pehelwan Gymnasium Gram Sabha Baniapur Rajanhaiya Bawanbigha District Varanasi
Sports & fitnessProviding sports equipment, except consumable items· Varanasi· #277919
₹6.0 L Sanctioned · 14 May 2026Rec. 10 Apr 2026Semi High Mast light
Electricity & lightingLighting of public spaces· Chandauli· #258731
₹1.9 L Sanctioned · 7 Apr 2026Rec. 12 Jan 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.