MPLADS report card · 18th Lok Sabha

Tanuj Punia

Lok SabhaINCSC seatBarabanki · Uttar Pradesh

MP score55/100295th of 542 in the 18th Lok Sabha
56th of 80 from Uttar Pradesh
  • Payments concentrated with one vendor

    89% of vendor payments went to Praharsh Infrastructure.

Allocated limit

₹14.82 Cr

Median ₹14.70 Cr

Fund utilisation

83%

₹12.26 Cr recommended · 33 works
Above median (76%)

Paid to vendors

₹10.10 Cr

68% of allocation
Above median (37%)

Works completed

16

48% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP33 works

    ₹12.26 Cr · 83% of the ₹14.82 Cr allocated

  2. Sanctioned by the district30 works

    91% sanctioned · took 3.3 months on average (due within 45 days)

  3. Completed16 works

    ₹7.12 Cr final cost · 8.6 months from recommendation on average

3 works are still awaiting sanction, 3 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 33 works worth ₹12.26 Cr, a fund utilisation of 83%, higher than 60% of 18th Lok Sabha MPs.
  • The district has sanctioned 30 of them, taking 3.3 months on average.
  • ₹10.10 Cr has been paid to vendors, 68% of the allocation.
  • 16 works are complete, typically 8.6 months after recommendation. 6 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 4 vendors. The largest received 89%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 55/100: finishing works counts most

  1. Works completed 30%48Completed ÷ recommended works.
  2. Spending efficiency 20%71Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%83Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%38Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%68Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    14
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: Praharsh Infrastructure, 89% of payments across 4 vendors.

District sanction speed

87/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%87Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

33 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • supply and installation of 33 Highmast lights in various places of Barabanki Lok Sabha

    Electricity & lightingLighting of public spaces· Bara Banki· #298371

    ₹69.1 L Vendor Identification · 22 Oct 2026Rec. 23 Jul 2026Paid ₹69.0 L
  • supply and installation of 215 Solar lights in many areas of Banki, Deva, Mahadeva, Ramnagar in Barabanki Lok Sabha

    Electricity & lightingLighting of public spaces· Bara Banki· #279577

    ₹46.2 L Work partially Completed · 15 Oct 2026Rec. 4 May 2026Paid ₹46.2 L
  • Supply and installation of 60 Highmast light in many areas of Barabanki constituency

    Electricity & lightingLighting of public spaces· Bara Banki· #238655

    ₹1.20 Cr Completed 8 Sept 2026Rec. 27 Sep 2025Paid ₹1.20 Cr
  • supply and installation of 61 Highmast lights in many areas of Barabanki Lok Sabha

    Electricity & lightingLighting of public spaces· Bara Banki· #258118

    ₹1.22 Cr Completed 8 Sept 2026Rec. 8 Jan 2026Paid ₹1.22 Cr
  • Supply and installation of 43 Highmast lights in many areas of barabanki lok sabha

    Electricity & lightingLighting of public spaces· Bara Banki· #274517

    ₹85.9 L Completed 8 Sept 2026Rec. 16 Mar 2026Paid ₹85.9 L
  • Supply and installation of 50 highmast lights in many areas of Barabanki Lok Sabha

    Electricity & lightingLighting of public spaces· Bara Banki· #298370

    ₹1.05 Cr Awaiting sanction · 101 daysRec. 23 Jul 2026
  • Construction of 200 Meter CC road in Shuklai Village of Banki from Ayodhya Road to the Farm of Manoj Yadav BDC

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bara Banki· #279661

    ₹36.4 L Physical Inspection · 3 Jul 2026Rec. 5 May 2026Paid ₹36.4 L
  • Construction of 200 Meter CC road in Shuklai Village of Banki from Link Road to Plot of Tanya Verma

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bara Banki· #279662

    ₹36.4 L Work partially Completed · 3 Jul 2026Rec. 5 May 2026Paid ₹36.3 L
  • Construction of Interlocking Pavement and Drainage System from Vijaypal Gautam House to the Road in Jeetnagar Locality, Nagar Panchayat Banki.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bara Banki· #279668

    ₹3.2 L Work partially Completed · 3 Jul 2026Rec. 5 May 2026Paid ₹3.2 L
  • Construction of drainage approximately 200 meters on both sides of the road in Thakurampurwa Majre Mohammadpur Bahun within the Sirauli Gauspur Development Block, extending from the main road along the edge of the orchard into the interior of the village.

    Sanitation & drainageProviding drains and gutters for public drainage· Bara Banki· #279669

    ₹9.2 L Work partially Completed · 3 Jul 2026Rec. 5 May 2026Paid ₹9.2 L
  • Construction of Interlocking Pavement and Drainage System from Rahul Verma House to Israuli Road in Village Bibipur, Siddhaur Development Block (Distance 40 meters).

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bara Banki· #279670

    ₹2.9 L Work partially Completed · 3 Jul 2026Rec. 5 May 2026Paid ₹2.9 L
  • Municipal Council, Dasherabagh, Ward 9, Deendayal Nagar, Construction of paved drains on both sides from the residence of Vikram Singh Yadav to the residence of Kamlesh Rastogi covering a distance of approximately 220 meters

    Sanitation & drainageProviding drains and gutters for public drainage· Bara Banki· #279671

    ₹1.3 L Sanctioned · 3 Jul 2026Rec. 5 May 2026
  • Supply and Installation of 201 Solar Lights in many areas of Barabanki District

    Electricity & lightingLighting of public spaces· Bara Banki· #287866

    ₹45.2 L Awaiting sanction · 133 daysRec. 21 Jun 2026
  • Supply and Installation of 244 Solar Lights in many areas of Barabanki Lok Sabha

    Electricity & lightingLighting of public spaces· Bara Banki· #287867

    ₹54.8 L Awaiting sanction · 133 daysRec. 21 Jun 2026
  • construction of boundrywall of ambedkar park in village husainabad in block trivediganj

    Community buildings & public spacesDevelopment of public parks· Bara Banki· #197203

    ₹25.3 L Physical Inspection · 20 Apr 2026Rec. 6 May 2025Paid ₹25.3 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.