Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
87%
₹12.78 Cr recommended · 126 works
Above median (76%)
Paid to vendors
₹8.63 Cr
59% of allocation
Above median (37%)
Works completed
54
43% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP126 works
₹12.78 Cr · 87% of the ₹14.70 Cr allocated
- Sanctioned by the district85 works
67% sanctioned · took 3.4 months on average (due within 45 days)
- Completed54 works
₹6.03 Cr final cost · 13.1 months from recommendation on average
41 works are still awaiting sanction, 41 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 126 works worth ₹12.78 Cr, a fund utilisation of 87%, higher than 68% of 18th Lok Sabha MPs.
- The district has sanctioned 85 of them, taking 3.4 months on average.
- ₹8.63 Cr has been paid to vendors, 59% of the allocation.
- 54 works are complete, typically 13.1 months after recommendation. 52 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 25 vendors. The largest received 34%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 68/100: finishing works counts most
- Works completed 30%43Completed ÷ recommended works.
- Spending efficiency 20%70Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%87Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%96Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%59Paid to vendors ÷ allocated limit.
- Vendor diversity 10%82How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: MS AMAR MANI TRIPATHI, 34% of payments across 25 vendors.
District sanction speed
75/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%75Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
126 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Vikas khand - Gauri Bazar, gram sabha - kalaban men guruch ghat pitch road se rajaram ke ghar tak CC road ka nirman kary lagbhag 180 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #215169
₹16.3 L Completed 6 Oct 2026Rec. 5 Jul 2025Paid ₹16.3 LGram- Rampur (Dubey) me Ashok Mani ke ghar se Degree Singh ke ghar hote hue Deepak Mani ke Jameen tak 170 mtr. mitti evam khadanja nirmaan
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #145470
₹4.8 L Completed 28 Sept 2026Rec. 12 Oct 2024Paid ₹4.8 LVikas Khand - Pathardewa, Gram Sabha - Medi Patti me Sunil rai ke ghar se Pitch Road tak CC road ka nirmaan lagbhag 150 mtr.
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #165149
₹11.7 L Completed 28 Sept 2026Rec. 13 Jan 2025Paid ₹11.7 LVikas Khand - Bhatni, Gram sabha - Singhidih men vishnudeo thakur ke ghar se shivmandir tak CC Road ka nirman kary lagbhag 170 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #215167
₹12.1 L Completed 28 Sept 2026Rec. 5 Jul 2025Paid ₹12.1 LGram sabha - Latwa Muralidhar me 25 kva ka navin transformer sthapit karna
Electricity & lightingImprovement of electricity distribution infrastructure· Kushinagar· #294554
₹3.0 L Vendor Identification · 9 Sept 2026Rec. 13 Jul 2026Paid ₹2.2 LVikas Khand - Baitalpur, Gram Sabha - Boria Anant men chat ghat se pokhre ke pas pitch sadak se harendra rao ke khet tak CC Road ka nirmaan kary lagbhag 130x3 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #206892
₹11.2 L Completed 5 Sept 2026Rec. 24 Jun 2025Paid ₹11.2 LVikas Khand - Deoria, Gram sabha - Baida kuwar deoria me pitch road se satendra Mishra ke ghar tak CC Road ka Nirmaan kary lagbhag 190x3 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #206893
₹13.6 L Completed 5 Sept 2026Rec. 24 Jun 2025Paid ₹13.6 LVikas Khand - Deoria Sadar, Pata - ramnath deoria dakshini, tiger mani ke makaan se dhanesh sriwastav ke gate tak CC Road ka nirmaan kary lagbhag 45 x 2.77, 33 x 3, 12 x 2 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #206894
₹6.8 L Completed 5 Sept 2026Rec. 24 Jun 2025Paid ₹6.8 LVikas khand - Rampur Karkhana, Gram sabha - Sirsia men pitch road se surendra Singh ke ghota exam ambedkar park ki taraf CC Road ka nirman kary lagbhag 165 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #215171
₹12.2 L Completed 5 Sept 2026Rec. 5 Jul 2025Paid ₹12.2 LVikas Khand-Pathardewa, Gram-Sakatua Khurd me pitch road se puliya tak CC road ka nirmaan karya lambai lagbhag 160 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #241677
₹11.1 L Completed 5 Sept 2026Rec. 13 Oct 2025Paid ₹11.1 LGram Sabha - Chaumukha, post- Hatha Banwari, Ramdhyan Tiwari ke ghar se Vishnudev Chaubey ke ghar tak CC road ka nirmaan kary lambai lagbhag 160x3.0 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #302093
₹10.4 L Awaiting sanction · 72 daysRec. 21 Aug 2026Gram Sabha - Saraura(tiwari tola) , post- Katrari, Guddu tiwari ke ghar se Lalit tiwari ke ghar tak CC road ka nirmaan kary lambai lagbhag 55 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #302094
₹5.1 L Awaiting sanction · 72 daysRec. 21 Aug 2026Gram Sabha - Jungle Thakurahi, Panchayat Bhawan se Kuldev Mishra ke ghar tak CC road ka nirmaan kary lambai lagbhag 110x3.2 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #302095
₹8.9 L Awaiting sanction · 72 daysRec. 21 Aug 2026Gram Sabha - Baltikra me purv pradhan Udaybhan Ji ke ghar se Subhash Chauhan Ji ke ghar tak CC road ka nirmaan kary lambai lagbhag 175x3.10 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #302096
₹14.5 L Awaiting sanction · 72 daysRec. 21 Aug 2026Gram Sabha - Mahuadih me Ramnath Singh ke ghar se Parmeshwar Upadhyay ke ghar tak CC road ka nirmaan kary lambai lagbhag 180x3.10 meters
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Deoria· #302097
₹14.0 L Awaiting sanction · 72 daysRec. 21 Aug 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.