MP score50/100359th of 542 in the 18th Lok Sabha
62nd of 80 from Uttar Pradesh
  • Works waiting for sanction

    278 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.

  • Payments concentrated with one vendor

    72% of vendor payments went to ARVIND KUMAR PANDEY.

Allocated limit

₹18.04 Cr

Median ₹14.70 Cr

Fund utilisation

97%

₹17.56 Cr recommended · 686 works
Above median (76%)

Paid to vendors

₹9.83 Cr

54% of allocation
Above median (37%)

Works completed

115

17% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP686 works

    ₹17.56 Cr · 97% of the ₹18.04 Cr allocated

  2. Sanctioned by the district350 works

    51% sanctioned · took 6.3 months on average (due within 45 days)

  3. Completed115 works

    ₹5.73 Cr final cost · 17.3 months from recommendation on average

336 works are still awaiting sanction, 278 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 686 works worth ₹17.56 Cr, a fund utilisation of 97%, higher than 88% of 18th Lok Sabha MPs.
  • The district has sanctioned 350 of them, taking 6.3 months on average.
  • ₹9.83 Cr has been paid to vendors, 54% of the allocation.
  • 115 works are complete, typically 17.3 months after recommendation. 74 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 9 vendors. The largest received 72%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 50/100: finishing works counts most

  1. Works completed 30%17Completed ÷ recommended works.
  2. Spending efficiency 20%58Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%97Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%64Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%54Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    35
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: ARVIND KUMAR PANDEY, 72% of payments across 9 vendors.

District sanction speed

57/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%57Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

686 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148345

    ₹2.2 L Completed 15 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148351

    ₹2.2 L Completed 15 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148356

    ₹2.2 L Completed 15 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148368

    ₹2.2 L Completed 15 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Construction of Interlocking Road In Gram Panchayat Panditpura, From Salempur Lakhmi Canal to Achyutanand Chaturvedi House – 140 mtr Revised Letter Attached

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghazipur· #148474

    ₹6.9 L Completed 15 Oct 2026Rec. 21 Oct 2024Paid ₹6.9 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter.

    Electricity & lightingStreet lights· Ballia· #148713

    ₹2.2 L Completed 15 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter.

    Electricity & lightingStreet lights· Ballia· #148715

    ₹2.2 L Completed 15 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148338

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148339

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148340

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148341

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148342

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148343

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148344

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L
  • Installation of Semi High Mast Lights at different places as per attached recommendation letter

    Electricity & lightingStreet lights· Ballia· #148346

    ₹2.2 L Completed 13 Oct 2026Rec. 21 Oct 2024Paid ₹2.2 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.