Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Ram Prasad Chaudhary

Lok SabhaSPBasti · Uttar Pradesh

MP score54/100299th of 542 in the 18th Lok Sabha
57th of 80 from Uttar Pradesh
  • Payments concentrated with one vendor

    78% of vendor payments went to JAI CONSTRUCTION.

Allocated limit

₹20.42 Cr

Median ₹14.70 Cr

Fund utilisation

99%

₹20.23 Cr recommended · 186 works
Above median (76%)

Paid to vendors

₹16.12 Cr

79% of allocation
Above median (37%)

Works completed

37

20% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP186 works

    ₹20.23 Cr · 99% of the ₹20.42 Cr allocated

  2. Sanctioned by the district174 works

    94% sanctioned · took 2.0 months on average (due within 45 days)

  3. Completed37 works

    ₹6.39 Cr final cost · 12.0 months from recommendation on average

12 works are still awaiting sanction, 12 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 186 works worth ₹20.23 Cr, a fund utilisation of 99%, higher than 93% of 18th Lok Sabha MPs.
  • The district has sanctioned 174 of them, taking 2.0 months on average.
  • ₹16.12 Cr has been paid to vendors, 79% of the allocation.
  • 37 works are complete, typically 12.0 months after recommendation. 37 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 17 vendors. The largest received 78%.
  • Citizens rated completed works 1.0 / 5 on average (1 rated works).

How the score is made

MP score 54/100: finishing works counts most

  1. Works completed 30%20Completed ÷ recommended works.
  2. Spending efficiency 20%40Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%99Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%79Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    27
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: JAI CONSTRUCTION, 78% of payments across 17 vendors.

District sanction speed

94/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%94Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

186 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Construction of a CC road from the CC road to the remaining portion of Tinich Shukla in Gram Panchayat Belvadar, approximately 130 meters, Block Saltoua Gopalpur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284126

    ₹11.3 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Remaining portion of the CC Road in village Thathiauna, CC Road construction work, approximately 80 meters, Block-Gaur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284132

    ₹7.3 L Vendor Identification · 17 Sept 2026Rec. 27 May 2026Paid ₹5.5 L
  • In the village Panchayat Gudi, from the CC road to Hiralal of house, a distance of approximately 150 meters, Block-Bankati.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284135

    ₹12.0 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Construction of a CC road from the Sardar Vallabhbhai Patel Inter College to the colony, approximately 200 meters away, Block-Saughat.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284136

    ₹29.1 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Construction of a CC road from Chhote Lal Chaudhary of house in Nagara Boudihar, approximately 120 meters away, Block- Bankati.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284137

    ₹15.1 L Vendor Identification · 17 Sept 2026Rec. 27 May 2026Paid ₹11.2 L
  • Construction of a CC road from the Gonaha Halwa road to the village of Gonaha Yadav Purva, approximately 200 meters away, Block-Gaur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284138

    ₹15.8 L Vendor Identification · 17 Sept 2026Rec. 27 May 2026Paid ₹11.8 L
  • Construction of a CC road from Khaderu of house in Purva Marwatia in the Belwaria Jungle Gram Panchayat to the house of Barsaati, approximately 200 meters away, Block-Gaur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284139

    ₹17.8 L Vendor Identification · 17 Sept 2026Rec. 27 May 2026Paid ₹13.3 L
  • Construction of a CC road from the pitch road to Ram Kewal of house in Gram Panchayat Khajuria Mishra, approximately 300 meters, Block- Kaptanganj.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284141

    ₹24.8 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Construction of a CC road from Siktihwa village to Nagveer on the Maharajganj Dubaulia road, approximately 300 meters away, Block-Dubaulia.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284142

    ₹24.8 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Construction of a CC road between Khalgawa Lohar Purva, adjacent to Sawdeeh Krishak Small School, approximately 300 meters long, Block-Gaur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284143

    ₹28.2 L Vendor Identification · 17 Sept 2026Rec. 27 May 2026Paid ₹20.4 L
  • From Basuapaar Battupur Pitch Road to Basuapaar Purva, the CC road construction work is approximately 150 meters long, Vikaskhand-Kaptanganj.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284144

    ₹11.0 L Vendor Identification · 17 Sept 2026Rec. 27 May 2026Paid ₹8.2 L
  • From Dubaula Pachpedwa Road to Ayodhya Prasad Verma of house in village Belsad, CC road construction work of the road, distance approximately 150 meters, Vikas Khand-Gaur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284145

    ₹14.0 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Construction of a CC road from Ama Tinich Ama Road to the graveyard, approximately 200 meters long, Block Saltua Gopalpur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284146

    ₹15.8 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Construction of a CC road from Raikwar (Sikri) to Kanikapur, approximately 300 meters long, Block-Gaur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284147

    ₹25.8 L Sanctioned · 17 Sept 2026Rec. 27 May 2026
  • Construction of CC road from Majhowa Dudhnath Gobhiya Marg to Pipra Kapuri Panchayat Bhawan, distance approximately 250 meters, Block-Gaur.

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Basti· #284148

    ₹21.1 L Sanctioned · 17 Sept 2026Rec. 27 May 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.