Works waiting for sanction
67 recommended works are still awaiting sanction more than 45 days later. Sanction is the district authority’s responsibility.
Payments concentrated with one vendor
69% of vendor payments went to TECHKRITI INFRATECH PVT LTD.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
66%
₹9.64 Cr recommended · 142 works
Below median (76%)
Paid to vendors
₹4.36 Cr
30% of allocation
Below median (37%)
Works completed
16
11% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP142 works
₹9.64 Cr · 66% of the ₹14.70 Cr allocated
- Sanctioned by the district71 works
50% sanctioned · took 6.5 months on average (due within 45 days)
- Completed16 works
₹1.09 Cr final cost · 13.9 months from recommendation on average
71 works are still awaiting sanction, 67 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 142 works worth ₹9.64 Cr, a fund utilisation of 66%, higher than 32% of 18th Lok Sabha MPs.
- The district has sanctioned 71 of them, taking 6.5 months on average.
- ₹4.36 Cr has been paid to vendors, 30% of the allocation.
- 16 works are complete, typically 13.9 months after recommendation. 1 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 7 vendors. The largest received 69%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 26/100: finishing works counts most
- Works completed 30%11Completed ÷ recommended works.
- Spending efficiency 20%25Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%66Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%6Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%30Paid to vendors ÷ allocated limit.
- Vendor diversity 10%39How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: TECHKRITI INFRATECH PVT LTD, 69% of payments across 7 vendors.
District sanction speed
53/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%53Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
142 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
gram kitholi me shyamlal ke khet se pani ki tanki tak khadanja nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #323867
₹4.0 L Awaiting sanction · 10 daysRec. 22 Oct 2026gram aurangabad dateri me main road se abalpur byepass ki taraf interlocking or nali nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #320378
₹4.0 L Awaiting sanction · 26 daysRec. 6 Oct 2026gram kajampur me rajveer singh porv pardhan ke makan se savinder ke makan tak interlocking ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #320380
₹3.5 L Awaiting sanction · 26 daysRec. 6 Oct 2026gram sherpur vikas khand bhojpur me sarkari school se rishipal ke ghar tak khadanja nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #320388
₹3.5 L Awaiting sanction · 26 daysRec. 6 Oct 2026gram aurangabad dateri vikas khand bhojpur me main road se abulapur baipass tak interlocking tiles ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #313814
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026vikas khan bhojpur ki gram panchayat joya me chamunda mandir ke pass sushil tevatiya ke makan se talab tak interlocking tiles ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #313815
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026modinagar nizampur sikri khurd me madanlal ke khet se chawan ki tubell tak khadanja nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #313816
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026gram panchayat kajampur me rajveer singh ke makan se somender ke makan ki or interlocking tiles ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #313817
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026gram churiyala me mandir ke dakshin se mandir ke uttari kone tak interlocking tile ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #313818
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026modinagar ke patla me dholdi road per choudhary charan singh ismarak inter college ke pass khadenja ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ghaziabad· #313819
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026vikas khand rohta ke antergat rohta sardhna marg per devkoti mandir se amarjeet ke khet tak khadenje ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #313820
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026gram patholi me deshpal pardhan ji ke khet se krishanpal ke khet tak khadanja nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #313821
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026gram ukasia me jagat singh ke khet ke pass khadenje ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #313822
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026gram rohta me kutti marg se or bhagwan sharma ke khet se badam sampark marg tak khadnje ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #313823
₹4.0 L Awaiting sanction · 52 daysRec. 10 Sep 2026gram samaspur surani vikas khand daurala me vedpal pardhan ji khet se rajvahe ki pakki nali tak khadenje ka nirman karya
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Meerut· #313824
₹3.5 L Awaiting sanction · 52 daysRec. 10 Sep 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.