Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Rajeev Rai

Lok SabhaSPGhosi · Uttar Pradesh

MP score61/100207th of 542 in the 18th Lok Sabha
40th of 80 from Uttar Pradesh

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

84%

₹12.35 Cr recommended · 332 works
Above median (76%)

Paid to vendors

₹6.92 Cr

47% of allocation
Above median (37%)

Works completed

108

33% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP332 works

    ₹12.35 Cr · 84% of the ₹14.70 Cr allocated

  2. Sanctioned by the district210 works

    63% sanctioned · took 5.0 months on average (due within 45 days)

  3. Completed108 works

    ₹3.80 Cr final cost · 14.6 months from recommendation on average

122 works are still awaiting sanction, 53 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 332 works worth ₹12.35 Cr, a fund utilisation of 84%, higher than 63% of 18th Lok Sabha MPs.
  • The district has sanctioned 210 of them, taking 5.0 months on average.
  • ₹6.92 Cr has been paid to vendors, 47% of the allocation.
  • 108 works are complete, typically 14.6 months after recommendation. 91 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 25 vendors. The largest received 21%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 61/100: finishing works counts most

  1. Works completed 30%33Completed ÷ recommended works.
  2. Spending efficiency 20%55Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%84Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%84Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%47Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    99
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BIHARI JI MAHADEV ASSOCIATES, 21% of payments across 25 vendors.

District sanction speed

75/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%75Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

332 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • gram sabha raurachavar (vikas khand rasra): lallan yadav ke ghar se prathmik vidyalaya amhar ki taraf C.C. road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324580

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • gram panchayat maharajpur: chhaththa god ke ghar se shyam lal chauhan ke ghar ke taraf C.C. road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324581

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • gram panchayat kodai: suresh yadav ke ghar se ramchandra ke ghar ke taraf interlocking

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324582

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • nagahar kamsipur: mein sadak se ramvilas ke ghar se aage ki taraf C.C. road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324583

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • rasulpur: pitch road se anil yadav ke ghar hote hue brahambaba prathmik vidyalaya ki taraf C.C. road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324584

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • sabbalpur silhata: pitch road se darshan yadav ke ghar ki taraf interlocking

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324585

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • gram sabha nagpur: pitch road se mulayam yadav ke ghar ki taraf interlocking

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324586

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • gram panchayat kodra (vikas khand chilkahar): hridyanand ke ghar se bharat yadav ke ghar ki taraf naali and C.C road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324587

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • dumari gram sabha: gupta ji ke ghar se mahtab ansari ke ghar ki taraf interlocking

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324588

    ₹6.5 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • gram sabha budhau chilkahar mein si0si0 road se rameshwar singh ke ghar ke taraf C.C. road and naali

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324589

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • gram- pahesar (pakdi harakh basant) late kalika yadav ke ghar se pitch road tak C.C. road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324590

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • gram- nagpur katai mil mein nagpur pitch se munna yadav ke ghar ki taraf interlocking

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324591

    ₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026
  • block dohrighat gram jamunipur dharmu yadav pradhaan ke tubel par

    Electricity & lightingLighting of public spaces· Mau· #324461

    ₹2.3 L Awaiting sanction · 7 daysRec. 25 Oct 2026
  • block dohrighat gram updadiya haripra aadarsh purva madhyamik vidyalaya ke raste ke samne

    Electricity & lightingLighting of public spaces· Mau· #324462

    ₹2.3 L Awaiting sanction · 7 daysRec. 25 Oct 2026
  • block dohrighat gram mahmud saray mahmud saray muslim basti men

    Electricity & lightingLighting of public spaces· Mau· #324463

    ₹2.3 L Awaiting sanction · 7 daysRec. 25 Oct 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.