Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
84%
₹12.35 Cr recommended · 332 works
Above median (76%)
Paid to vendors
₹6.92 Cr
47% of allocation
Above median (37%)
Works completed
108
33% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP332 works
₹12.35 Cr · 84% of the ₹14.70 Cr allocated
- Sanctioned by the district210 works
63% sanctioned · took 5.0 months on average (due within 45 days)
- Completed108 works
₹3.80 Cr final cost · 14.6 months from recommendation on average
122 works are still awaiting sanction, 53 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 332 works worth ₹12.35 Cr, a fund utilisation of 84%, higher than 63% of 18th Lok Sabha MPs.
- The district has sanctioned 210 of them, taking 5.0 months on average.
- ₹6.92 Cr has been paid to vendors, 47% of the allocation.
- 108 works are complete, typically 14.6 months after recommendation. 91 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 25 vendors. The largest received 21%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 61/100: finishing works counts most
- Works completed 30%33Completed ÷ recommended works.
- Spending efficiency 20%55Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%84Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%84Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%47Paid to vendors ÷ allocated limit.
- Vendor diversity 10%99How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: BIHARI JI MAHADEV ASSOCIATES, 21% of payments across 25 vendors.
District sanction speed
75/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%75Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
332 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
gram sabha raurachavar (vikas khand rasra): lallan yadav ke ghar se prathmik vidyalaya amhar ki taraf C.C. road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324580
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026gram panchayat maharajpur: chhaththa god ke ghar se shyam lal chauhan ke ghar ke taraf C.C. road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324581
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026gram panchayat kodai: suresh yadav ke ghar se ramchandra ke ghar ke taraf interlocking
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324582
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026nagahar kamsipur: mein sadak se ramvilas ke ghar se aage ki taraf C.C. road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324583
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026rasulpur: pitch road se anil yadav ke ghar hote hue brahambaba prathmik vidyalaya ki taraf C.C. road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324584
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026sabbalpur silhata: pitch road se darshan yadav ke ghar ki taraf interlocking
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324585
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026gram sabha nagpur: pitch road se mulayam yadav ke ghar ki taraf interlocking
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324586
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026gram panchayat kodra (vikas khand chilkahar): hridyanand ke ghar se bharat yadav ke ghar ki taraf naali and C.C road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324587
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026dumari gram sabha: gupta ji ke ghar se mahtab ansari ke ghar ki taraf interlocking
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324588
₹6.5 L Awaiting sanction · 5 daysRec. 27 Oct 2026gram sabha budhau chilkahar mein si0si0 road se rameshwar singh ke ghar ke taraf C.C. road and naali
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324589
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026gram- pahesar (pakdi harakh basant) late kalika yadav ke ghar se pitch road tak C.C. road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324590
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026gram- nagpur katai mil mein nagpur pitch se munna yadav ke ghar ki taraf interlocking
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Ballia· #324591
₹7.0 L Awaiting sanction · 5 daysRec. 27 Oct 2026block dohrighat gram jamunipur dharmu yadav pradhaan ke tubel par
Electricity & lightingLighting of public spaces· Mau· #324461
₹2.3 L Awaiting sanction · 7 daysRec. 25 Oct 2026block dohrighat gram updadiya haripra aadarsh purva madhyamik vidyalaya ke raste ke samne
Electricity & lightingLighting of public spaces· Mau· #324462
₹2.3 L Awaiting sanction · 7 daysRec. 25 Oct 2026block dohrighat gram mahmud saray mahmud saray muslim basti men
Electricity & lightingLighting of public spaces· Mau· #324463
₹2.3 L Awaiting sanction · 7 daysRec. 25 Oct 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.