Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
52%
₹7.62 Cr recommended · 192 works
Below median (76%)
Paid to vendors
₹3.45 Cr
23% of allocation
Below median (37%)
Works completed
94
49% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP192 works
₹7.62 Cr · 52% of the ₹14.70 Cr allocated
- Sanctioned by the district189 works
98% sanctioned · took 2.4 months on average (due within 45 days)
- Completed94 works
₹1.52 Cr final cost · 12.1 months from recommendation on average
3 works are still awaiting sanction, 3 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 192 works worth ₹7.62 Cr, a fund utilisation of 52%, higher than 14% of 18th Lok Sabha MPs.
- The district has sanctioned 189 of them, taking 2.4 months on average.
- ₹3.45 Cr has been paid to vendors, 23% of the allocation.
- 94 works are complete, typically 12.1 months after recommendation. 91 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 34 vendors. The largest received 19%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 58/100: finishing works counts most
- Works completed 30%49Completed ÷ recommended works.
- Spending efficiency 20%44Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%52Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%97Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%23Paid to vendors ÷ allocated limit.
- Vendor diversity 10%100How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: AADI AND RUDRANSH CONSTRUCTION COMPANY, 19% of payments across 34 vendors.
District sanction speed
95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
192 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Construction of CC road with side drainage from near the residence of Dr. S.M. Singh up to the residence of Mohd. Ishtiyaq, towards the residence of Dhunni Lal (58 meters), at Mohalla Baraipur, near New Galla Mandi, Shahr, Rae Bareli
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #207973
₹2.2 L Completed 15 Oct 2026Rec. 11 Jun 2025Paid ₹2.2 LConstruction of interlocking road from the residence of V.S. Agnihotri up to Saras Bhawan, towards the residence of D.P. Srivastav (170 meters), at Saras Bhawan, Satya Nagar, Ward No. 32, Rae Bareli
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #207974
₹6.5 L Completed 15 Oct 2026Rec. 11 Jun 2025Paid ₹6.5 LConstruction of Interlocking Road at Sardar Patel Nagar, Kailash Mohalla (100 m), near Kailashpuri, Kanpur Road, Rae Bareli
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #202744
₹6.3 L Completed 14 Oct 2026Rec. 23 May 2025Paid ₹6.3 LConstruction of interlocking road from the residence of Prem Prakash Yadav son of Sridhar Yadav to the residence of Kanhaiya Lal Yadav (140 meters) at Gram Kapura, Majre Bijemau, Khiron, Raebareli
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #219223
₹5.4 L Completed 7 Oct 2026Rec. 17 Jul 2025Paid ₹5.4 LInstallation of thirty-two (Sl. No. 1 to 32) solar lights as per the enclosed list.
Electricity & lightingSetting up public non-conventional energy plants· Rae Bareli· #249893
₹6.1 L Completed 7 Oct 2026Rec. 21 Nov 2025Paid ₹6.1 LInstallation of 3 (three) electric highmast lights as per the attached list
Electricity & lightingLighting of public spaces· Rae Bareli· #249895
₹4.8 L Completed 7 Oct 2026Rec. 21 Nov 2025Paid ₹4.8 LInstallation of Eighty-Seven (Sl. No. 1 to 87) solar lights as per the enclosed list.
Electricity & lightingSetting up public non-conventional energy plants· Rae Bareli· #249898
₹16.6 L Completed 7 Oct 2026Rec. 21 Nov 2025Paid ₹16.6 LInstallation of six (Sl. No. 3,4,5,7,8,9) highmast electric lights as per the enclosed list.
Electricity & lightingLighting of public spaces· Rae Bareli· #250553
₹9.6 L Completed 7 Oct 2026Rec. 27 Nov 2025Paid ₹9.6 LInstallation of High Mast Solar Light at Radha Krishna Gowshala Common Place, Village - Chakdadar, Amawan, Raebareli
Electricity & lightingSetting up public non-conventional energy plants· Rae Bareli· #250556
₹1.0 L Completed 7 Oct 2026Rec. 27 Nov 2025Paid ₹1.0 LConstruction of an interlocking road from the residence of Mendilal Gautam to the residence of Ramshankar Nai (ST Colony) (60 mtr) at Village Vishunpur, Bacchrawan
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #277213
₹3.9 L Completed 5 Oct 2026Rec. 1 Apr 2026Paid ₹3.9 LConstruction of a classroom at Harnarayan Inter College, Arkha, Unchahar, on the request of Shri Shivkaran Tiwari, Manager, Mob-9839022000
Education & librariesConstruction of rooms and halls in school and colleges· Rae Bareli· #142468
₹7.0 L Completed 4 Oct 2026Rec. 22 Sep 2024Paid ₹7.0 LConstruction of a classroom at Baba Tiratdas Bal Vidya Mandir, Nandaur Mafi, Payagpur, Rohaniya, Unchahar, Rae Bareli on the request of Shri Shiv Karan Tiwari, Manager, Mob- 9919800542
Education & librariesConstruction of rooms and halls in school and colleges· Rae Bareli· #142476
₹5.0 L Completed 4 Oct 2026Rec. 22 Sep 2024Paid ₹5.0 LSerial No. 7, Construction of an interlocking road from near the residence of Anjani Master to near the residence of Ram Gopal (Length 137 meters, Width 3 meters) at Village Dariba, Sataon, Rae Bareli
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #189455
₹3.3 L Completed 3 Oct 2026Rec. 5 Apr 2025Paid ₹3.3 LConstruction of interlocking road with side drainage from Gokulpur Damar Road near the residence of Kewal up to the residence of Chandrakant Tripathi (105 meters), at Mayur Vihar, backside of Gokulpur Gandhi Ashram, Tripura Chouraha near Lucknow Road
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #207972
₹6.5 L Completed 3 Oct 2026Rec. 11 Jun 2025Paid ₹6.5 LConstruction of interlocking road from near the ITI College Choraha to Village Khojanpur (140 meters) at Gram Khojanpur, Raebareli
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Rae Bareli· #250552
₹7.8 L Completed 3 Oct 2026Rec. 27 Nov 2025Paid ₹7.8 L
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.