MPLADS report card · 18th Lok Sabha

R.K. Chaudhary

Lok SabhaSPSC seatMohanlalganj · Uttar Pradesh

MP score17/100524th of 542 in the 18th Lok Sabha
79th of 80 from Uttar Pradesh
  • Payments concentrated with one vendor

    90% of vendor payments went to SHREE HARIOM INFOTECH.

Allocated limit

₹14.94 Cr

Median ₹14.70 Cr

Fund utilisation

49%

₹7.38 Cr recommended · 93 works
Below median (76%)

Paid to vendors

₹3.69 Cr

25% of allocation
Below median (37%)

Works completed

14

15% of recommended
Below median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP93 works

    ₹7.38 Cr · 49% of the ₹14.94 Cr allocated

  2. Sanctioned by the district78 works

    84% sanctioned · took 2.5 months on average (due within 45 days)

  3. Completed14 works

    ₹30.1 L final cost · 12.9 months from recommendation on average

15 works are still awaiting sanction, 15 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 93 works worth ₹7.38 Cr, a fund utilisation of 49%, higher than 12% of 18th Lok Sabha MPs.
  • The district has sanctioned 78 of them, taking 2.5 months on average.
  • ₹3.69 Cr has been paid to vendors, 25% of the allocation.
  • 14 works are complete, typically 12.9 months after recommendation.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 3 vendors. The largest received 90%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 17/100: finishing works counts most

  1. Works completed 30%15Completed ÷ recommended works.
  2. Spending efficiency 20%8Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%49Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%0Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%25Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    12
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: SHREE HARIOM INFOTECH, 90% of payments across 3 vendors.

District sanction speed

87/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%87Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

93 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Electrification of DR. BHIMRAO AMBEDHKAR SCHOOL SAHPUR According to the document attach

    Electricity & lightingLighting of public spaces· Lucknow· #242278

    ₹2.2 L Time Estimation · 9 Sept 2026Rec. 16 Oct 2025
  • installation of electrical pole and wire according to the letter

    Electricity & lightingImprovement of electricity distribution infrastructure· Lucknow· #259658

    ₹5.5 L Time Estimation · 9 Sept 2026Rec. 18 Jan 2026
  • Installation of 140 lights according to the list attached

    Electricity & lightingLighting of public spaces· Lucknow· #264186

    ₹28.6 L Sanctioned · 27 Aug 2026Rec. 31 Jan 2026
  • Construction of RCC interlocking boundary wall according to the list, installation of four way solar street light according to the list attached

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #277142

    ₹76.9 L Sanctioned · 27 Aug 2026Rec. 31 Mar 2026
  • Construction of road and installation of 4 way solar light according to the document attach

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Lucknow· #304467

    ₹31.0 L Awaiting sanction · 76 daysRec. 17 Aug 2026
  • Approval of Rs 466 for Letter No-4139 ,146 one way solar lights according to the letter attached

    Electricity & lightingLighting of public spaces· Lucknow· #300073

    ₹466 Awaiting sanction · 93 daysRec. 31 Jul 2026
  • Relocation of solar lights according to the list attached

    Electricity & lightingLighting of public spaces· Lucknow· #292473

    ₹10 Awaiting sanction · 117 daysRec. 7 Jul 2026
  • Relocation of 4 way lights according to the list attached

    Electricity & lightingLighting of public spaces· Lucknow· #292687

    ₹10 Awaiting sanction · 117 daysRec. 7 Jul 2026
  • Installation of 38 one Way solar Light

    Electricity & lightingLighting of public spaces· Lucknow· #281445

    ₹7.8 L Awaiting sanction · 167 daysRec. 18 May 2026
  • Construction of New drain lines along the roadside, according to the list, attach

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Lucknow· #266890

    ₹9.9 L Completed 22 Apr 2026Rec. 14 Feb 2026Paid ₹9.9 L
  • Construction of New drainage line along both sides of the road according to the list attached

    Irrigation, flood & environmentConstruction of flood control embankments/protection walls along riverbanks, hilltops, roadsides· Lucknow· #266891

    ₹7.3 L Completed 22 Apr 2026Rec. 14 Feb 2026Paid ₹7.3 L
  • Electric ation of Mulayam Singh cricket Stadium with transformer

    Electricity & lightingLighting of public spaces· Lucknow· #277793

    ₹17.5 L Awaiting sanction · 203 daysRec. 12 Apr 2026
  • installation of 143 solar light 1 way according to the list attach

    Electricity & lightingLighting of public spaces· Sitapur· #259646

    ₹30.1 L Work partially Completed · 10 Apr 2026Rec. 18 Jan 2026Paid ₹22.5 L
  • Installation of 25 solar lights according to the list attached

    Electricity & lightingLighting of public spaces· Lucknow· #277141

    ₹5.3 L Awaiting sanction · 215 daysRec. 31 Mar 2026
  • Renovation of Ambedkar Park according to the list attached

    Community buildings & public spacesDevelopment of public parks· Lucknow· #277143

    ₹14.2 L Awaiting sanction · 215 daysRec. 31 Mar 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.