Payments concentrated with one vendor
52% of vendor payments went to BHAGWATI CHAND.
Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
97%
₹14.33 Cr recommended · 1,402 works
Above median (76%)
Paid to vendors
₹8.03 Cr
55% of allocation
Above median (37%)
Works completed
727
52% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP1,402 works
₹14.33 Cr · 97% of the ₹14.70 Cr allocated
- Sanctioned by the district1,381 works
99% sanctioned · took 2.5 months on average (due within 45 days)
- Completed727 works
₹3.51 Cr final cost · 12.1 months from recommendation on average
21 works are still awaiting sanction, 13 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 1,402 works worth ₹14.33 Cr, a fund utilisation of 97%, higher than 88% of 18th Lok Sabha MPs.
- The district has sanctioned 1,381 of them, taking 2.5 months on average.
- ₹8.03 Cr has been paid to vendors, 55% of the allocation.
- 727 works are complete, typically 12.1 months after recommendation. 454 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Electricity & lighting.
- Payments went to 16 vendors. The largest received 52%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 60/100: finishing works counts most
- Works completed 30%52Completed ÷ recommended works.
- Spending efficiency 20%44Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%97Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%62Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%55Paid to vendors ÷ allocated limit.
- Vendor diversity 10%60How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: BHAGWATI CHAND, 52% of payments across 16 vendors.
District sanction speed
95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
1,402 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
GRAM BARJI ANTARGAT RAMPUR KUWAR MARG PAR RAMRAJKE CHAK SE SIYARAM KE MACHINE TAK CC ROAD KA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325086
₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026GRAM MURDI ANTARGAT PURV PRADHAN RAM KIRAT YADAV KE GHAR KE PEECHE SAHJADI DEVI SIYARAM YADAV KE KHET TAK HYUM PIPE KA KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325087
₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026GRAM SINDHURIYA PINDRAYI PICH ROAD SE CHANDRIKA PRASAD KE GHAR TAK CC ROAD KA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325088
₹4.6 L Awaiting sanction · 2 daysRec. 30 Oct 2026GRAM KURI ME KURI SULTANPUR MARG STHIT MURARI GOND KE GHAR KE PASS SE SITARAM PAL KE MAKAN TAK CC ROAD KA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325089
₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026GRAM DEV JI BALOYI ME SURENDRA KANNAUJIYA KE GHAR SE PICH ROAD TAK CC ROAD KA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325090
₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026GRAM MARUEE PICH ROAD SE DUHAAN PATEL BASTI SE LALLU PATEL KE MAKAN SE VIPUL PATEL KE MAKAN TAK CC ROAD KA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325091
₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026GRAM AMAUT JENGAR ME HARINATH PATEL KE GHAR SE DR SURESH PATEL KE GHAR TAK CC ROAD KA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325092
₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026BLOCK BADAGAON ME STHIT GRAM SABHA KHARARIYA KHAS LAUKIPUR ME STHIT SADHOGANJ BIRAV MARG PAR RAMESH BANWASI KE GHAR SE PRAVIN PATEL KE GHAR TAK CC ROAD KA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325093
₹8.3 L Awaiting sanction · 2 daysRec. 30 Oct 2026RAM SHIROMANI YADAV SON RAM DEV YADAV K GHAR K PASS 01 NAG SOLAR LIGHT
Electricity & lightingStreet lights· Jaunpur· #181167
₹19,834 Completed 12 Oct 2026Rec. 29 Mar 2025Paid ₹19,834S J ACADEMY SCHOOL SHIVPUR MADIYAHU ME MULTI OPEN FITNESS GYM EQUIPMENT
Sports & fitnessInstallation of multi-gym equipment· Jaunpur· #229227
₹6.5 L Completed 15 Sept 2026Rec. 26 Aug 2025Paid ₹6.5 LGRAM MAHANGUPUR,JAMALAPUR SUBASH PATEL KE GHAR KE PASS INTERLOCKING PAR CC ROAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304829
₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026GRAM JAGADISHPUR ANTARGAT RAMESH CHANDRA MAURY KE GHAR SE JAWAHAR LAL MAURY KE GHAR TAK CC ROAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304830
₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026GRAM IMAMSHAHPUR ANTRGAT PRATHMIK VIDYALAY SE LALJI MAURY KE GHAR TAK CC ROAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304831
₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026GRAM NARAYNPUR KHANDJA PULIYA SE RAMPRASAD KE GHAR TAK NALA NIRMAN KARY
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304832
₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026GRAM SURERI SAROJ BASTI SE YADAV BASTI PAR CC ROAD
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304833
₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.