Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Priya Saroj

Lok SabhaSPSC seatMachhlishahr · Uttar Pradesh

MP score60/100214th of 542 in the 18th Lok Sabha
41st of 80 from Uttar Pradesh
  • Payments concentrated with one vendor

    52% of vendor payments went to BHAGWATI CHAND.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

97%

₹14.33 Cr recommended · 1,402 works
Above median (76%)

Paid to vendors

₹8.03 Cr

55% of allocation
Above median (37%)

Works completed

727

52% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP1,402 works

    ₹14.33 Cr · 97% of the ₹14.70 Cr allocated

  2. Sanctioned by the district1,381 works

    99% sanctioned · took 2.5 months on average (due within 45 days)

  3. Completed727 works

    ₹3.51 Cr final cost · 12.1 months from recommendation on average

21 works are still awaiting sanction, 13 of them for more than 45 days.

In plain words

What the numbers say

  • Recommended 1,402 works worth ₹14.33 Cr, a fund utilisation of 97%, higher than 88% of 18th Lok Sabha MPs.
  • The district has sanctioned 1,381 of them, taking 2.5 months on average.
  • ₹8.03 Cr has been paid to vendors, 55% of the allocation.
  • 727 works are complete, typically 12.1 months after recommendation. 454 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Electricity & lighting.
  • Payments went to 16 vendors. The largest received 52%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 60/100: finishing works counts most

  1. Works completed 30%52Completed ÷ recommended works.
  2. Spending efficiency 20%44Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%97Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%62Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%55Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    60
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: BHAGWATI CHAND, 52% of payments across 16 vendors.

District sanction speed

95/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%95Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

1,402 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • GRAM BARJI ANTARGAT RAMPUR KUWAR MARG PAR RAMRAJKE CHAK SE SIYARAM KE MACHINE TAK CC ROAD KA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325086

    ₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • GRAM MURDI ANTARGAT PURV PRADHAN RAM KIRAT YADAV KE GHAR KE PEECHE SAHJADI DEVI SIYARAM YADAV KE KHET TAK HYUM PIPE KA KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325087

    ₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • GRAM SINDHURIYA PINDRAYI PICH ROAD SE CHANDRIKA PRASAD KE GHAR TAK CC ROAD KA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325088

    ₹4.6 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • GRAM KURI ME KURI SULTANPUR MARG STHIT MURARI GOND KE GHAR KE PASS SE SITARAM PAL KE MAKAN TAK CC ROAD KA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325089

    ₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • GRAM DEV JI BALOYI ME SURENDRA KANNAUJIYA KE GHAR SE PICH ROAD TAK CC ROAD KA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325090

    ₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • GRAM MARUEE PICH ROAD SE DUHAAN PATEL BASTI SE LALLU PATEL KE MAKAN SE VIPUL PATEL KE MAKAN TAK CC ROAD KA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325091

    ₹10.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • GRAM AMAUT JENGAR ME HARINATH PATEL KE GHAR SE DR SURESH PATEL KE GHAR TAK CC ROAD KA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325092

    ₹5.0 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • BLOCK BADAGAON ME STHIT GRAM SABHA KHARARIYA KHAS LAUKIPUR ME STHIT SADHOGANJ BIRAV MARG PAR RAMESH BANWASI KE GHAR SE PRAVIN PATEL KE GHAR TAK CC ROAD KA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Varanasi· #325093

    ₹8.3 L Awaiting sanction · 2 daysRec. 30 Oct 2026
  • RAM SHIROMANI YADAV SON RAM DEV YADAV K GHAR K PASS 01 NAG SOLAR LIGHT

    Electricity & lightingStreet lights· Jaunpur· #181167

    ₹19,834 Completed 12 Oct 2026Rec. 29 Mar 2025Paid ₹19,834
  • S J ACADEMY SCHOOL SHIVPUR MADIYAHU ME MULTI OPEN FITNESS GYM EQUIPMENT

    Sports & fitnessInstallation of multi-gym equipment· Jaunpur· #229227

    ₹6.5 L Completed 15 Sept 2026Rec. 26 Aug 2025Paid ₹6.5 L
  • GRAM MAHANGUPUR,JAMALAPUR SUBASH PATEL KE GHAR KE PASS INTERLOCKING PAR CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304829

    ₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026
  • GRAM JAGADISHPUR ANTARGAT RAMESH CHANDRA MAURY KE GHAR SE JAWAHAR LAL MAURY KE GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304830

    ₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026
  • GRAM IMAMSHAHPUR ANTRGAT PRATHMIK VIDYALAY SE LALJI MAURY KE GHAR TAK CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304831

    ₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026
  • GRAM NARAYNPUR KHANDJA PULIYA SE RAMPRASAD KE GHAR TAK NALA NIRMAN KARY

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304832

    ₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026
  • GRAM SURERI SAROJ BASTI SE YADAV BASTI PAR CC ROAD

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Jaunpur· #304833

    ₹10.0 L Sanctioned · 2 Sept 2026Rec. 17 Aug 2026

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.