Skip to content
MPLADSTracker

MPLADS report card · 18th Lok Sabha

Pankaj Chowdhary

Lok SabhaBJPMaharajganj · Uttar Pradesh

MP score71/10074th of 542 in the 18th Lok Sabha
18th of 80 from Uttar Pradesh
  • Payments concentrated with one vendor

    94% of vendor payments went to MS RAMESH CHANDRA PATEL.

Allocated limit

₹14.70 Cr

Median ₹14.70 Cr

Fund utilisation

66%

₹9.76 Cr recommended · 49 works
Below median (76%)

Paid to vendors

₹9.59 Cr

65% of allocation
Above median (37%)

Works completed

42

86% of recommended
Above median (28%)

From recommendation to completion

Every work this MP recommended, by stage

  1. Recommended by the MP49 works

    ₹9.76 Cr · 66% of the ₹14.70 Cr allocated

  2. Sanctioned by the district49 works

    100% sanctioned · took 45 days on average (due within 45 days)

  3. Completed42 works

    ₹9.03 Cr final cost · 11.5 months from recommendation on average

In plain words

What the numbers say

  • Recommended 49 works worth ₹9.76 Cr, a fund utilisation of 66%, higher than 34% of 18th Lok Sabha MPs.
  • The district has sanctioned 49 of them, taking 45 days on average.
  • ₹9.59 Cr has been paid to vendors, 65% of the allocation.
  • 42 works are complete, typically 11.5 months after recommendation. 27 works have geo-tagged photos on eSAKSHI.
  • The largest share of funds went to Roads & bridges.
  • Payments went to 8 vendors. The largest received 94%.
  • No citizen ratings have been reported for completed works.

How the score is made

MP score 71/100: finishing works counts most

  1. Works completed 30%86Completed ÷ recommended works.
  2. Spending efficiency 20%94Value of completed works ÷ money paid out. Money paid without works finished scores low.
  3. Fund utilisation 15%66Value of works recommended ÷ allocated limit (MoSPI’s measure).
  4. Proof of work 15%64Share of completed works with photos or documents uploaded on eSAKSHI.
  5. Funds spent 10%65Paid to vendors ÷ allocated limit.
  6. Vendor diversity 10%
    i

    Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.

    7
    How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.

Largest vendor: MS RAMESH CHANDRA PATEL, 94% of payments across 8 vendors.

District sanction speed

100/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank

  1. Sanction speed 100%100Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.

Activity over time

Recommendations, payments and completions by month

Value of works MPs recommended each month

Who got paid

Top vendors by payments received

Implementing district authorities

The districts that sanction and execute this MP’s works

Works

49 works · tap “Photos” to see geo-tagged photos from eSAKSHI

Open in explorer
  • Village Bodna Tola Naudihawa me one piece Baarat ghar nirman

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Mahrajganj· #154637

    ₹23.2 L Completed 3 Sept 2026Rec. 26 Nov 2024Paid ₹23.2 L
  • Village Dhamur me one piece Baarat ghar nirman kary

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Mahrajganj· #154645

    ₹23.1 L Completed 3 Sept 2026Rec. 26 Nov 2024Paid ₹23.1 L
  • Village Kishunpur me one piece baarat ghar ke nirman

    Community buildings & public spacesConstruction of additional rooms and halls in the existing public and community building· Mahrajganj· #154647

    ₹23.2 L Completed 3 Sept 2026Rec. 26 Nov 2024Paid ₹23.2 L
  • Gram Patrengawan Tola Arnahawa me Bhim rao Ambedkar park ke Dakshin marg par 3 meter Puliya

    Roads & bridgesConstruction of culverts and bridges· Mahrajganj· #247476

    ₹19.4 L Completed 3 Sept 2026Rec. 18 Nov 2025Paid ₹19.4 L
  • Gram Pipra munderi me main road se paschim PP pratham ke raste par 2 meter puliya

    Roads & bridgesConstruction of culverts and bridges· Mahrajganj· #247472

    ₹11.7 L Completed 1 Sept 2026Rec. 18 Nov 2025Paid ₹11.7 L
  • Gram Pipraich urf Pachrukhiya me Shambhu ke khet ke pass 4 meter puliya

    Roads & bridgesConstruction of culverts and bridges· Mahrajganj· #247485

    ₹24.5 L Completed 1 Sept 2026Rec. 18 Nov 2025Paid ₹24.5 L
  • Village Bishunpur me Rajdev ke khet ke pass 1x4 meter RCC Puliya

    Roads & bridgesConstruction of culverts and bridges· Mahrajganj· #256578

    ₹24.7 L Completed 1 Sept 2026Rec. 1 Jan 2026Paid ₹24.7 L
  • Gram Shishghrah me Primary Vidhyalay se Rajaram Prajapati ke ghar tak 200 meter CC ROad

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahrajganj· #247331

    ₹24.2 L Completed 29 Aug 2026Rec. 18 Nov 2025Paid ₹24.2 L
  • Gram Kamasin Khurd Main Road se Rajesh Yadav ke Ghar tak 200 meter CC Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahrajganj· #247313

    ₹21.6 L Completed 27 Aug 2026Rec. 18 Nov 2025Paid ₹21.6 L
  • BMCT Road se Amahwa ke Bich 3 meter RCC Puliya

    Roads & bridgesConstruction of culverts and bridges· Mahrajganj· #247314

    ₹20.0 L Completed 27 Aug 2026Rec. 18 Nov 2025Paid ₹20.0 L
  • Gram Jungal Jaralaha kanchanpur Tole par Jharela ke Ghar tak 200 meter CC Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahrajganj· #247317

    ₹19.3 L Completed 27 Aug 2026Rec. 18 Nov 2025Paid ₹19.3 L
  • Gram Jungal Gulahariya me Rajeshwar Chauhan ke Ghar main Road tak 200 meter CC Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahrajganj· #247318

    ₹24.5 L Completed 25 Aug 2026Rec. 18 Nov 2025Paid ₹24.5 L
  • Gram pokharbhinda tola Nagesarpur me Omprakash ke ghar tak 200 meter CC Rorad

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahrajganj· #247320

    ₹24.8 L Completed 25 Aug 2026Rec. 18 Nov 2025Paid ₹24.8 L
  • Nagar Palika Nautanwa ward no 13 me mistri ke ghar se subhash prajapati ke ghar se hote huye guddu malik ke ghar tak CC Road

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahrajganj· #247326

    ₹24.2 L Completed 25 Aug 2026Rec. 18 Nov 2025Paid ₹24.2 L
  • Gram karmahva tola satorpur PWD road se dinesh ke ghar tak 200 meter CC ROad

    Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Mahrajganj· #247328

    ₹24.8 L Completed 25 Aug 2026Rec. 18 Nov 2025Paid ₹24.8 L

18th Lok Sabha MPs from Uttar Pradesh

Ranked by MP score

Compare
#MPUtilisationSpentCompletedScore
1Shri Narendra Modi · Varanasi62%60%20789
2Rajkumar Chahar · Fatehpur Sikri90%71%4584
3Awadhesh Prasad · Faizabad98%65%14384
4Utkarsh Verma Madhur · Kheri85%53%34983
5Shri Arun Kumar Sagar · Shahjahanpur100%94%583
6Vinod Kumar Bind · Bhadohi81%58%52582
7Ramesh Awasthi · Kanpur84%57%10479
8Babu Singh Kushwaha · Jaunpur79%39%62278
9Daroga Prasad Saroj · Lalganj65%56%21276
10Mohibbullah · Rampur75%51%31876
11Neeraj Maurya · Aonla100%91%1775
12Mukesh Rajput · Farrukhabad99%91%24674

Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.