Allocated limit
₹14.70 Cr
Median ₹14.70 Cr
Fund utilisation
52%
₹7.63 Cr recommended · 81 works
Below median (76%)
Paid to vendors
₹3.98 Cr
27% of allocation
Below median (37%)
Works completed
15
19% of recommended
Below median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP81 works
₹7.63 Cr · 52% of the ₹14.70 Cr allocated
- Sanctioned by the district74 works
91% sanctioned · took 5.2 months on average (due within 45 days)
- Completed15 works
₹1.74 Cr final cost · 18.1 months from recommendation on average
7 works are still awaiting sanction, 7 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 81 works worth ₹7.63 Cr, a fund utilisation of 52%, higher than 14% of 18th Lok Sabha MPs.
- The district has sanctioned 74 of them, taking 5.2 months on average.
- ₹3.98 Cr has been paid to vendors, 27% of the allocation.
- 15 works are complete, typically 18.1 months after recommendation. 15 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 19 vendors. The largest received 21%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 50/100: finishing works counts most
- Works completed 30%19Completed ÷ recommended works.
- Spending efficiency 20%44Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%52Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%27Paid to vendors ÷ allocated limit.
- Vendor diversity 10%98How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: Ms Mahendra Kumar Uttam, 21% of payments across 19 vendors.
District sanction speed
78/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%78Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
81 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
VIKAS KHAND AMAULI KE KANJARAN KA DERA MAJRE NONARA ME damar road se road RAM KUMAR GIHAR KE GHAR TAK CC ROAD KA NIRMAN KARYA (APPROX 100 METR.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166393
₹10.4 L Completed 30 Oct 2026Rec. 28 Jan 2025Paid ₹10.4 LBLOCK VIJAYPUR GRAM MEERPUR POST AILAE ME PRATHMIK VIDYALAYA SE KALI MATA MANDIR TAK CC DURI 100M
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #187485
₹11.6 L Completed 6 Sept 2026Rec. 28 Mar 2025Paid ₹11.6 LBLOCK AMOLI GRAM NIRKHI MAJRE ALIYAPUR ME RAHUL TIWARI KE GHAR SE MAHAVEER KE GHAR TAK RCC DURI 150M
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #187461
₹16.6 L Completed 30 Aug 2026Rec. 28 Mar 2025Paid ₹16.6 Lvikas khand devmai ke gram ishepur ke ajay utaam ke ghar se daya shankar kje ghar tak cc road ka nirman karya (approx 160 metre)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166401
₹12.1 L Completed 26 Aug 2026Rec. 28 Jan 2025Paid ₹12.1 Lvikas khand devmai ke gram alampur me yashpal kushwaha ke ghar se neta ki gumti tak cc road ka nirman karya (approx 250 metr.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166402
₹19.7 L Completed 26 Aug 2026Rec. 28 Jan 2025Paid ₹19.7 Lvikas khand devmai ke gram rampur bakewarme rampur pakki road se rakesh patel urf baba ji ke ghar tak cc road ka nirman karya ( approx 200 metr.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166412
₹13.1 L Completed 24 Aug 2026Rec. 28 Jan 2025Paid ₹13.1 LBLOCK KHAJUA GRAM KHOONTA MARG SE MAJHOLWA SE JAYPAL VERMA KE DARWAJE TA CC DURI 200M
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #187476
₹13.8 L Completed 24 Aug 2026Rec. 28 Mar 2025Paid ₹13.8 LBLOCK DEV MAI LACHHIKHEDA DEV MAI SAMPARK MARG SE RANITAL ME HARISHCHANDRA PASWAN KE MAKAN TAK RCC DURI 130M
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #187497
₹11.0 L Completed 24 Aug 2026Rec. 28 Mar 2025Paid ₹11.0 Lvikas khand khajuha ke gram bardara me phul chandra ke ghar se maheshwar mandir tak cc road ka nirman karya (approx 200 metr.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166415
₹19.1 L Completed 19 Aug 2026Rec. 28 Jan 2025Paid ₹19.1 LBLOCK KHAJUA GRAM NAYA PURWA TENDULI LAKHNIPUR ME JAGRUP KE DARWAJE SE RAMPRATAP SAHU KE GHAR TAK CC DURI 70M
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #187473
₹8.0 L Completed 19 Aug 2026Rec. 28 Mar 2025Paid ₹8.0 Lvikas khan vijaipur ke gram shivpur me ramphal maurya ke ghar se ram karan singh ke ghar hote hue ajay singh fauji ke ghar tak cc road ka nirman karya (approx 160 metr.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166408
₹6.7 L Completed 16 Aug 2026Rec. 28 Jan 2025Paid ₹6.7 LVIKAS KHAND MALVA KE GRAM NAMAMAU ME AMAR PATEL KE GHAR SE JAYSHANKAR KE GHAR TAK CC ROAD KA NIRMAN KARYA (APPROX 150 MTR.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166390
₹7.1 L Completed 14 Aug 2026Rec. 28 Jan 2025Paid ₹7.1 Lvikas khand teliyani ke gram rawtpur me parmu pasi ke ghar se late khannu pasi ke ghar tak cc road ka nirman karya (approx 30 metr.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166407
₹1.3 L Completed 14 Aug 2026Rec. 28 Jan 2025Paid ₹1.3 Lvikas khand teliyani me gram chitaura me ram sanehi ke ghar se prhlad aur bhola ke ghar hote hue ashok patel ke ghar tak cc road ka nirman karya (approx 140 metr.)
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #166417
₹14.3 L Completed 14 Aug 2026Rec. 28 Jan 2025Paid ₹14.3 LBLOCK MALWA GRAM BAHRAULI ME VIRENDRA YADAV KE GHAR SE BHURAE YADAV KE TAK RCC DURI 100M
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Fatehpur· #187499
₹9.0 L Completed 14 Aug 2026Rec. 28 Mar 2025Paid ₹9.0 L
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.