Allocated limit
₹14.88 Cr
Median ₹14.70 Cr
Fund utilisation
100%
₹14.88 Cr recommended · 173 works
Above median (76%)
Paid to vendors
₹8.97 Cr
60% of allocation
Above median (37%)
Works completed
71
41% of recommended
Above median (28%)
From recommendation to completion
Every work this MP recommended, by stage
- Recommended by the MP173 works
₹14.88 Cr · 100% of the ₹14.88 Cr allocated
- Sanctioned by the district141 works
82% sanctioned · took 51 days on average (due within 45 days)
- Completed71 works
₹6.04 Cr final cost · 8.5 months from recommendation on average
32 works are still awaiting sanction, 32 of them for more than 45 days.
In plain words
What the numbers say
- Recommended 173 works worth ₹14.88 Cr, a fund utilisation of 100%, higher than 99% of 18th Lok Sabha MPs.
- The district has sanctioned 141 of them, taking 51 days on average.
- ₹8.97 Cr has been paid to vendors, 60% of the allocation.
- 71 works are complete, typically 8.5 months after recommendation. 71 works have geo-tagged photos on eSAKSHI.
- The largest share of funds went to Roads & bridges.
- Payments went to 20 vendors. The largest received 21%.
- No citizen ratings have been reported for completed works.
How the score is made
MP score 72/100: finishing works counts most
- Works completed 30%41Completed ÷ recommended works.
- Spending efficiency 20%67Value of completed works ÷ money paid out. Money paid without works finished scores low.
- Fund utilisation 15%100Value of works recommended ÷ allocated limit (MoSPI’s measure).
- Proof of work 15%100Share of completed works with photos or documents uploaded on eSAKSHI.
- Funds spent 10%60Paid to vendors ÷ allocated limit.
- Vendor diversity 10%99How spread out payments are: full marks when no vendor gets over 20% of the money, none when one vendor gets everything.
i
Members of Parliament (MPs) do not have direct, operational control over the specific vendors selected for government public works. However, they exert significant indirect influence by shaping procurement frameworks, passing supplier diversity laws, and conducting oversight.
Largest vendor: DEV CONSTRUCTION, 21% of payments across 20 vendors.
District sanction speed
90/100 · sanction is the district authority’s job, so this doesn’t change the MP’s rank
- Sanction speed 100%90Average days to sanction (full marks within the 45-day guideline, none at a year), and the share of works not overdue.
Activity over time
Recommendations, payments and completions by month
Sectors
Value of works by category
Who got paid
Top vendors by payments received
Implementing district authorities
The districts that sanction and execute this MP’s works
Works
173 works · the 60 most recent are listed here, all of them in the explorer · tap “Photos” to see geo-tagged photos from eSAKSHI
Gram Hasanpur block Khurja Amesh Singh Baba ke ghar se Ashok ke ghar tak rasta nirman karya 64 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302214
₹9.0 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Jamalpur Farana block Khurja mein Rajendra ke ghar se lekar Raju ke ghar tak interlocking va nali nirman 83 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302216
₹4.7 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Kyauli Kalan block Khurja mein Netrapal ke ghar se Sokat ke ghar tak interlocking va nali nirman 60 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302217
₹9.0 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Nekpur block Khurja mein Gopal Daroga ji ke ghar se Shiv Mandir tak interlocking va nali nirman 117.30 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302218
₹6.5 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Kapna block Khurja mein Dinesh Sharma ke ghar se Panchayat ghar ki aur interlocking va nali nirman 81.50 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302219
₹9.0 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Hasanpur Laduki block Khurja mein Jeetan ke ghar se Indrapal Prajapat ke makan tak tatha Samal ke ghar se Sonu ke ghar tak interlocking va nali nirman 105.10 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302220
₹4.1 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Samaspur mein Vijay ke ghar se Sonpal ke ghar ki aur interlocking va nali nirman 82 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302222
₹9.0 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Ishanpur block Khurja mein Hukampal ke yahan se Mandir/Rajesh ghar tak interlocking va nali nirman 144.50 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302223
₹5.1 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Panchayat Bhagwanpur block Khurja mein Mahesh Solanki ke ghar se Kali Sadak ki aur CC nirman 79 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302224
₹6.3 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Gram Panchayat Bhutgadi block Khurja mein Sundarpal ke ghar se Satpal ke ghar ki aur interlocking va nali nirman 60 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #302225
₹4.5 L Sanctioned · 17 Sept 2026Rec. 8 Aug 2026Sharma treaders chotpur colony sector 63 me kailash roy ke ghar hote huye pankaj ke ghar ki ore interlocking v naali nirman 115 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gautam Buddha Nagar· #166931
₹7.5 L Completed 16 Sept 2026Rec. 20 Jan 2025Paid ₹7.5 LChotpur colony me Jayveer ke ghar se Hanuman mandir ki ore interlocking v naali nirman 70 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Gautam Buddha Nagar· #166932
₹7.4 L Completed 16 Sept 2026Rec. 20 Jan 2025Paid ₹7.4 LGram Azampur Husainpur block secundrabad mein main road se raju ke makaan tak interlocking va naali nirman 194 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #295745
₹10.7 L Time Estimation · 9 Sept 2026Rec. 16 Jul 2026Gram Vair block Sikadnrabad mein banti ke ghar se sunil ke ghar tak interlocking v naali nirman 57 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #295746
₹3.3 L Vendor Identification · 9 Sept 2026Rec. 16 Jul 2026Paid ₹3.2 LGram Vair block sikandrabad mein banti ki dukan se vinod ke chauk tak interlocking v naali nirman 52 meter
Roads & bridgesConstruction of roads, link roads, pathways or any other road with or without drainage system· Bulandshahr· #295747
₹2.9 L Vendor Identification · 9 Sept 2026Rec. 16 Jul 2026Paid ₹2.9 L
18th Lok Sabha MPs from Uttar Pradesh
Ranked by MP score
| # | MP | Utilisation | Spent | Completed | Score |
|---|---|---|---|---|---|
| 1 | Shri Narendra Modi · Varanasi | 62% | 60% | 207 | 89 |
| 2 | Rajkumar Chahar · Fatehpur Sikri | 90% | 71% | 45 | 84 |
| 3 | Awadhesh Prasad · Faizabad | 98% | 65% | 143 | 84 |
| 4 | Utkarsh Verma Madhur · Kheri | 85% | 53% | 349 | 83 |
| 5 | Shri Arun Kumar Sagar · Shahjahanpur | 100% | 94% | 5 | 83 |
| 6 | Vinod Kumar Bind · Bhadohi | 81% | 58% | 525 | 82 |
| 7 | Ramesh Awasthi · Kanpur | 84% | 57% | 104 | 79 |
| 8 | Babu Singh Kushwaha · Jaunpur | 79% | 39% | 622 | 78 |
| 9 | Daroga Prasad Saroj · Lalganj | 65% | 56% | 212 | 76 |
| 10 | Mohibbullah · Rampur | 75% | 51% | 318 | 76 |
| 11 | Neeraj Maurya · Aonla | 100% | 91% | 17 | 75 |
| 12 | Mukesh Rajput · Farrukhabad | 99% | 91% | 246 | 74 |
Source: MoSPI eSAKSHI (eSAKSHI API (mplads.mospi.gov.in)). Fund utilisation = works recommended ÷ allocated limit (MoSPI’s definition); spent = vendor payments ÷ allocated limit; completion = completed ÷ recommended works. The MP score weighs completion, spending efficiency, utilisation, proof of work, spending and vendor diversity. How it’s calculated.